| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAccepted-AOC 64 SHANKAR MARRIAGE HOME WEST ARJUN NAGAR AGRA | AGRA | AGRA | UTTAR PRADESH | ₹5.9 Cr | L1 | Accepted-AOC Preparation Bond for Rs. 59371479.88 Only |
| 2 | L2₹6.6 Cr+₹68.6 L (11.5%)Rejected-Finance | ₹6.6 Cr+₹68.6 L (11.5%) | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹7.4 Cr+₹1.5 Cr (24.5%)Rejected-Finance E 13 NIRBHAY NAGAR GALLANA ROAD AGRA | AGRA | ₹7.4 Cr+₹1.5 Cr (24.5%) | L3 | Rejected-Finance Rejected due to higher Rates |
| 4 | L4₹9.1 Cr+₹3.2 Cr (53.2%)Rejected-Finance 111 NEW COLONY CHOUGURJI ETAWAH | ETAWAH | UTTAR PRADESH | 206001 | ₹9.1 Cr+₹3.2 Cr (53.2%) | L4 | Rejected-Finance Rejected due to higher Rates |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technical Bid Non responsive |
| Sl No | Description | Qty | Unit | M/S A V CONSTRUCTION L1 | SAMRIDDHI NIRMAN PVT. LTD. L3 | M/S ASHOK KUMAR PARASHAR L4 | SHREE RAM STONE SUPPLIERS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. | 4,460 | Cum | 10 ₹44,600 Lowest | 50 ₹2,23,000 | 50 ₹2,23,000 | 25 ₹1,11,500 |
| 2.00 | Construction of embankment with approved material deposite site from roadway cutting and excavation from drain & foundation of other structures grade and compected to meet requirement of table 300-2 | 4,460 | Cum | 25 ₹1,11,500 Lowest | 50 ₹2,23,000 | 50 ₹2,23,000 | 25 ₹1,11,500 Lowest |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 21,340 | Cum | 25 ₹5,33,500 Lowest | 80 ₹17,07,200 | 50 ₹10,67,000 | 25 ₹5,33,500 Lowest |
| 4.00 | Construction of Granular Sub-Base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clauses 401.As per MoRT&H clause 401(b) | 3,375 | Cum | 1,725 ₹58,21,875 Lowest | 2,800 ₹94,50,000 | 3,700 ₹1,24,87,500 | 2,200 ₹74,25,000 |
| 5.00 | Scarifying existing bituminous surface to a depth and disposal of scarified material within all lift and leads upto 1000 m as per Technical Specification Clause 305.4.3 | 6,800 | Sqm | 2 ₹13,600 Lowest | 2 ₹13,600 Lowest | 5 ₹34,000 | 2 ₹13,600 Lowest |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carries of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of all materials, T&P, labour, cartage for proper completion of work as per direction of Engineer-in-Charges. | 7,200 | Cum | 1,825 ₹1,31,40,000 Lowest | 3,000 ₹2,16,00,000 | 4,000 ₹2,88,00,000 | 2,400 ₹1,72,80,000 |
| 7.00 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 37,400 | Sqm | 5.99 ₹2,24,026 Lowest | 20 ₹7,48,000 | 40 ₹14,96,000 | 17 ₹6,35,800 |
| 8.00 | Providing and laying Dense Graded Bituminous Macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.5% by weight of total mix and fille, transporting the hot mix to work site laying with a hydrostatic paver finisher to the required grade, level and alingment, rolling with smooth wheeled bibratory and tendom rollers to achiev the desired compection as per MORTH specifiaction clause 507 complete all respects. Grading-II | 2,240 | Cum | 8,070 ₹1,80,76,800 | 8,000 ₹1,79,20,000 | 10,500 ₹2,35,20,000 | 7,500 ₹1,68,00,000 Lowest |
| 9.00 | Providing and applying tack coat with bitumen VG-10 @ 0.20kg. Per sqm on granular surface treated with primer & cleaned with mechanical broom including cost of bitumen, T&P and labour & all taxes complete For BC | 37,400 | Sqm | 3.9 ₹1,45,860 Lowest | 6 ₹2,24,400 | 12 ₹4,48,800 | 7 ₹2,61,800 |
| 10.00 | Providing and laying Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4 % of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher to the required grade, level and alingment, rolling with smooth wheeled bibratory and tendom rollers to achiev the desired compection as per MORTH specifiaction clause 509 complete all respects. Grading-II | 1,120 | Cum | 8,450 ₹94,64,000 Lowest | 9,400 ₹1,05,28,000 | 12,300 ₹1,37,76,000 | 9,300 ₹1,04,16,000 |
Tender Value
₹9.7 Cr
EMD Value
₹19.5 L
Closing Date
18 Dec 2025, 12:00 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Widening and strengthening work of ABK to Saukuri Kalan Tarauli Gujar Road
2025_CEAGR_1098426_1
4831/14M-AC/2025 dated 06-10-2025
Open Tender
Civil Works
Item Wise
365 days
Agra
Widening and strengthening work
2 documents required · 2 mandatory
₹2,354
₹19.5 L
Yes
Agra
10 Feb 2026
11 Dec 2025
18 Dec 2025
11 Dec 2025
18 Dec 2025
11 Dec 2025
12 Dec 2025
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m.
Construction of embankment with approved material deposite site from roadway cutting and excavation from drain & foundation of other structures grade and compected to meet requirement of table 300-2
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.
Construction of Granular Sub-Base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clauses 401.As per MoRT&H clause 401(b)
Scarifying existing bituminous surface to a depth and disposal of scarified material within all lift and leads upto 1000 m as per Technical Specification Clause 305.4.3
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carries of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of all materials, T&P, labour, cartage for proper completion of work as per direction of Engineer-in-Charges.
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
Providing and laying Dense Graded Bituminous Macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.5% by weight of total mix and fille, transporting the hot mix to work site laying with a hydrostatic paver finisher to the required grade, level and alingment, rolling with smooth wheeled bibratory and tendom rollers to achiev the desired compection as per MORTH specifiaction clause 507 complete all respects. Grading-II
Providing and applying tack coat with bitumen VG-10 @ 0.20kg. Per sqm on granular surface treated with primer & cleaned with mechanical broom including cost of bitumen, T&P and labour & all taxes complete For BC
Providing and laying Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4 % of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher to the required grade, level and alingment, rolling with smooth wheeled bibratory and tendom rollers to achiev the desired compection as per MORTH specifiaction clause 509 complete all respects. Grading-II
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam (22.4-53) specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.
Construction of un-reinforced, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, pread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Construction of sub-grade and earthen shoulders with approved material obtained from ROW with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches.
Supply & Laying of 350mm dia NP-3 HP and their cartage etc including cost of all materials from approved quarry, T&P, labour, cess, cartage for proper completion of work as per direction of Engineer-in-Charges and as per approved drawing.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.s including cost of all materials from approved quarry, T&P, labour, cess, cartage for proper completion of work as per direction of Engineer-in-Charges and as per approved drawing.
Class 150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P required for proper completion of work including cost of all materials from approved quarry, T&P, labour, cess, cartage for proper completion of work as per direction of Engineer-in-Charges and approved drawings.
Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 coarse sand) :Raised and cut pointing Ch- 13 Si No- 1. including cost of all materials from approved quarry, T&P, labour, cess, cartage for proper completion of work as per direction of Engineer-in-Charges and as per approved drawing.
Plain Cement Concrete (PCC Grade M15 ) in Open Foundation complete as per Drawing and Technical Specifications. Clause 1500, 1700 & 2100 including cost of all materials from approved quarry, T&P, labour, cess, cartage for proper completion of work as per direction of Engineer-in-Charges
Reinforced Cement Concrete (M-20) in sub-structure complete as per Drawing and Technical Specifications Clause 1500, 1600 & 1700 including cost of all materials from approved quarry, T&P, labour, cess, cartage for proper completion of work as per direction of Engineer-in-Charges and as per approved drawing.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete and technical specifications including cost of all materials from approved quarry, T&P, labour, cess, cartage for proper completion of work as per direction of Engineer-in-Charges and as per approved drawing.
Plain Cement Concrete (PCC Grade M20) in Open Foundation complete as per Drawing and Technical Specifications. Clause 1500, 1700 & 2100
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.(RCC Grade M25 in foundation)
Reinforced Cement Concrete (M-25) in super-structure complete as per Drawing and Technical Specifications Clause 1500, 1600 & 1700
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical Specifications
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.
Drainage spouts as per drawing & Technical Specification, as per MORT&H specification 2705
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Providing and laying Flooring complete as per drawing and Technical specifications laid over cement concert bedding.
Part-B Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. including royalty on materials. GST shall be paid extra as applicable at the time of payment.
Part-B Maintainance of First Year (@ 0.00% of Total Work Amount of 1 to 30)
Part-B Maintainance of Second Year (@0.25% of Total Work Amount of 1 to 30)
Part-B Maintainance of Third Year (@0.50% of Total Work Amount of 1 to 30)
Part-B Maintainance of Fourth Year (@0.75% of Total Work Amount of 1 to 30)
Part-B Maintainance of Fifth Year (@1% of Total Work Amount of 1 to 30)
Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable 2- Labour cess @ 1% will be deducted from contractor's bill at the time of payment 3- Maintenance will be calculated on value of actual work done.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
SBD_Sakuri.pdf
Tender Documents • 2.16 MB
BOQ_2023240.xls
BOQ • 0.31 MB
SBDAddendum_Saukuri.pdf
Tender Documents • 2.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .