Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.9 LAdmitted-Finance PRAYAGRAJ | UTTAR PRADESH | 211001 | -28.27% | ₹25.9 L | L1 | Admitted-Finance |
| 2 | L2₹26.2 LAdmitted-Finance | -27.52% | ₹26.2 L | L2 | Admitted-Finance |
| 3 | L3₹27.9 LAdmitted-Finance | -22.79% | ₹27.9 L | L3 | Admitted-Finance |
| 4 | L4₹31.2 LAdmitted-Finance NONE | NEW DELHI | DELHI | 110001 | -13.53% | ₹31.2 L | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹38.1 L
EMD Value
₹3.6 L
Closing Date
18 Feb 2026, 2:00 pmClosed
Executive Engineer Minor Irrigation Div- prayagraj
Executive Engineer Minor Irrigation Div- prayagraj
GATA NUMBER 172 POND, VILLEGE KHARHAR BLOCK SHIVGARH, PRATAPGARH
2026_UPMID_1114494_1
2096/MI/AC/NividaSuchna/25-26 dt. 04.02.2026
Open Tender
Civil Works
30 days
GATA NUMBER 172 POND, VILLEGE KHARHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹900
Executive Engineer Minor irrigation division
₹3.6 L
Yes
20 Feb 2026
13 Feb 2026
18 Feb 2026
13 Feb 2026
18 Feb 2026
13 Feb 2026
Earth work in Excavation in Ordinary Soil by poclain M/C and shifting of Excavated Soil with Tractor Trolly
Earth work in Excavation in Ordinary Soil by Manual Labour and shifting of Excavated Soil with Tractor Trolly
Dewatering chargess before Digging By 5.0 H.P.Diesel Pump set with P.O.L. & operetor
Earth work in excavation in foundations
Cement Concrete (1:3:6) cement, Sand & 20-40 mm Brick Ballast for foundation Inlet I/c cost of materials labour etc.
Brick work in 1:4 cement sand work I/c cost of materials labour etc.
Laying andSupply of 900 mm NP3 hume pipe with collar including laying ( with carraige 15% ) with collar
P.C.C. 1:2:4 Cement,C.sand & 20 mm S. Grite I/c cost of materials labour etc.
Struck pointing in 1:2 cement sand mortar I/c cost of materials labour etc.
Dry stone boulder filing I/C cost of material labour etc.
Cement Plaster 1:4 cement mortar 10-12 mm thickness I/C all
B.O.E. Soaling With S.O.B. Bricks
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.70 MB
BOQ_2066751.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid