| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹53.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹56.2 L+₹2.8 L (5.28%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹56.6 L+₹3.1 L (5.87%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹62.8 L
EMD Value
₹4.7 L
Closing Date
16 May 2026, 4:00 pmClosed
CHIEF ENGINEER
VARANASI NAGAR NIGAM
WARD S. 24 RAMDATPUR ANTERGAT HASANPUR ME RAING ROAD STHIT RAJA RAM AWAS SE VIJAY PATEL NANDLAL PATEL RAVIDRA PAL BRAMHDEV PATEL CHEDI PAL AWAS HOTE HUYE SUNDAR PAL AWAS TAK CC SARAK KA NIRMAN KARY
2026_NNVAR_1136653_69
01_cmnsy_VRS
Open Tender
Civil Works
Percentage
90 days
VARANASI NAGAR NIGAM
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹6,284
TENDER COST, Account no- 50100642535388
₹4.7 L
17 Jul 2026
11 May 2026
16 May 2026
11 May 2026
16 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1वार्ड स० 24 रमदत्तपुर अंतर्गत हसनपुर में रिंग रोड स्थित राजा राम आवास से विजय पटेल] नन्दलाल पटेल] रविन्द्र पाल] ब्रह्मदेव पटेल] छेदी पाल आवास होते हुए सुन्दर पाल आवास तक सी0 सी0 सड़क निर्माण कार्य | |||||
| 1.01 | Dismantling of exist B.O.E. Soling including all complete. SOR PWD S.N. 5 Ref No 2.6 ( b | 1,418.62 | M2 | 19 | ₹26,953.78 |
| 1.02 | E/W in cutting cartage & filling from outside 8.00 km including all cost complete(Analysed) | 709.3 | M3 | 310.1 | ₹2,19,953.93 |
| 1.03 | Providing and laying Cement concrete 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone ballast 40 mm. nominal size) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors.S.I.No-281. | 202.66 | M3 | 5,550 | ₹11,24,763 |
| 1.04 | S/L of 125 micron polythene sheet under the foundation or sub base to act as seperation between sub base and concrete slab (for cc road slab) etc | 2,026.6 | M2 | 45 | ₹91,197 |
| 1.05 | Laying of CC Road slab consisting of 1:1.5:3 cement coarse sand and approved 20 mm gauge stone ballast over prepared sub grade after its rectification & bringing etc as per sor si no 773B | 303.99 | M3 | 7,350 | ₹22,34,326.5 |
| 1.06 | Providing and laying Cement concrete 1:6:12( 1 cement : 6 fine sand : 12 graded brick ballast 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. SOR SI No. 273 | 11.8 | M3 | 4,060 | ₹47,908 |
| 1.07 | First class bricks work in 1:4 in cement and coarse sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. SOR SI No. 305(b) | 47.79 | M3 | 5,500 | ₹2,62,845 |
| 1.08 | 12 mm thick plaster with cement mortar in proportion of 1:3 cement and fine sand of 1.25 F.M. SOR SI No. 582 | 118 | M2 | 175 | ₹20,650 |
| 1.09 | Providing and laying Cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone ballast 20 mm. nominal size) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors. SOR SI No. 279(b) | 2.04 | M3 | 7,100 | ₹14,484 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
t2.pdf
Tender Documents • 10.67 MB
BOQ_2145868.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .