Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.0 LAdmitted-Finance | ₹42.0 L | L1 | Admitted-Finance |
| 2 | L1₹42.0 LAdmitted-Finance | ₹42.0 L | L1 | Admitted-Finance |
| 3 | L1₹42.0 LAdmitted-Finance | ₹42.0 L | L1 | Admitted-Finance |
| 4 | L1₹42.0 LAdmitted-Finance | ₹42.0 L | L1 | Admitted-Finance |
| 5 | L1₹42.0 LAdmitted-Finance | ₹42.0 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRI HITESH KALITA L1 | M/S K.B. ENGINEERS L1 | MS D.M. ENTERPRISE L1 | MS MODERN FABRICATORS L1 | PRAKASH ENTERPRISES L1 | M/S M R ENTERPRISE L1 | M/S R.M. ENTERPRISE L1 | M/S PADMA STORE L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Charges for operation of 6 Nos. of MF 60-65 (4x 400 HP& 2x368HP) pumps both Mechanical & Electrical operations during the monsoon period with roaster duty of specialized workers for 24 hours a day complete . ( for five months from 1st June to 30th October ,2026 ) | 30 | Job | 22,000 ₹6.6 L | 22,000 ₹6.6 L | 22,000 ₹6.6 L | 22,000 ₹6.6 L | 22,000 ₹6.6 L | 22,000 ₹6.6 L | 22,000 ₹6.6 L | 22,000 ₹6.6 L |
| 2.00 | Charges for operation of 4 Nos of MF 50-55 (2x 250HP & 2x150 HP) pumps both Mechanical & Electrical operations during the monsoon period with roaster duty of specialized workers for 24 hours a day complete . ( for five months from 1st June to 30th October, 2026) | 20 | Job | 19,000 ₹3.8 L | 19,000 ₹3.8 L | 19,000 ₹3.8 L | 19,000 ₹3.8 L | 19,000 ₹3.8 L | 19,000 ₹3.8 L | 19,000 ₹3.8 L | 19,000 ₹3.8 L |
| 3.00 | Charges for clearance of garbage suspended foreign materials (any other obstruction which clogs suction) from the suction area including suction pipe of MF dewatering Pumps for uninterrupted suction by the pumps during the period of operations . | 50 | Job | 8,000 ₹4 L | 8,000 ₹4 L | 8,000 ₹4 L | 8,000 ₹4 L | 8,000 ₹4 L | 8,000 ₹4 L | 8,000 ₹4 L | 8,000 ₹4 L |
| 4.00 | Running maintenance charge of Electrical Panel board connected to 300 KW motor for 400HP MF pump including replacement of parts (to be supplied by Deptt.) those may required for maintenance including dismantling & refitting of components and supply of all perishable items complete
(a) Star Delta Panel Board | 4 | Job | 23,000 ₹92,000 | 23,000 ₹92,000 | 23,000 ₹92,000 | 23,000 ₹92,000 | 23,000 ₹92,000 | 23,000 ₹92,000 | 23,000 ₹92,000 | 23,000 ₹92,000 |
| 5.00 | Running maintenance charge of Electrical Panel board connected to 300 KW motor for 400HP MF pump including replacement of parts (to be supplied by Deptt.) those may required for maintenance including dismantling & refitting of components and supply of all perishable items complete
(b) Main Panel Board | 4 | Job | 20,500 ₹82,000 | 20,500 ₹82,000 | 20,500 ₹82,000 | 20,500 ₹82,000 | 20,500 ₹82,000 | 20,500 ₹82,000 | 20,500 ₹82,000 | 20,500 ₹82,000 |
| 6.00 | Running maintenance charge of Electrical Main Panel board connected to 200 KW & 100KW motor including replacement of parts (to be supplied by Deptt.) those may be required for maintenance including dismantling & refitting of components and supply of all perishable items complete. | 1 | Job | 20,000 ₹20,000 | 20,000 ₹20,000 | 20,000 ₹20,000 | 20,000 ₹20,000 | 20,000 ₹20,000 | 20,000 ₹20,000 | 20,000 ₹20,000 | 20,000 ₹20,000 |
| 7.00 | Running maintenance charge of main Electrical Panel board connected to 275 KW motors of two Nos. of 367 HP MF60-65 Pumps and equipped with vacuum pump, butterfly valve, capacitor, temperature gauge etc. control system for pumps including replacement of parts (to be supplied by Department) those may required for maintenance including dismantling & refitting of components and supply of all perishable items complete. | 1 | Job | 35,000 ₹35,000 | 35,000 ₹35,000 | 35,000 ₹35,000 | 35,000 ₹35,000 | 35,000 ₹35,000 | 35,000 ₹35,000 | 35,000 ₹35,000 | 35,000 ₹35,000 |
| 8.00 | Running maintenance charge of MF pumps with replacement of parts (to be supplied by department) those may required for maintenance including dismantling & refitting of components and supply of all perishable items complete for MF 60 -65 Pumps (400/368 HP ) | 6 | Job | 35,000 ₹2.1 L | 35,000 ₹2.1 L | 35,000 ₹2.1 L | 35,000 ₹2.1 L | 35,000 ₹2.1 L | 35,000 ₹2.1 L | 35,000 ₹2.1 L | 35,000 ₹2.1 L |
| 9.00 | Running maintenance charge of MF pumps with replacement of parts (to be supplied by department) those may required for maintenance including dismantling & refitting of components and supply of all perishable items complete for MF 50 -55 Pumps ( 250/150 HP ) | 4 | Job | 25,000 ₹1 L | 25,000 ₹1 L | 25,000 ₹1 L | 25,000 ₹1 L | 25,000 ₹1 L | 25,000 ₹1 L | 25,000 ₹1 L | 25,000 ₹1 L |
| 10.00 | Charges for dismantling, checking, repairing & running maintenance of 10HP vacuum pump with electric motor, coupling and priming line etc. including replacement of parts those may be required for maintenance & refitting of components of all perishable items complete (Spares to be supplied by Deptt.) | 4 | Job | 10,500 ₹42,000 | 10,500 ₹42,000 | 10,500 ₹42,000 | 10,500 ₹42,000 | 10,500 ₹42,000 | 10,500 ₹42,000 | 10,500 ₹42,000 | 10,500 ₹42,000 |
Tender Value
₹42.0 L
EMD Value
₹83,996
Closing Date
13 Mar 2026, 2:00 pmClosed
Addl Chief Engineer, Mech Zone WRD, Assam
O/o the Addl Chief Engineer, Mech Zone WRD, Assam, Basistha Ghy 29
Operation and maintenance of heavy-duty electrically driven mixed flow dewatering pumps at Bharalumukh Pumping Station, including renovation by replacement of electrical components of the control panel board and allied electrical accessories for the
2026_DoWR_51660_1
ACE (Mech) WR/G-17/ 2025/465
Open Tender
Civil Works
180 days
BHARALUMUKH
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
₹83,996
Yes
29 May 2026
4 Mar 2026
13 Mar 2026
4 Mar 2026
13 Mar 2026
5 Mar 2026
Charges for operation of 6 Nos. of MF 60-65 (4x 400 HP& 2x368HP) pumps both Mechanical & Electrical operations during the monsoon period with roaster duty of specialized workers for 24 hours a day complete . ( for five months from 1st June to 30th October ,2026 )
Charges for operation of 4 Nos of MF 50-55 (2x 250HP & 2x150 HP) pumps both Mechanical & Electrical operations during the monsoon period with roaster duty of specialized workers for 24 hours a day complete . ( for five months from 1st June to 30th October, 2026)
Charges for clearance of garbage suspended foreign materials (any other obstruction which clogs suction) from the suction area including suction pipe of MF dewatering Pumps for uninterrupted suction by the pumps during the period of operations .
Running maintenance charge of Electrical Panel board connected to 300 KW motor for 400HP MF pump including replacement of parts (to be supplied by Deptt.) those may required for maintenance including dismantling & refitting of components and supply of all perishable items complete (a) Star Delta Panel Board
Running maintenance charge of Electrical Panel board connected to 300 KW motor for 400HP MF pump including replacement of parts (to be supplied by Deptt.) those may required for maintenance including dismantling & refitting of components and supply of all perishable items complete (b) Main Panel Board
Running maintenance charge of Electrical Main Panel board connected to 200 KW & 100KW motor including replacement of parts (to be supplied by Deptt.) those may be required for maintenance including dismantling & refitting of components and supply of all perishable items complete.
Running maintenance charge of main Electrical Panel board connected to 275 KW motors of two Nos. of 367 HP MF60-65 Pumps and equipped with vacuum pump, butterfly valve, capacitor, temperature gauge etc. control system for pumps including replacement of parts (to be supplied by Department) those may required for maintenance including dismantling & refitting of components and supply of all perishable items complete.
Running maintenance charge of MF pumps with replacement of parts (to be supplied by department) those may required for maintenance including dismantling & refitting of components and supply of all perishable items complete for MF 60 -65 Pumps (400/368 HP )
Running maintenance charge of MF pumps with replacement of parts (to be supplied by department) those may required for maintenance including dismantling & refitting of components and supply of all perishable items complete for MF 50 -55 Pumps ( 250/150 HP )
Charges for dismantling, checking, repairing & running maintenance of 10HP vacuum pump with electric motor, coupling and priming line etc. including replacement of parts those may be required for maintenance & refitting of components of all perishable items complete (Spares to be supplied by Deptt.)
Checking & testing of 750 KVA/500KVA ,11/0.433 KV,3 –phase,50 Hz , Outdoor type, HV & LV for 4 star, BIS Level -2 Opening of transformer new gasket sets, transformer cover , conservator tank , explosion vent pipe, L. T & H.T terminals etc. (ii)Fitting of H.V. stud. & . Bushing (copper wound) , Ratio Switch, including making of primary & secondary core-coil assembly with all connections after servicing etc., Cleaning and painting works of transformer, tank surfaces both outside and inside complete as directed. Testing, closing of Transformer including changing of gasket sets etc. & filling up specified Transformer Oil to permissible level for maximum operational efficiency.
Providing corrugated G. S sheet roofing including vertical /curved surface fixed with polymer coated J or L hooks , bolts & nuts 8mm diameter with bitumen and GI limpet washers or with GI limpet washers filled with white lead , including a coat of approved steel primer and two coats of approved paints on overlapping of sheets complete (upto any pitch in horizontal / vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.63mm thick with zinc coating not less than 275gm/sqm Qty : 40m x 7 m = 280.00 sqm
Providing ridges or hips of width 60 cm overall width plain G.S sheet fixed with polymer coated J or L hooks , bolts and nuts 8mm dia GI limpet and bitumen washers complete . 0.63mm thick with zinc coating not less than 275gm/sqm
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Brick work 7 cm thick with common burnt clay F.P.S. (non modular) brick of class designation 7.5 in cement mortar 1:3 (1 cement : 3 coarse sand) in superstructure above plinth level and upto floor five level.
15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : (a) On rough side 1:3 (1 cement: 3 fine sand)
Fabrication & fitting of netting made of MS Rod 12mm & MS Angle 40 x 40 x 3 mm including cost of welder/labour charges etc. for protecting the suction strainer to trap garbage at the suction end of pipes complete as directed.
MCCB Shunt Trip Relay
Control Relay Contactor, CA 2DN1229M, Coil Volt-220V,50 Hz
Time Delay Block, TA2DS2
Add on Block TA1DN22
Supply and fixing in position of 1000A TP ACB EDO Cu. Tape/wires including providing all fixing accessories and effecting proper connections. 1000A TP ACB Breaker
MNX 32A 3 Pole Power Contactor
11 KVA Barrel
11 KVA barrel Fuse
Aluminium Bus bar 50x6 mm
XPLE insulted and PVC sheeted armoured electric power cable with aluminium conductor for voltage grade of 1100V conforming to IS :7098 (P-I) i) Size 300 mm Sqm x 3.5 C
Aluminium Lug ( assorted size ) for electric power cable
Asbestos Gland Packing Size : 1’’
Asbestos Gland Packing Size: 11/2’’
HRC Fuse Reputed make800 Amp
HRC Fuse Reputed make 630 Amp
HRC Fuse Reputed make 400 Amp
Transformer Oil
11 KV pin insulator with GI pin
RC Fuse 2 Amp
Control Fuse 20 Amp with 2 Amp Fuse
11KV Do Fuse ,150 Amp for 11 KV Sub Station
Nylon Rope
Grease
Mobil oil for filling up bushing housing for 10( ten ) nos. of MF Pumps.
Ordinary labours to be engaged in various assisting work, opening and closing of sluice gate, filling of vacuum pump priming tank, opening and clearing of suction , permanent watch keeping duty & other various miscellaneous works during the operation of 10 (ten) nos. of MF pumps.( May'26 to October'26 )
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
bharalumukh_bid.pdf
Tender Documents • 0.64 MB
BOQ_81962.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid