Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.9 LAccepted-Finance | ₹4.9 L | 1 | Accepted-Finance L1 |
| 2 | 2₹5.2 L+₹23,957 (4.88%)Rejected-Finance | ₹5.2 L+₹23,957 (4.88%) | 2 | Rejected-Finance L2 |
| 3 | 3₹5.2 L+₹28,819.40 (5.87%)Rejected-Finance | ₹5.2 L+₹28,819.40 (5.87%) | 3 | Rejected-Finance L3 |
| 4 | 4₹5.4 L+₹50,695.40 (10.3%)Rejected-Finance 01 SORANA NAKUR SAHARANPUR UTTAR PRADESH 247232 | SAHARANPUR | UTTAR PRADESH | 247232 | ₹5.4 L+₹50,695.40 (10.3%) | 4 | Rejected-Finance L4 |
| 5 | 5₹5.5 L+₹54,815.06 (11.2%)Rejected-Finance M 254 AASHIYANA COLONY LDA COLONY KANPUR ROAD LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹5.5 L+₹54,815.06 (11.2%) | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S SINGH CONSTRUCTION COMPANY L4 | M/S INDRAWATI CONSTRATION L6 | j p enterprises L5 | M/S SHIV SHAKTI CONSTRUCTION COMPANY L1 | LAKSHYA CONSTRUCTION & TRADERS L2 | M/S SUSHIL KUMAR SINGH CONTACTOR L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work in lime of cement mortar including stacking of materials as directed by engineer —in —charge with in a distance of 60 m. | 12.65 | Cum | 500 ₹6,325 | 500 ₹6,325 | 444 ₹5,616.6 | 300 ₹3,795 Lowest | 400 ₹5,060 | 400 ₹5,060 |
| 2.00 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge. | 45.33 | Cum | 50 ₹2,266.5 Lowest | 100 ₹4,533 | 93 ₹4,215.69 | 50 ₹2,266.5 Lowest | 200 ₹9,066 | 70 ₹3,173.1 |
| 3.00 | Laying of C.C. 1:4:8 ( M-7.5) in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and Crushed stone Grit ( 20 mm to 40mm) including all cost of materials,T&P and labours etc. complete. | 7.56 | Cum | 8,000 ₹60,480 | 9,000 ₹68,040 | 7,659 ₹57,902.04 | 8,000 ₹60,480 | 8,500 ₹64,260 | 7,000 ₹52,920 Lowest |
| 4.00 | Centering and shuttering for R.C.C. work including all cost of materials,T&P , labours and other accessories required for proper completion of work. | 61.13 | Sqm | 600 ₹36,678 | 700 ₹42,791 | 663 ₹40,529.19 | 300 ₹18,339 Lowest | 800 ₹48,904 | 400 ₹24,452 |
| 5.00 | 1st class brick work in 1:4 cement mortar with class brick M-150, coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work | 18.89 | Cum | 6,400 ₹1,20,896 | 5,000 ₹94,450 Lowest | 5,400 ₹1,02,006 | 6,500 ₹1,22,785 | 7,000 ₹1,32,230 | 5,000 ₹94,450 Lowest |
| 6.00 | 1st class brick work in 1:4 cement mortar with old brick received from dismentaling of old wall , coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work. | 4.3 | Cum | 3,000 ₹12,900 | 2,500 ₹10,750 | 2,492 ₹10,715.6 Lowest | 2,500 ₹10,750 | 3,000 ₹12,900 | 2,500 ₹10,750 |
| 7.00 | 12mm thick plaster with cement in proportion of 1:3 ( cement and fine sand FM not over 1.25 ) ,brick work minimum thickness not than 10mm including supply of all material labour t and p etc required for proper completion of the work. | 187.85 | Sqm | 140 ₹26,299 | 100 ₹18,785 | 118 ₹22,166.3 | 100 ₹18,785 | 110 ₹20,663.5 | 80 ₹15,028 Lowest |
| 8.00 | Laying R.C.C. work in 1:2:4 (M20) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for Slab, pier cap and abutment cap stir including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. | 12.33 | Cum | 1,300 ₹16,029 Lowest | 8,000 ₹98,640 | 8,100 ₹99,873 | 8,000 ₹98,640 | 7,000 ₹86,310 | 7,500 ₹92,475 |
| 9.00 | Bending, binding cutting placing in position reinforcement steel including cost of binding wire and tack wilding with material and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. | 1.36 | MT | 71,000 ₹96,276 | 71,145 ₹96,472.62 | 55,413 ₹75,140.03 | 6,000 ₹8,136 Lowest | 6,500 ₹8,814 | 68,500 ₹92,886 |
| 10.00 | Structural steel work riveted, bolted or welded in builtup sections, trusses etc ..and applying a priming coat steel primer . | 944.4 | Kg. | 130 ₹1,22,772 | 100 ₹94,440 Lowest | 103 ₹97,273.2 | 120 ₹1,13,328 | 100 ₹94,440 Lowest | 105 ₹99,162 |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
13 Jun 2026, 12:00 pmClosed
Executive Engineer,
Executive Engineer, Flood Work Division-1st, Basti, Uttar Pradesh
Lot-06
2026_UPIDC_1157881_6
01/EE/2026-27
Open Tender
Civil Works
Item Wise
7 days
Basti
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹14,000
4 Aug 2026
8 Jun 2026
13 Jun 2026
8 Jun 2026
13 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work in lime of cement mortar including stacking of materials as directed by engineer —in —charge with in a distance of 60 m. | - | Cum | - | - |
| 2 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge. | 1 | Cum | - | - |
| 3 | Laying of C.C. 1:4:8 ( M-7.5) in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and Crushed stone Grit ( 20 mm to 40mm) including all cost of materials,T&P and labours etc. complete. | 1 | Cum | - | - |
| 4 | Centering and shuttering for R.C.C. work including all cost of materials,T&P , labours and other accessories required for proper completion of work. | - | Sqm | - | - |
| 5 | 1st class brick work in 1:4 cement mortar with class brick M-150, coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work | - | Cum | - | - |
| 6 | 1st class brick work in 1:4 cement mortar with old brick received from dismentaling of old wall , coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work. | 1 | Cum | - | - |
| 7 | 12mm thick plaster with cement in proportion of 1:3 ( cement and fine sand FM not over 1.25 ) ,brick work minimum thickness not than 10mm including supply of all material labour t and p etc required for proper completion of the work. | 1 | Sqm | - | - |
| 8 | Laying R.C.C. work in 1:2:4 (M20) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for Slab, pier cap and abutment cap stir including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. | - | Cum | - | - |
| 9 | Bending, binding cutting placing in position reinforcement steel including cost of binding wire and tack wilding with material and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. | - | MT | - | - |
| 10 | Structural steel work riveted, bolted or welded in builtup sections, trusses etc ..and applying a priming coat steel primer . | 1 | Kg. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.07 MB
BOQ_2170020.xls
BOQ • 0.32 MB
Lot-06.pdf
Tender Documents • 1.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .