| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC B 62 TEZ KUMAR PLAZA TRILOKI NATH ROAD HAZRATGANJ LUCKNOW UTTAR PRADESH 226001 UDYAM UP 50 0055899 | LUCKNOW | UTTAR PRADESH | 226001 | ₹2.9 Cr | L1 | Accepted-AOC L1 |
| 2 | Not Admitted-Fee/PreQual/Technical BUDHAIPURWA SHIVABAKHTAVAR GONDA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Finance VILLAGE GOBINDAPUR POST SONHA DISTRICT BASTI | BASTI | UTTAR PRADESH | - | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | AKANKSHA ASSOCIATES L1 |
|---|---|---|---|---|
| 1.00 | Earth work in Excavation of foundation in ordinary soil With initial lead & lift including refilling of excavated earth in trench dressing and manual compaction required for proper completion of work as per direction of engineer incharge. | 6,091.5 | M³ | 115 ₹7,00,522.5 |
| 2.00 | Laying C.C. M-10(1:3:6) with Cement, Hamirpur coarse sand of F.M. not less than 2.0, Kabrai graded stone ballast 20 to 40 mm size including all cost of materials, labour, T&P etc. required for proper completion of work as per direction of engineer incharge. | 244.4 | M³ | 12,300 ₹30,06,120 |
| 3.00 | Laying C.C. M-15(1:2:4) in Block with Cement, Hamirpur coarse sand of F.M. not less than 2.0, Kabrai Crushed stone grit 4.75 to 20 mm size well graded including all cost of materials, labour, T&P etc. required for proper completion of work as per direction of engineer incharge. | 64.5 | M³ | 12,500 ₹8,06,250 |
| 4.00 | Centering & Shuttering for Block/R.C.C. Works including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge. | 2,435.93 | M² | 1,290 ₹31,42,349.7 |
| 5.00 | Laying R C.C. M-20(1:1.5:3) with Cement, Hamirpur coarse sand of F.M. not less than 2.0, Kabrai crushed stone grit 4.75 to 20 mm size well graded including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge. | 860.79 | M³ | 12,499 ₹1,07,59,014.21 |
| 6.00 | First class brick work in 1:4 C:M with Cement and Hamirpur coarse sand of F.M. not less than 2.0 including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge. | 173.88 | M³ | 7,385 ₹12,84,103.8 |
| 7.00 | Supplying & laying crushed stone grit 10 to 20 mm gauge as a filler material within lead of 200 m including cost of all labour,material,T&P etc. required for proper completion of work as per direction of engineer incharge. | 21.6 | M³ | 7,601 ₹1,64,181.6 |
| 8.00 | Supplying & laying Kabrai Pea gravel as a filler material within lead of 200 m including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge. | 21.6 | M³ | 6,250 ₹1,35,000 |
| 9.00 | Supplying & laying coarse sand F.M. not less than 2.0, Kabrai, as a filler material within lead of 200 m including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge. | 21.6 | M³ | 6,139 ₹1,32,602.4 |
| 10.00 | S/F P.V.C seal with cutting, binding brazing and crimping upto 225 mm wide including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge. | 120 | RM | 832 ₹99,840 |
Tender Value
₹3.0 Cr
EMD Value
₹6.1 L
Closing Date
6 Mar 2026, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Drainage Circle Gonda
Construction of Drainage Syphon at Km. 9.205, km 9.820 and km 30.920 of Utraula Dy.
2026_UPIDC_1118639_1
03/SE/2025-26
Open Tender
Civil Works - Canal
180 days
Balrampur
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
₹6.1 L
28 Mar 2026
21 Feb 2026
6 Mar 2026
21 Feb 2026
6 Mar 2026
21 Feb 2026
Earth work in Excavation of foundation in ordinary soil With initial lead & lift including refilling of excavated earth in trench dressing and manual compaction required for proper completion of work as per direction of engineer incharge.
Laying C.C. M-10(1:3:6) with Cement, Hamirpur coarse sand of F.M. not less than 2.0, Kabrai graded stone ballast 20 to 40 mm size including all cost of materials, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Laying C.C. M-15(1:2:4) in Block with Cement, Hamirpur coarse sand of F.M. not less than 2.0, Kabrai Crushed stone grit 4.75 to 20 mm size well graded including all cost of materials, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Centering & Shuttering for Block/R.C.C. Works including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Laying R C.C. M-20(1:1.5:3) with Cement, Hamirpur coarse sand of F.M. not less than 2.0, Kabrai crushed stone grit 4.75 to 20 mm size well graded including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
First class brick work in 1:4 C:M with Cement and Hamirpur coarse sand of F.M. not less than 2.0 including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Supplying & laying crushed stone grit 10 to 20 mm gauge as a filler material within lead of 200 m including cost of all labour,material,T&P etc. required for proper completion of work as per direction of engineer incharge.
Supplying & laying Kabrai Pea gravel as a filler material within lead of 200 m including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Supplying & laying coarse sand F.M. not less than 2.0, Kabrai, as a filler material within lead of 200 m including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
S/F P.V.C seal with cutting, binding brazing and crimping upto 225 mm wide including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
S/F Copper seal with cutting, binding brazing and crimping upto 225 gauge and 285 mm wide including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
S/F of Joint fillar board including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Supplying & Laying stone boulder 20 to 40 kg. of Mirzapur Stone Boulder Ahraura quarry including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Deep struck Cement pointing in 1:2 C:M with coarse sand FM not less than 2.0, including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Supplying and laying one layer of tarfelt or any other equivalent approved material at the junction of wall and roof or at any palace as per direction of Engineer in charge including necessary overlap giving a coat of approved plastic paint below the tarfelt and including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Cutting, bending, binding and placing of steel reinforcement including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Brick work in linning 160 mm thik (Double Layer) with 1:3 C.M. with 8 mm thick sand plaster including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Supplying and filling Local sand From Dhoba Nallah for construction of bed floor and approach slab with cost of sand including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Earth work in making cross bund including all lead and lifts and its proper compaction in all types of soil including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Supplying & Fixing informatory Sign Board including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Earth work in making canal section including all lead and lifts and its proper compaction in all types of soil etc. including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Earth work in removing of x-bund and disposal of it as per direction of Engineer incharge, including all lead & lift, labour, T & P etc. complete work with manual compaction and dressing to profile. including all cost of material, labour, T&P etc. required for proper completion of work as per direction of engineer incharge.
Boring with 15 cm casing pipe i/c lowering of assemly & extracting of casing pipe with 100 mm dia PVC pipe i/c cost of all, material labour T&P equipment etc required for Completion of work.
Dewatering with all cost of power & P.O.L machine,pump,well point systm and operator etc with assembling and dismentling of machine etc. required for proper completion of work.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.24 MB
Biddoc03SE202526.pdf
Tender Documents • 5.77 MB
BOQ_2079368.xls
BOQ • 0.27 MB