Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.2 CrAccepted-AOC | ₹2.2 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹2.2 Cr+₹4.4 L (2.02%)Rejected-Finance 20 PAWAN DHAM PHASE 1 SHAMSHABAD ROAD AGRA DISTRICT AGRA U P | ₹2.2 Cr+₹4.4 L (2.02%) | 2 | Rejected-Finance L2 |
| 3 | 3₹2.2 Cr+₹6.6 L (3.03%)Rejected-Finance | ₹2.2 Cr+₹6.6 L (3.03%) | 3 | Rejected-Finance L3 |
| 4 | 4₹2.3 Cr+₹9.4 L (4.31%)Rejected-Finance MORENA | MORENA | MADHYA PRADESH | 476001 | ₹2.3 Cr+₹9.4 L (4.31%) | 4 | Rejected-Finance L4 |
| 5 | 5₹2.3 Cr+₹15.4 L (7.08%)Rejected-Finance | ₹2.3 Cr+₹15.4 L (7.08%) | 5 | Rejected-Finance L5 |
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
15 May 2023, 5:30 pmClosed
PHED BHIND
EE PHED BHIND
Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village 1 JARI 2 LAHARPURA 3 SARUPURA 4 INGURI 5 BAGULARI Block ATER Distt. BHIND based on Tube.Well including installation of e
2023_PHED_272843_1
NIT No 187/ Procell/EE/ PHED/2023/BHIND
Open Tender
Civil Works - Water Works
Percentage
270 days
ATER
AS PER NIT
8 documents required · 8 mandatory
₹15,000
₹2.5 L
11 Oct 2023
5 May 2023
17 May 2023
5 May 2023
15 May 2023
5 May 2023
eProcurement System Government of Madhya Pradesh Created By: Ramkumar Singh Rajpoot Created Date/Time: 20-Jun-2023 06:07 PM Tender Title: PIPE LINE WORK Tender ID: 2023_PHED_272843_1
Tender Inviting Authority: EE PHED BHIND
Name of Work: Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village – 1 JARI 2 LAHARPURA 3 SARUPURA 4 INGURI 5 BAGULARI Block – ATER Distt. BHIND based on Tube.Well including installation of electric submersible motor pump, construction of R.C.C Sump well cum pump house, construction of R.C.C. Over Head Tenk, laying & jointing of rising main and distribution pipe line system, household tap connections, and electric power connections including cost of material & labour with 90 Days Trial Run After Completion of work And Commissioning of scheme.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 BOHARE CONSTRACTION(GSTN-23AWAPD9780A1ZY) 25445000.00 -11.97 22399233.50 Two Crore Twenty Three Lakh Ninty Nine Thousand Two Hundred and Thirty Three
2.00 M/s Bhagwati Enterprises(GSTN-23AAPFM3354A2ZL) 25445000.00 -10.88 22676584.00 Two Crore Twenty Six Lakh Seventy Six Thousand Five Hundred and Eighty Four
3.00 SANJAY SHARMA CONTRACTOR(GSTN-NA) 25445000.00 -14.56 21740208.00 Two Crore Seventeen Lakh Fourty Thousand Two Hundred and Eight
4.00 N B CONSTRUCTIONS(GSTN-NA) 25445000.00 -8.51 23279630.50 Two Crore Thirty Two Lakh Seventy Nine Thousand Six Hundred and Thirty
5.00 M S INFRATECH(GSTN-NA) 25445000.00 -12.83 22180406.50 Two Crore Twenty One Lakh Eighty Thousand Four Hundred and Six
Lowest Amount Quoted BY: SANJAY SHARMA CONTRACTOR(21740208.00)
BOQ Summary Details Tender Title: PIPE LINE WORK Tender ID: 2023_PHED_272843_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SANJAY SHARMA CONTRACTOR 21740208.00 L1
2 M S INFRATECH 22180406.50 L2
3 BOHARE CONSTRACTION 22399233.50 L3
4 M/s Bhagwati Enterprises 22676584.00 L4
5 N B CONSTRUCTIONS 23279630.50 L5
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .