Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | -41.97% | ₹2.8 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 LAdmitted-Finance | -38.89% | ₹3.0 L | L2 | Admitted-Finance |
| 3 | L3₹3.0 LAdmitted-Finance | -38.22% | ₹3.0 L | L3 | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹9,800
Closing Date
6 Aug 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Constt. of lane and drain from house of sh. Pardeep Singh to sh. Nain singh house at w.no.2 and link near house of sh. Devender kumar to onwards w.no.1 PYT. D.K.Lower Block Miran Sahib Year 2026-27 under PRI Capex
2026_RDPR_317581_2
e-NIT No. 252 REWJ of 2026-27 dated 23-07-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹9,800
27 Aug 2026
24 Jul 2026
7 Aug 2026
24 Jul 2026
6 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | General site clearance including levelling of ground and disposal of material. (LS) | 6 | no | 553 | ₹3,318 |
| 2 | Dismantling tile work in floors and roofs laid in cement mortar including
stacking material within 50 meters lead.
15.23.1 For thickness of tiles 10 mm to 25 mm | 97.03 | sqm | 57 | ₹5,530.71 |
| 3 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil | 25.67 | cum | 479.3 | ₹12,303.63 |
| 4 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 5.13 | cum | 4,826.5 | ₹24,759.95 |
| 5 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 28.75 | cum | 5,733.6 | ₹1,64,841 |
| 6 | Boulders | 12.32 | cum | 937 | ₹11,543.84 |
| 7 | Centring and shuttering including strutting, propping etc and removal of the formwork. | 107.81 | sqm | 286.35 | ₹30,871.39 |
| 8 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 33.69 | sqm | 416.5 | ₹14,031.88 |
| 9 | P/Laying in position specified grade of reinforcement Cement concrete including curing but excluding cost of centering shuttering and reinforcement all work upto plinth level | 3.37 | cum | 7,788.4 | ₹26,246.91 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | 303.06 | kg | 123.2 | ₹37,336.99 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_1041361.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].