Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.8 LAdmitted-Finance 0 0 RAMNAGAR FATEHPUR ROAD KADIRABAD GRAM BUDHWAL PARGANA AND TEHSIL RAMNAGAR BARABANKI UTTAR PRADESH 225202 | BARABANKI | UTTAR PRADESH | 225202 | -24.00% | ₹23.8 L | L1 | Admitted-Finance |
| 2 | L2₹26.6 L+₹2.9 L (12.0%)Admitted-Finance | -14.89% | ₹26.6 L+₹2.9 L (12.0%) | L2 | Admitted-Finance |
| 3 | L3₹30.5 L+₹6.7 L (28.3%)Admitted-Finance | -2.52% | ₹30.5 L+₹6.7 L (28.3%) | L3 | Admitted-Finance |
| 4 | L4₹30.9 L+₹7.2 L (30.1%)Admitted-Finance | -1.10% | ₹30.9 L+₹7.2 L (30.1%) | L4 | Admitted-Finance |
| 5 | L5₹31.0 L+₹7.2 L (30.3%)Admitted-Finance | -1.00% | ₹31.0 L+₹7.2 L (30.3%) | L5 | Admitted-Finance |
Tender Value
₹31.3 L
EMD Value
₹62,575
Closing Date
5 Aug 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJANI NAIDU MARG CIVIL LINES PRAYAGRAJ
Zone-08 Ward-09 Sonauti ke antargat Durjanpur me Dinesh Bhartiya ke makan se Lallu Yadav ke makan hote hue G T Road tak, aur Shobha Bhartiya se Kolahal Market tak CC sadak nirmaan aur gali marammat karya.
2026_NNAMC_1173018_3
05.08.2026
Open Tender
Civil Works
Percentage
60 days
CIVIL LINES
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,660
AS PER DOCS
₹62,575
19 Sept 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of existin enchrochment like ramp, platform etc monolethic structure and inding stacking of materials with all complete work | 2,850 | Sqm | 51 | ₹1,45,350 |
| 2 | Earth work Exavation in Ordinary soil lead lift &30 m lead with aqll complete work (S.I.No.251) | 85.5 | cum | 200 | ₹17,100 |
| 3 | Earth work cutting/Filling of embankment lead 30 m and up to 1.5 m lift with all complete work (S.I.No.253) | 712.5 | cum | 87.3 | ₹62,201.25 |
| 4 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) | 73.6 | cum | 5,300 | ₹3,90,080 |
| 5 | Struck Pointing (1:2) cement sand mortor including all complete work (S.I.No.574) | 817 | sqm | 197 | ₹1,60,949 |
| 6 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 195 | cum | 1,654.8 | ₹3,22,686 |
| 7 | Cement concrete with cement, sand & 20mm gauge stone grit with the proportion of (1:2:4) including all complete the work. | 234 | Cum | 8,200 | ₹19,18,800 |
| 8 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) | 1.68 | Cum | 9,300 | ₹15,624 |
| 9 | M.S iron work including cutting bending and praper laying all complete work (S.I.No.504) | 1.31 | qtl | 6,200 | ₹8,122 |
| 10 | Cartage of earth upto 5 km. distance from site with all complete work. | 478.8 | cum | 183.5 | ₹87,859.8 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
Tendernotice_2.pdf
PDF • 1.50 MB
BOQ_2202821.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .