Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81,900Accepted-Finance | ₹81,900 | L1 | Accepted-Finance Price bid approved |
| 2 | L2₹86,200Accepted-Finance | ₹86,200 | L2 | Accepted-Finance Price bid approved |
| Sl No | Description | Qty | Unit | PRINCE ELECTRICALS L1 | SWETHA ENGINEERING CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for complete O/H of LT Motor of capacity 0.75 KW . Including cost of consumable T&P hire charges. | 8 | Nos | 14,000 ₹16,520 | 14,400 ₹16,992 |
| 2.00 | Charges for complete O/H of LT Motor of capacity 2.2 KW. Including cost of consumable T&P hire charges. | 6 | Nos | 12,600 ₹14,868 | 13,200 ₹15,576 |
| 3.00 | Charges for complete O/H of LT Motor of capacity 4 KW. Including cost of consumable T&P hire charges. | 4 | Nos | 10,800 ₹12,744 | 11,200 ₹13,216 |
| 4.00 | Charges for complete O/H of LT Motor of capacity 11 KW. Including cost of consumable T&P hire charges. | 2 | Nos | 11,200 ₹13,216 | 11,800 ₹13,924 |
| 5.00 | Charges for complete O/H of LT Motor of capacity 15 KW. Including cost of consumable T&P hire charges. | 2 | Nos | 14,400 ₹16,992 | 14,600 ₹17,228 |
| 6.00 | Fabrication of motor end cover bearing sleeve and fixing up to 5.6 KW. Including cost of consumable T&P hire charges and material. | 3 | Nos | 4,500 ₹5,310 | 6,000 ₹7,080 |
| 7.00 | Fabrication of motors end cover bearing sleeve and fixing Upto 45 KW. Including cost of consumable T&P hire charges and material. | 2 | Nos | 14,400 ₹16,992 | 15,000 ₹17,700 |
Tender Value
Refer Docs
Closing Date
12 Feb 2026, 2:00 pmClosed
CE/TTPS
Chief Engineer Tuticorin Thermal Power Station-Tuticorin
TTPS ES Circle EM II Overhauling of LT Motors in Boiler and mill area and valve motors in Boiler area of unit I during Capital overhaul period of 2025 2026
2026_EB_648588_1
CE/SE/ES/TTPS/No.227/2025-26
Open Tender
Electrical and Maintenance Works
40 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
Yes
16 Feb 2026
29 Jan 2026
13 Feb 2026
29 Jan 2026
12 Feb 2026
29 Jan 2026
Charges for complete O/H of LT Motor of capacity 0.75 KW . Including cost of consumable T&P hire charges.
Charges for complete O/H of LT Motor of capacity 2.2 KW. Including cost of consumable T&P hire charges.
Charges for complete O/H of LT Motor of capacity 4 KW. Including cost of consumable T&P hire charges.
Charges for complete O/H of LT Motor of capacity 11 KW. Including cost of consumable T&P hire charges.
Charges for complete O/H of LT Motor of capacity 15 KW. Including cost of consumable T&P hire charges.
Fabrication of motor end cover bearing sleeve and fixing up to 5.6 KW. Including cost of consumable T&P hire charges and material.
Fabrication of motors end cover bearing sleeve and fixing Upto 45 KW. Including cost of consumable T&P hire charges and material.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_777577.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid