| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.6 CrAccepted-AOC | ₹36.6 Cr Quoted ₹37.4 Cr | L1 | Accepted-AOC tender Accept |
| 2 | L2₹37.8 CrRejected-Finance | ₹37.8 Cr | L2 | Rejected-Finance Financial Bid rejected being Higher Rate |
| 3 | L3₹37.9 CrRejected-Finance | ₹37.9 Cr | L3 | Rejected-Finance Financial Bid rejected being Higher Rate |
| 4 | Not Admitted-Fee/PreQual/Technical 0 ABHISHEK ENTERPRISES CHARWA PACHIMTHOK KAUSHAMBI UTTAR PRADESH 212203 | KAUSHAMBI | UTTAR PRADESH | 212203 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
12 Apr 2021, 12:00 pmClosed
SE Unnao Circle PWD Unnao
SE Unnao Circle PWD Unnao
WIDENING and STRENGTHNING OF ACHALGANJ PURWA ROAD. ODR KM 1 TO 25-200- SANCTIONED IN FY-2020-21 UNDER STATE SECTOR SCHEME IN DISTT. UNNAO
2021_CEUCZ_576010_1
2485MT/1MT/E-Tender/UC/20 Dt. 24-03-2021
Open Tender
Civil Works
365 days
Unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹50 L
Yes
SE Unnao Circle PWD Unnao
18 Jun 2021
25 Mar 2021
13 Apr 2021
25 Mar 2021
12 Apr 2021
27 Mar 2021
27 Mar 2021
Amount
Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2. (Including labour Cess & Excluding GST)
Excavation for roadwork in soil with hydraulic excavator of 0.9um bucket capacity including cutting and loading in tippers, trimming bottom and side slope in accordance with requirements of lines, grades and cross section and transporting to the embankement location within all lifft and lead. (Including labour Cess & Excluding GST)
Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2.(for compaction) (Including labour Cess & Excluding GST)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including labour Cess & Excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including labour Cess & Excluding GST)
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site , laying with 1% OPC cement and 3.5% emulsion in uniform single layer on subbase/base and compacting with the road roller to achieve the desire density. (Including labour Cess & Excluding GST)
Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared surface cleaned with hydraulic broom. (Including labour Cess & Excluding GST)
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour by VG-30 using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.(Including labour Cess & Excluding GST)
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour by VG-30 using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (Including labour Cess & Excluding GST)
Construction of U-Type Drain Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Including labour Cess & Excluding GST)
Construction of U-Type Drain Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Including labour Cess & Excluding GST)
Construction of U-Type Drain Providing and laying reinforced cement concrete M 20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 (Including labour Cess & Excluding GST)
Construction of U-Type Drain Supplying fitting and placing TMT bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses. (Including labour Cess & Excluding GST)
For Extra Widening at T- juction Link Roads Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2. (Including labour Cess & Excluding GST)
For Extra Widening at T- juction Link Roads Excavation for roadwork in soil with hydraulic excavator of 0.9um bucket capacity including cutting and loading in tippers, trimming bottom and side slope in accordance with requirements of lines, grades and cross section and transporting to the embankement location within all lifft and lead. (Including labour Cess & Excluding GST)
For Extra Widening at T- juction Link Roads Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2.(for compaction) (Including labour Cess & Excluding)
For Extra Widening at T- juction Link Roads Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including labour Cess & Excluding GST)
For Extra Widening at T- juction Link Roads Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site , laying with 1% OPC cement and 3.5% emulsion in uniform single layer on subbase/base and compacting with the road roller to achieve the desire density. (Including labour Cess & Excluding GST)
For Extra Widening at T- juction Link Roads Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared surface cleaned with hydraulic broom. (Including labour Cess & Excluding GST)
For Extra Widening at T- juction Link Roads Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour by VG-30 using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects (Including labour Cess & Excluding GST)
Construction /widening of 600mm Hume pipe Culvert Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Including labour Cess & Excluding GST)
Construction /widening of 600mm Hume pipe Culvert Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (Including labour Cess & Excluding GST)
Construction /widening of 600mm Hume pipe Culvert Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Including labour Cess & Excluding GST)
Construction /widening of 600mm Hume pipe Culvert Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations. (Including labour Cess & Excluding GST)
Construction /widening of 600mm Hume pipe Culvert Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. (Including labour Cess & Excluding GST)
Construction /widening of 600mm Hume pipe Culvert Plastering with cement mortar (1:3) in substructure/ superstracutre as per technical specification. (Including labour Cess & Excluding GST)
Construction /widening of 1000mm Hume pipe Culvert Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Including labour Cess & Excluding GST)
Construction /widening of 1000mm Hume pipe Culvert Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Including labour Cess & Excluding GST)
Construction /widening of 1000mm Hume pipe Culvert Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (Including labour Cess & Excluding GST)
Construction /widening of 1000mm Hume pipe Culvert Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations . (Including labour Cess & Excluding GST)
Construction /widening of 1000mm Hume pipe Culvert Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. (Including labour Cess & Excluding GST)
Construction /widening of 350mm Hume pipe Culvert Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets. (350 mm dia HP Culvert) (Including labour Cess & Excluding GST)
Construction (Extension) of 3.00 mt. Span RCC Slab. Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Including labour Cess & Excluding GST)
Construction (Extension) of 3.00 mt. Span RCC Slab. Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Including labour Cess & Excluding GST)
Construction (Extension) of 3.00 mt. Span RCC Slab. Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations . (Including labour Cess & Excluding GST)
Construction (Extension) of 3.00 mt. Span RCC Slab. Furnishing and placing reinforced cement concrement in super structure as per drawing and Technical Specifications. (M-20) (Including labour Cess & Excluding GST)
Construction (Extension) of 3.00 mt. Span RCC Slab. Supplying fitting and placing TMT bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses. (Including labour Cess & Excluding GST)
Construction (Extension) of 3.00 mt. Span RCC Slab. Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. (Including labour Cess & Excluding GST)
Construction (Extension) of 2.00 mt. Span RCC Slab. Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Including labour Cess & Excluding GST)
Construction (Extension) of 2.00 mt. Span RCC Slab. Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Including labour Cess & Excluding GST)
Construction (Extension) of 2.00 mt. Span RCC Slab. Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations. (Including labour Cess & Excluding GST)
Construction (Extension) of 2.00 mt. Span RCC Slab. Furnishing and placing reinforced cement concrement in super structure as per drawing and Technical Specifications. (M-20) (Including labour Cess & Excluding GST)
Construction (Extension) of 2.00 mt. Span RCC Slab. Supplying fitting and placing TMT bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses. (Including labour Cess & Excluding GST)
Construction (Extension) of 2.00 mt. Span RCC Slab. Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. (Including labour Cess & Excluding GST)
Construction of Minor Bridge 3x3 mt., 9 x 3mt. & 2x8 mt. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres as per Technical Specification Clause 202 (Including labour Cess & Excluding GST)
Construction of Minor Bridge 3x3 mt., 9 x 3mt. & 2x8 mt. Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Including labour Cess & Excluding GST)
Construction of Minor Bridge 3x3 mt., 9 x 3mt. & 2x8 mt. Plain cement concrement 1:2:4 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.as per drawing and technical speficiations Clauses 802,803,1202 & 1203 (M-15) (Including labour Cess & Excluding GST)
Construction of Minor Bridge 3x3 mt., 9 x 3mt. & 2x8 mt. Plain/reinforced cement concrete M 30 grade in sub-structure complete as per drawing and technical specifications clauses 802, 804, 805, 806, 807, 1202 and 1204 (Including labour Cess & Excluding GST)
Construction of Minor Bridge 3x3 mt., 9 x 3mt. & 2x8 mt. Supplying fitting and placing mild bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses 1002, 1010 and 1202 (Including labour Cess & Excluding GST)
Construction of Minor Bridge 3x3 mt., 9 x 3mt. & 2x8 mt. Sand Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 (Including labour Cess & Excluding GST)
Construction of Minor Bridge 3x3 mt., 9 x 3mt. & 2x8 mt. Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 (Including labour Cess & Excluding GST)
Construction of Minor Bridge 3x3 mt., 9 x 3mt. & 2x8 mt. Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 (Including labour Cess & Excluding GST)
Construction of Minor Bridge 3x3 mt., 9 x 3mt. & 2x8 mt. Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 (Including labour Cess & Excluding GST)
Construction of Minor Bridge 3x3 mt., 9 x 3mt. & 2x8 mt. Drainage spouts complete as per drawing and technical specifications Clause 1209 (Including labour Cess & Excluding GST)
Construction of Minor Bridge 3x3 mt., 9 x 3mt. & 2x8 mt. Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. (Including labour Cess & Excluding GST)
Construction of Minor Bridge 3x3 mt., 9 x 3mt. & 2x8 mt. Providing and laying of compression seal joint consisting of steel armoured nosing at two edges of the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer compressed and fixed into the joint gap with special adhesive binder to cater for a horizontal movement upto 40 mm and vertical movement of 3 mm. as per drawing and technical specifications Clause 2600 (Including labour Cess & Excluding GST)
JAI SHAKTI CONSTRUCTION
M/s Chopra Traders
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid