Tender Value
₹76 L
EMD Value
₹76,000
Closing Date
5 Jun 2020, 3:00 pmClosed
Joint Director/Project Director
DRDA, Pudukkottai
Package No. 4 - SFC-19-20 PONDS AND OORANI IN PUDUKKOTTAI DISTRICT
2020_RDTN_157394_1
Package No. 04 - SFC -2019-2020 in Pdkt Dt
Open Tender
Civil Works
Item Rate
90 days
Pudukkottai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹76,000
23 Jun 2020
8 Feb 2020
5 Jun 2020
8 Feb 2020
5 Jun 2020
8 Feb 2020
Amount
1. Improvements to Vayalangudi Samban Koil Oorani in Embal panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation
Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with stantard specification
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer
Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
2. Improvements to Itchikkotai Mummulichan Oorani in Madhagam Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation
Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with stantard specification
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer
Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
3. Improvements to Lembalakkudi Lanthani Oorani in Lembalakkudi Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation
Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with stantard specification
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer
Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
4. Improvements to Devapatti Pillaiyarkoil Oorani in Kottaiyur Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation
Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with stantard specification
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer
Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
5. Improvements to Pillaiyarkoil Oorani in Velvarai Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation
Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer
Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
6. Improvements to Ponniyamman Koil Oorani @ Poovalur Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectioning during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation
Construction of INLET
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete
Below Sill
Above Sill
Towards the supplying and fixing of 600 mm dia (inner) NP3 RCC Pipes as per standard specificatgions including cost and conveyance pipes etc., complete RCC 600 mm dia pipes 2.50m
Supplying and filling with good river sand including cost and conveyance of sand from approved sources to worksite and stacking the same to departmental metric gauge for taking premeasurement laying layers of not more than 150mm thick watering and tamping with all leads for soft water and including labour charges and all other incidental charges etc., complete as per standard specification for CD works
Bhathing Ghat
Earth work excavation in all classes of soil such as hard stiff clay, hard gravelly soil as per ss 20 B etc., complete
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Centering for sides and soffits including cost and conveyance and all labourcharges etc
Retaining Wall
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth, shales, murram, and earth muds with 505 fair sized boulders as per SS 20B for narrow foundation
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Supplying and Erecting centering for sides & soffiots including necessary supports and Strutting plant surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 ghauge stiffened, welded with steel angle of size 25 x25 x 3
Below Gl
Above Gl
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
7. Improvements to Ponnamangalam Vanakanthan Oorani in Ponnamangalam Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation
Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer
Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
8. Improvements to Pallathividuthi mathavadikulam in Pallathividuthi Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation
Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer
Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
9. Improvements to Seriyalur Inam Ayyanarkulam in Seriyalur Inam Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation
Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with stantard specification
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer
Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KAARTHIKEYAN SUBBAIYA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .