Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹21.2 L
EMD Value
₹25,000
Closing Date
11 Sept 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GOBI/EDC
Superintending Engineer, Gobi Electricity Distribution Circle, 110/11 KV Gobi SS Campus, Vettaikarankovil, Gobi-638476.
Works Contract for line works at South Gobi Sub division
2023_EB_366298_1
ET No.33/23-24,Dt.25.08.2023
Open Tender
Electrical Works
Works
30 days
GOBI EDC
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
Yes
12 Sept 2023
2 Sept 2023
12 Sept 2023
2 Sept 2023
11 Sept 2023
2 Sept 2023
Amount
Excavation of pole pit size upto 27' Pole by using JCB or manual
Excavation of Stay pit 4.5' to 5' by using JCB or manual
Excavation of pole pit size above 8 Mts PSC/RCC/RSJ Pole by using JCB or manual
Excavation of pit in Hard rock requires without blasting(where houses are located)
Erection of RCC poles/PSC Poles /metal poles upto 27'(8.0m) pole by using JCB or manual
Erection of RCC poles/PSC Poles/metal poles above 8 mtrs pole by using JCB or manual
Erection of RSJ ,Rail and fabricated poles above 9.0m pole by using JCB or manual
Erection of stay set complete
Fixing of HT "V" cross arms (all types)/Channel cross arms/Guarding Cross arms
Fixing of LT 3 phase cross arms
Fixing of LT Single phase ph X arm
Fixing of Tapping Xarm
Fixing of HT/LT TI fittings
Fixing of HT Pin insulator 11 KV
Fixing of HT 11KV strain Disc
Fixing of LT pin insulators
Fixing of LT shackle with MP
Fixing of Aluminium Knob
Earthing of pole with pin including burying ,looping and binding
Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/4.09 mm
Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/3.35 mm or AAAC 7/3.15 mm conductor
Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/2.59 mm or AAAC 7/2.50mm conductor
Structure Concreting , Concreting of poles including cost of( Cement ,jelly and Sand Blue matals and watering)
Sleeve concreting including materials ( Cement ,jelly and Sand and Blue materials and water)
Stay concreting including cost of materials and Labour 375 mmx375 mmx50mm
Erection of Transformer structure complete in all respects with wiring ,Earthing,fixing of open type fuse units,HT/LT LAS and jumpering 3 Nos Earth pits with collar including painting of metal parts , structure poles, fixing of top channel ,seating channel,belting angel including concreting (Except erection of Transformer) Double pole str
Dismantling of Double Pole Transformer Structure
Erection of D.P structure with AB switch,top channel,cross bracing earthing,painting ,providing stay including concreting (Except erection of Transformer)
Dismantling of Double Pole DP Structure
Erection of Single pole Transformer structure complete in all respects with wiring ,Earthing,fixing of open type fuse units,HT/LT LAS and jumpering 3 Nos Earth pits with collar including painting of metal parts , structure poles, fixing of top channel ,seating channel,belting angel including concreting (Except erection of Transformer)
Guarding arrangements with Flat guarding including fixing of 2Nos. Cross arms HT/LT
Loading of metal poles ( all sizes)
Unloading of metal poles ( all sizes)
Loading of poles up to 8 M RCC/PSC poles
Loading of poles above 8 m RCC/PSC poles
UnLoading of poles up to 8 M RCC/PSC poles
UnLoading of poles above 8 M RCC/PSC poles
Transporting of poles from road side to pole pit Location including loading and unloading of poles by using JCB or Manual Up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual above 100 m
Loading or unloading of Transformer upto 100 KVA to 250 KVA and Metering set
Loading or unloading of Transformer above 250 KVA
Resagging of HT/LT line with ACSR 7/4.09mm
Re-sagging of HT / LT line with ACSR 7/3.35mm or AAAC 7 /3.15 mm conductor
Re-sagging of HT / LT with ACSR 7/2.59mm or AAAC 7 /2.50 mm conductor
Erection of street light including fixture fitting
Erection of street light service
Agriculture service fixing/service
Releasing of single phase service wire and re-fixing.
Releasing of 3 phase service wire (upto 50 HP) and re-fixing.
Releasing of 3 phase service wire (above 50 HP) and re-fixing.
Releasing of grills from RCC poles
Erection of new transformer for all capacities and HT metering set
Labour charges for alteration of Back clamps to suit for the works
Labour charges for alteration of Stay clamps to suit for the works
Releasing of ACSR/AAAC conductors from conductor drum and coiling ACSR 7/3.35, 7/2.59, AAAC 7/2.50, 7/3.15 MM (Per/Km.)
Cutting of coconut leaves /per tree
Cleaning of branches of tree per tree
Drilling of hole in channel only 3/4" & 1" per hole
Set right the leaning of poles
Engaging of JCB/Crane for first 2Hrs
Engaging of JCB/Crane For Every additional Hrs
Painting of metal poles including cross arm (excluding cost of paint)
Cutting of RSJ poles
T.I.Fitting welding with clamps
Cutting of flat
Cutting of channel
Cutting of Angle
Cutting of pipe
Dismandling of pole above 8.0 mtr
Dismandling of pole up to 8.0 mtr
Dismandling of 'V' X arm(all types),channel X arm,guarding X arm
Dismandling of LT 3 phase X arm
Dismandling of LT single phase X arm
Dismandling of HT/LT TI fitting
Dismandling of 11KV strain disc
Dismandling of 11 KV/22KV pin insulator
Dismandling of LT shackle
Dismandling of LT pin insulator
Dismandling of Aluminium knob
Dismandling of stay set
Dismandling of ACSR 7/3.35mm orAAAC 7/3.15 conductor
Dismandling of ACSR 7/2.59mm or 7/2.11mm conductor
Dismandling of street light service
Loading of materials
Unloading of materials
Leading and stacking of materials
Dismandling of 1x40w FTL fitting (CFL)
Provision of Earth pit collar
Fixing of Danger Board
Providing LT bus bar arrangement in distn.Trs structure location
Painting of all clamps and other materials and painting of structure pole for double pole structure.
Painting of all clamps and other materials and painting of structure pole for single pole structure
Painting of all clamps and other materials and painting of structure pole for DP structure
Feeder arrangements with Open Type fuse Units per 1 Feeder
Base concreting of transformer structure
LT cable arrangements
Provision of Distribution Transformer Name Board, ( Name of the 22/11 KV feeder , Name of the SS , Capacity of the DT).
HARISIVAM AND CO
SRIVISHNU ELECTRICAL WORKS
stage.html
html • 0.02 MB
finance_436812.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .