Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹118.0 CrAccepted-AOC | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹131.7 Cr+₹13.7 Cr (11.6%)Rejected-Finance | L2 | Rejected-Finance L2 BIDDER | |
| 3 | L3₹134.7 Cr+₹16.7 Cr (14.1%)Rejected-Finance 139 2 SECOND FLOOR KODAMBAKKAM HIGH ROAD NUNGAMBAKKAM CHENNAI 600 034 | L3 | Rejected-Finance L3 BIDDER | |
| 4 | L4₹159.5 Cr+₹41.5 Cr (35.2%)Rejected-Finance 175 2 SOUTH STATE BANK NAGAR CHETTIPALAYAM ERODE 638 002 | ERODE | ERODE | TAMIL NADU | 638002 | L4 | Rejected-Finance L4 BIDDER | |
| 5 | L5₹207.6 Cr+₹89.6 Cr (76.0%)Rejected-Finance NOT SPECIFIED | L5 | Rejected-Finance L5 BIDDER |
Tender Value
₹139.9 Cr
Closing Date
14 Jun 2021, 6:00 pmClosed
Executive Director (Engg.)-SR
O/o Executive Director (Engg.)-SR, CHQ,AAI, New Delhi
Modification of Storm Water Drains in Operational Area at Chennai Airport
2021_AAI_71186_1
AAI/ENGG/ED-SR/CHENNAI/DRAIN
Open Tender
Civil Works
EPC Contract
548 days
Chennai Airport
As per NIT
14 documents required · 14 mandatory
₹11,800
Exempted
10 Nov 2021
26 Feb 2021
16 Jun 2021
26 Feb 2021
14 Jun 2021
19 Apr 2021
26 Feb 2021 - 29 Mar 2021
Amount
"Improvement of Drainage System - Resizing of Existing Drainage System" complete in all respect on the basis of approved drawings & design as per tender specifications. The work also includes obtaining mandatory approvals from local bodies/ authorities required for commencing the work, execution of required contingent works for completion of scope of work , obtaining post construction mandatory approvals from regulatory authorities and handing over the assets after making them operational in all respects.
"Replacement of compound wall in operational area at Chennai Airport, Chennai" complete in all respect on the basis of approved drawings & design and as per tender specifications. The work also includes obtaining mandatory approvals from local bodies/ authorities required for commencing the work, execution of required contingent works for completion of scope of work , obtaining post construction mandatory approvals from regulatory authorities and handing over the assets after making them operational in all respects.
"Supply and Installation of Flood Barriers in Terminal Building, Operational area and around cirtical Installation and other buildings at Chennai Airport" complete in all respect on the basis of concept drawings and tender specifications. The work also includes obtaining mandatory approvals from local bodies/ authorities required for commencing the work, execution of required contingent works for completion of scope of work , obtaining post construction mandatory approvals from regulatory authorities and handing over the assets after making them operational in all respects.
"Supply and Installation of Sluice gate in all drain outlet to Adyar river, Digital water level recorder(Radar type) includig all Miscellenous works contingent for operationalization of the works" complete in all respect on the basis of concept drawings and tender specifications. The work also includes obtaining mandatory approvals from local bodies/ authorities required for commencing the work, execution of required contingent works for completion of scope of work , obtaining post construction mandatory approvals from regulatory authorities and handing over the assets after making them operational in all respects.
Demolishing existing Boundary wall, Drains or any other structure falling in the allignment of proposed work including foundation by manually/ mechanical means on as and where basis and taking away of dismantled/demolished material beyond AAI premises including disposal of un-servicable material and clearing of site as per direction of Engineer - in - charge. Note: The above structures shall be handed over by EIC in phases for demolition and subsequent disposal . The salvage material shall become the property of agency and item to be quoted & executed as a credit item. (Quoted rate shall be reflected in negative(credit) automatically in Amount column)
SCC Infrastructure Pvt. Ltd
Renaatus Projects Pvt Ltd
RAMALINGAM CONSTRUCTION COMPANYPVT LTD
Marymatha Infrastructure Private Limited
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_76964.xls
BOQ Document • 0.25 MB
73915001.pdf
Tender Document • 0.19 MB
VolumeI.pdf
Tender Document • 10.66 MB
VolumeII.pdf
Tender Document • 25.98 MB
VolumeIIDrawings.pdf
Tender Document • 9.19 MB
73915018.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .