Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-Finance | L1 | Accepted-Finance LESS | |
| 2 | L2₹4.1 L+₹968 (0.24%)Rejected-Finance | L2 | Rejected-Finance MORE |
| Sl No | Description | Qty | Unit | SHREE MEENAKSHI BUILDERS L1 | MAHA BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils and sub soils to full depth as may be directed by the departmental officers except in hard rock requiring blasting but inclusive of shoring, strutting and balling out water wherever nessasary and depositing the surplus earth within initial lead of 10 metre and initial lift of 2 metre etc., complete as per Standard specifications SS | 44 | m3 | 179.5 ₹7,898 Lowest | 182 ₹8,008 |
| 2.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregater) using 40mm BSS HBG metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 44 | m3 | 5,588 ₹2,45,872 Lowest | 5,591 ₹2,46,004 |
| 3.00 | Cement concrete 1:2:4 (one cement, two sand and four aggregater) using 20mm BSS HBG metal and including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 22 | m3 | 6,935 ₹1,52,570 Lowest | 6,965 ₹1,53,230 |
| 4.00 | Conveyance of the excavated earth work and including all cost etc complete., | 44 | m3 | 66.5 ₹2,926 Lowest | 68 ₹2,992 |
| 5.00Add :- GST @ 18% | |||||
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
10 Jul 2025, 3:00 pmClosed
The Assistant Commissioner, East Zone.
The Assistant Commissioner, East Zone, Coimbatore Corporation, Singanallur, Coimbatore.
Providing CC Flooring at Nethaji street 1,2,3 in ward No. 50, East Zone.
2025_MAWS_578957_13
E5/EASTZONE/2025
Open Tender
Civil Works - Roads
Works
90 days
Assistant Commissioner, East Zone, Coimbatore Corp
As Per tender condition
4 documents required · 4 mandatory
₹0
₹5,000
24 Feb 2026
8 Jul 2025
11 Jul 2025
8 Jul 2025
10 Jul 2025
8 Jul 2025
Amount
Earth work excavation in all soils and sub soils to full depth as may be directed by the departmental officers except in hard rock requiring blasting but inclusive of shoring, strutting and balling out water wherever nessasary and depositing the surplus earth within initial lead of 10 metre and initial lift of 2 metre etc., complete as per Standard specifications SS
Cement concrete 1:4:8 (one cement, four sand and eight aggregater) using 40mm BSS HBG metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS
Cement concrete 1:2:4 (one cement, two sand and four aggregater) using 20mm BSS HBG metal and including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS
Conveyance of the excavated earth work and including all cost etc complete.,
Add :- GST @ 18%
MAHA BUILDERS (BID ID -1397113)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .