Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | +0.00% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 L+₹3,098.81 (2.05%)Admitted-Finance SARBAPALLY P O NONACHANDAN PUKUR NORTH 24 PGS PIN 700 122 WEST BENGAL | NORTH 24 PARGANAS | WEST BENGAL | 700122 | +2.05% | ₹1.5 L+₹3,098.81 (2.05%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 L+₹5,895.29 (3.90%)Admitted-Finance 174 BAKSARA L M C SARANI JAMRULTALA HOWRAH WEST BENGAL 711110 | HOWRAH | WEST BENGAL | 711110 | +3.90% | ₹1.6 L+₹5,895.29 (3.90%) | L3 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹3,100
Closing Date
12 Sept 2026, 1:00 pmClosed
OFFICE OF EE(CIVIL)
THE KOLKATA MUNICIPAL CORPORATION 97 AND 98 GARFA MAIN ROAD
SUPPLY AND SPREADING SILVER SAND FOR FESTIVAL PURPOSE AT DIFFERENT PLACES IN WARD NO-106.
2026_KMC_1040107_1
KMC/EE(C)/BR-XII/26-27
Open Tender
CIVIL WORKS
Percentage
60 days
BOROUGH XII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,100
17 Sept 2026
1 Sept 2026
14 Sept 2026
1 Sept 2026
12 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MATERIALS AND LABOUR 1. Building (A) Materials delivered and stacked at site: 6)d)Silver Sand. Note: 1. The above rates are inclusive of all charges such as Royalty, Supervision Charges, etc. and also include allowance for sinkage, as applicable, and/or shrinkage and 10% Contractor?s Profit but exclusive of GST 2. Rates for Sand and Brick/ Jhama/ Bats items are complete rates at site and no other costs need to be considered. For other items, necessary loading-unloading & carriage charges are admissible. 3. Laterrite Boulder &Moorum are available in the districts as mentioned in Sl. No. ? 23 & 24 respectively, remaining districts may add necessary carriage cost as applicable. | - | M3 | - | - |
| 2 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | - | EA | - | - |
| 3 | Sub Total | - | - | - | - |
| 4 | GST 18% | - | Nos. | - | - |
| 5 | CESS 1% | - | Nos. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
PREQUE.pdf
Additional Documents • 0.17 MB
FORM-106_15.pdf
Tender Documents • 0.57 MB
BOQ_2554230.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .