| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.1 LAccepted-AOC 13 1 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹16.1 L Quoted ₹16.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹17.0 LRejected-AOC M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹17.0 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | THIAGARAJAN ENGINEERING CONTRACTOR L2 | KUMAR ERECTORS L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for dislocated platen Super heater assembly and its bring back to original position. | 5 | Assy | 54,250 ₹2,71,250 | 52,831 ₹2,64,155 Lowest |
| 2.00 | Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. | 60 | Joints | 8,010 ₹4,80,600 | 7,798 ₹4,67,880 Lowest |
| 3.00 | Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. | 5 | Time | 16,160 ₹80,800 | 15,736 ₹78,680 Lowest |
| 4.00 | Charges for Replacement of Dummied Platen coil in Boiler I pass area at 34 mtr to 52 mtr. ( This work involves i) Access and preparation, ii) Removal of old/Damaged section, iii) new dummy coil preparation, iv) Installation and welding v) Restoration and commisioning. (Material will be supplied by TNPGCL at free of cost). | 2 | Bank | 2,14,300 ₹4,28,600 | 2,08,701 ₹4,17,402 Lowest |
| 5.00 | Charges for repairing arresting bands, leading inside the Boiler, position making alignment and IBR welder joints | 2 | Bank | 1,14,370 ₹2,28,740 | 1,11,384 ₹2,22,768 Lowest |
| 6.00 | Charges for cleaning and inspection of all the platen SH Assembly and strenthening of support attachment to prevent dislocated platen SH assembly. | 29 | Assy | 6,650 ₹1,92,850 | 6,461 ₹1,87,369 Lowest |
| 7.00 | chromotherm-1 (E 8018) welding electrode 2.5 mm | 420 | Nos. | 8.3 ₹3,486 | 8.14 ₹3,418.8 Lowest |
| 8.00 | Cutting gas | 0.5 | Set | 4,250 ₹2,125 | 4,134 ₹2,067 Lowest |
| 9.00 | Argon gas for TIG welding | 0.5 | Set | 3,400 ₹1,700 | 3,304 ₹1,652 Lowest |
| 10.00 | T & Ps and consumables | 1 | LS | 6,500 ₹6,500 | 6,311 ₹6,311 Lowest |
Tender Value
Refer Docs
EMD Value
₹14,800
Closing Date
25 Feb 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM unit I Inspection and rectification of dislocated platen super heater coil assembly removal and bring back to its original position and rectification of defective tube and allied works
2026_EB_655387_1
CE / MTPS-I / SE / M-I / BM /OT. 516 / 2025-26
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹14,800
Yes
21 Aug 2026
11 Feb 2026
26 Feb 2026
11 Feb 2026
25 Feb 2026
11 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for dislocated platen Super heater assembly and its bring back to original position. | 5 | Assy | - | - |
| 2 | Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. | 60 | Joints | - | - |
| 3 | Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. | 5 | Time | - | - |
| 4 | Charges for Replacement of Dummied Platen coil in Boiler I pass area at 34 mtr to 52 mtr. ( This work involves i) Access and preparation, ii) Removal of old/Damaged section, iii) new dummy coil preparation, iv) Installation and welding v) Restoration and commisioning. (Material will be supplied by TNPGCL at free of cost). | 2 | Bank | - | - |
| 5 | Charges for repairing arresting bands, leading inside the Boiler, position making alignment and IBR welder joints | 2 | Bank | - | - |
| 6 | Charges for cleaning and inspection of all the platen SH Assembly and strenthening of support attachment to prevent dislocated platen SH assembly. | 29 | Assy | - | - |
| 7 | chromotherm-1 (E 8018) welding electrode 2.5 mm | 420 | Nos. | - | - |
| 8 | Cutting gas | - | Set | - | - |
| 9 | Argon gas for TIG welding | - | Set | - | - |
| 10 | T & Ps and consumables | 1 | LS | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_785823.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].