Loading…
Loading…
Tender Value
₹9.2 Cr
EMD Value
₹18.3 L
Closing Date
30 Sept 2026, 4:00 pm3d left
Estates Officer, SKUAST-Jammu
Estates Division, SKUAST-J, Chatha
Construction remodeling of existing Guest House including internal electrification, sanitary and A.C. fittings etc. at Rail Head Complex, SKUAST Jammu
2026_SKUST_323701_3
AU/Estates/2026-27/11 dated 01-09-2026
Open Tender
Civil Works
Item Rate
730 days
Guest House, Railway Road
Please refer tender documents
4 documents required · 4 mandatory
₹3,000
Assistant Comptroller (Estates), SKUAST-Jammu
₹18.3 L
30 Sept 2026
18 Sept 2026
1 Oct 2026
18 Sept 2026
30 Sept 2026
18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 Sq. m on plan), including dressing of sides & remaining of bottoms , lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50 m | |||||
| 1.1 | All kinds of soil. | 1,033.83 | cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth: consolidating each deposited layer by ramming and watering lead up to 50 m and lift upto 1.5 m | 620.3 | Cum | - | - |
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 3.1 | 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 217.05 | cum | - | - |
| 3.2 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 47.78 | cum | - | - |
| 3.3 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 92.48 | cum | - | - |
| 4Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses,string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. | |||||
| 4.1 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.77 | cum | - | - |
| 4.2 | 1:5:10 (1 cement : 5 coarse sand : 10 graded brick aggregate 40 mm nominal size) | 160.88 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
TermsandConditionsoftheContract.pdf
Tender Documents • 0.23 MB
BOQ_1097942.xls
BOQ • 4.39 MB
Scheduleofcredits.pdf
Other Document • 0.01 MB
Corrigendumextension.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .