Loading…
Loading…
Tender Value
₹89.2 L
EMD Value
₹1.8 L
Closing Date
16 Jul 2026, 5:00 pm
General Manager Procurement and Contracts
PROCUREMENT AND CONTRACTS, SALAL POWER STATION, NHPC LIMITED, DISTT. REASI, UT OF JandK
Construction of Community hall in Village Dera Banda Bahadur near Kundrah, Reasi including Solar Street Lights.
2026_NHPC_914357_1
NH/SPS/PnC/NIT218/ 26-27/192-201
Open Tender
Civil Works
360 days
SALAL POWER STATION, DISTT REASI, UT OF JandK
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
NHPC LIMITED
₹1.8 L
Yes
23 Jun 2026
23 Jun 2026
20 Jul 2026
23 Jun 2026
16 Jul 2026
23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works | |||||
| 1.01 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 134.16 | Cum | 187.3 | ₹25,128.17 |
| 1.02 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 209.45 | Cum | 218.4 | ₹45,743.88 |
| 1.03 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 24.51 | Cum | 5,733.6 | ₹1,40,530.54 |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 103.06 | Sqm | 286.35 | ₹29,511.23 |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for: Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 224.7 | Sqm | 577.55 | ₹1,29,775.48 |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts. | 86.94 | Sqm | 742.55 | ₹64,557.3 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for: Weather shades, chajjas, corbels etc. including edges. | 28.36 | Sqm | 1,037.35 | ₹29,419.25 |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | 385.5 | Sqm | 718.2 | ₹2,76,866.1 |
| 1.09 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 13,343.04 | Kg | 123.2 | ₹16,43,862.53 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_961052.xls
BOQ • 0.45 MB
Finaltender.pdf
Tender Documents • 4.66 MB
Download all tender documents and submit your bid