Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹434.5 CrAccepted-AOC | ₹434.5 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹434.5 CrRejected-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹434.5 Cr | L2 | Rejected-Finance As per Financial Evaluation |
| 3 | L3₹506.7 CrRejected-Finance 1 ITI BHAWAN OLD MADRAS ROAD DOORVANI NAGAR BENGALURU KARNATAKA 560016 | BENGALURU URBAN | KARNATAKA | 560016 | ₹506.7 Cr | L3 | Rejected-Finance As per Financial Evaluation |
| 4 | L4₹598.8 CrRejected-Finance 8 COMMERCIAL COMPLEX MASJID MOTH GREATER KAILASH II NEW DELHI DELHI 110048 | SOUTH DELHI | DELHI | 110048 | ₹598.8 Cr | L4 | Rejected-Finance As per Financial Evaluation |
| 5 | Rejected-Technical 1ST FLOOR POLYCAB HOUSE 771 PANDIT SATWALEKAR MARG MAHIM WEST MUMBAI MAHARASHTRA 400016 | MUMBAI | MAHARASHTRA | 400016 | - | - | Rejected-Technical Not Technically Qualified |
Tender Value
Refer Docs
EMD Value
₹9 Cr
Closing Date
11 Nov 2020, 3:00 pmClosed
Managing Director
807, 5th floor P.T.Lee.Chengalvaraya Naicker Building, Anna Salai, Chennai- 600002
Implementation of BharatNet Phase II Project in Tamil Nadu
2020_IT_181994_1
NIT_TANFINET_002_PACKAGE_B
Open Tender
Network /Communication Equipments
1460 days
As per Tender Document
As per Tender Document
5 documents required · 5 mandatory
₹0
₹9 Cr
Yes
As per Tender Document
17 Jun 2022
3 Oct 2020
12 Nov 2020
3 Oct 2020
11 Nov 2020
29 Oct 2020
3 Oct 2020 - 10 Oct 2020
16 Oct 2020
Amount
State NOC
Element Management System for UPS
Element Management System for GPON
Element Management System for IP-MPLS Routers
Passive infrastructure
Aerial Optical Fibre Cable ADSS OFC 48 Core
Aerial Optical Fibre Cable ADSS OFC 24 Core
Aerial Optical Fibre Cable ADSS OFC 12 Core
Underground Optical Fibre Cable 96 Core Ribbon Type
HDPE PLB Duct (40 mm/33mm) with All Accessories like Coupler, End Cap, Simplex Plug etc
DWC Pipe (75/61mm) @ 50m per km
Supply of FDMS outdoor (Joint Closure)
GI Pipe 50mm - Class-B Medium as per ISI Mark @60m per km
Supply of Route / joint indicator (5 per Km)
Supply of Manhole, Joint chambers & Loop chamber
FDMS 12F
FDMS 24F
FDMS 48F
FDMS 96F
Formed OFC Dead End & Termination Fittings @ 5 per km (Wedge Type)- Dead End Termination / Tensioning clamp assembly for the poles having cable angle deviation above 25 deg or at tension point/poles. (2 No-Anchoring clamp, 1 No-Pole Bracket, 1.5 Mtrs-Stainless Steel Strap, 2 Nos-Buckles) @ 3 per km --- (Wedge Type - Type 3)
OFC Suspension Fittings @ 15 per km (Wedge Type)
Adjustable Cable Storage Bracket @3per km( One loop bracket 1.5 mtr stainsteel strap & 2 nos buckles) Wedge Type - Type 3
Supply & Erection of PSC pole as mentioned in Technical Specifications
Straight Joint Closure / Branch Joint Closure @ one per 2 km+10% extra
Fibre Patch cord (1M)
Fibre Patch cord (3M)
Fibre Patch cord (5M)
Fibre Patch cord (10M)
Rack 32U Floor mount with all accessories for Blocks
Rack 9U wall mount with all accessories for GPs & Revenue Villages
1:4 optical splitter
1:8 optical splitter
Active infrastructure
Aggregation Routers at Blocks (400 GB)
Access Routers at GPs
4 port GPON OLT at GP
8 port GPON OLT at GP
ONT at Revenue Village
1G Optical SFP Module 300 mtrs
1G Optical SFP Module 10km
1G Optical SFP Module 40km
10G Optical SFP Module 300 mtrs
10G Optical SFP Module 10km
10G Optical SFP Module 40km
40G Optical SFP Module 10km
40G Optical SFP Module 40km
100G Optical SFP Module 10km
100G Optical SFP Module 40km
Radio Infrastructure
Supply, installation, testing and commissionig of RF equipment (Outdoor and Indoor) at Block including all accessories i.e. Mast, cabling, earthing, etc.
Supply, installation, testing and commissionig of RF equipment (Outdoor and Indoor) at GP including all accessories i.e. Mast, cabling, earthing, etc.
Power infrastructure
Online UPS (6 KVA)
Online UPS (1 KVA)
Site Preparation Cost
One Time Site Preparation cost for all Civil & Electrical Works including proper earthing at Block
One Time Site Preparation cost for all Civil & Electrical Works including proper earthing at GP
One Time Site Preparation cost for all Civil & Electrical Works including proper earthing at Revenue Villages
Services (As per technical specifications given in Annexure-XX TEC GR No.) and Engineering Instruction
Passive infrastructure
Excavation of trench, PLB pipe laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe, Pulling/laying / blowing of optical Fibre Cable inside laid PLB pipe, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe, wherever required. Commissioning of 96 core optical fibre connectivity from the Block PoP to GP and termination at GP. The cost shall include fixing of joint chamber, manhole, splice closure, Fixing, painting and sign writing of Route /Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre per GP (For Underground laying) (As per the Engineering Instruction issued by BBNL)
Slinging / Laying of ADSS 24 core of optical Fibre Cable on EB Poles or new Poles whereever required, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. Commissioning of 24 core optical fibre connectivity from the Block PoP to GP and termination at GP. The cost shall include fixing of installation accessories, splice closure, Fixing, painting and sign writing of Route /Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre per GP (For Overhead laying) (As per the Engineering Instruction issued by BBNL).
Slinging / Laying of ADSS 48 core of optical Fibre Cable on EB Poles or new Poles whereever required, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. Commissioning of 48 core optical fibre connectivity from the Block PoP to GP and termination at GP. The cost shall include fixing of installation accessories, splice closure, Fixing, painting and sign writing of Route /Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre per GP (For Overhead laying) (As per the Engineering Instruction issued by BBNL).
Slinging / Laying of ADSS 12 core of optical Fibre Cable on EB Poles or new Poles whereever required, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. Commissioning of 12 core optical fibre connectivity from the Revenue Village to nearest GP and termination at Revenue Village. The cost shall include fixing of installation accessories, splice closure, Fixing, painting and sign writing of Route /Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre per Revenue Village (For Overhead laying) (As per the Engineering Instruction issued by BBNL).
Active infrastructure
Installation, integration, testing and commissioning of Electronics at Block
Installation, integration,testing and commissioning of Electronics at GP Level
Installation, integration,testing and commissioning of Electronics at Revenue Village Level
(Operations & Maintenance (O&M) Cost Shall not be less than 5% per annum of the CAPEX Value)
OPEX Cost per GP per quarter (equated quarterly for 3 years)
OPEX Cost per Block per quarter (equated quarterly for 3 years)
OPEX Cost per Revenue Village per quarter (equated quarterly for 3 years)
Pace Digitek Infra Pvt Ltd
ITI Limited
HFCL LIMITED
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid