| 1 | L1₹47.8 LAccepted-AOC NO 4ARUN AVENUE SIVANATHA NAGAR K PUDHUR MADURAI 625 007 | MADURAI | TAMIL NADU | 625007 | L1 | Accepted-AOC Quoted Lowest rate and
Executed Agreement on 22.12.2022 after negotiation | |
| 2 | L2₹49.3 L+₹1.5 L (3.10%)Rejected-Finance 1 136 SOUTH STREET MUTHUMOOTHANMOZHI RADHAPURAM TALUK TIRUNELVELI DISTRICT 627 657 | TIRUNELVELI | TAMIL NADU | 627657 | L2 | Rejected-Finance L2 |
Tender Value
₹49.4 L
EMD Value
₹50,000
Closing Date
14 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector (Dev)/Project Director, DRDA
O/O AC (D) / PD DRDA Thoothukudi
ThoothukudiDt AGAMTII 21-22 PkgNoTN/TUT-52/22-23 Creation of Infrastructure facilities to the samathuva Burial Ground in Kothali, Paraikuttam, Kurkkuchalai, Ottapidaram and Veppalodai Village Panchayats in Ottapidaram Block
2022_RDTN_237656_54
AC(D)/PD,DRDA,Tuty,Lr.No A3/2573/2022 dt.20.06.202
Open Tender
Civil Works
Item Rate
180 days
Thoothukudi District
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹50,000
O/O AC (D) / PD DRDA Thoothukudi
10 Jan 2023
11 Jul 2022
14 Sept 2022
11 Jul 2022
14 Sept 2022
11 Jul 2022
11 Jul 2022
Amount
Upgratation of Burial Ground approach road and Construction of 5.0 mtr span culvert at kothali Panchayat
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Cement concrete1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete.
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Below Sill Level
Above Sill Level
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete.
Reinforced Cement Concrete 1:11/2:3 using 20 mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and excluding cost and fabrication of steel and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete for Deck slab
Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification
CC PAVEMENT
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete., For Foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Construction of Compound Wall and Cement concrete pavement at Paraikuttam Burial Ground in Paraikuttam Panchayat ( 25.00 mtr)
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Above Sill Level
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Below Sill Level
Cement concrete 1:3:6 mix using to 20mm ISS HBG metal including all cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:2:4 mix using to 20mm ISS HBG metal including all cost and conveyance of all materials and all labour charges etc., complete.
Reinforced Cement Concrete 1:11/2:3 using 20 mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and excluding cost and fabrication of steel and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete for Deck slab
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Painting two coats with Emulsion Paint over the one coat of Priming coat all materials to site and all labour charges etc comoplete for 100 Sqm
Construction of Cremation shed,Waiting shed, Compound wall at Front side , CC pavement and Hand pump at Samathuva Burial ground in Kurukkusalai village
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Refilling the basement with Gravel including cost and conveyance and Labour charges etc.,
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Supplying and erecting centering for sides and soffits including cost and conveyance of materials and all labour charges etc complete
Supplying, fabricating and placing MS or RTS rods in position including cost and conveyance of materials and all labour charges etc complete
R.C.C. 1:1 1/2:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Ceiling Plastering with C. M 1:3 mix, 10 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Construction of Waiting Shed
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Reinforced Cement Concrete 1:11/2:3 using 20 mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and excluding cost and fabrication of steel and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete for Deck slab
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - with struting)
Granolethic floor finish with cement concrete 1:2:4 mix using 10-12mm ISS chips including cost and conveyance of all materials and all labourcharges etc, complete.
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Construction of Compound Wall
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete., For Foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Reinforced Cement Concrete 1:11/2:3 using 20 mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and excluding cost and fabrication of steel and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete for Deck slab
Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Painting two coats with Emulsion Paint over the one coat of Priming coat all materials to site and all labour charges etc comoplete for 100 Sqm
Cement Concrete Pavement
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete., For Foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Providing Hand Pump Arrangement
Supply And Delivery of 150mm dia PVC Plain Casing Pipe & Specials
Labour Charges For Erection Hand Pump
Construction of Compound wall (Front side) and cement pavement at Samathuva Burial ground in Ottapidaram village
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete., For Foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Reinforced Cement Concrete 1:11/2:3 using 20 mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and excluding cost and fabrication of steel and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete for Deck slab
Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Painting two coats with Emulsion Paint over the one coat of Priming coat all materials to site and all labour charges etc comoplete for 100 Sqm
Cement Concrete Pavement
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete., For Foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Construction of Cremation shed , Waiting shed and compound wall (front side) and approach road at Vengadachalapuram in Veppalodai Panchayat
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Refilling the basement with Gravel including cost and conveyance and Labour charges etc.,
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Supplying and erecting centering for sides and soffits including cost and conveyance of materials and all labour charges etc complete
Supplying, fabricating and placing MS or RTS rods in position including cost and conveyance of materials and all labour charges etc complete
R.C.C. 1:1 1/2:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Ceiling Plastering with C. M 1:3 mix, 10 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Providing Approach Road
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete., For Foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Collection and supply of Red gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and Laying Paver Block of 60mm thick approved design made out of 12mm and 6mm HBGS chips in M30 mix properly cured to attain the required strength, Laying and interlocking block and well compacted using 1-3 ton capacity compressor, the cost inclusive of all materials for manufacturing, interlocking block loading transportation to work site unloading and labour charges for fixing over Sand bed of 30mm thick & Joints filling using compressor of 1-3 ton capacity including hire and fuel charges for compressor and all other incidental charges etc complete.
Construction of Waiting Shed
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Reinforced Cement Concrete 1:11/2:3 using 20 mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and excluding cost and fabrication of steel and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete for Deck slab
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - with struting)
Granolethic floor finish with cement concrete 1:2:4 mix using 10-12mm ISS chips including cost and conveyance of all materials and all labourcharges etc, complete.
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
White washing two coats with best shell lime including cost and convyance of all materials to work site and labour charges etc., complete.
Construction of Compound Wall
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete., For Foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
R.C.C. 1:1 1/2:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Painting two coats with Emulsion Paint over the one coat of Priming coat all materials to site and all labour charges etc comoplete for 100 Sqm
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Aadirudhan Construction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .