| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC LADY LADY DISTY SUNAM SUB MINAR | SANGRUR | PUNJAB | 148001 | ₹2.3 Cr | L1 | Accepted-AOC Award of Contract the KEWAL KRISHAN GOVT CONTRACTOR by the committee for the Lower Bidder than others |
| 2 | L2₹2.4 CrRejected-AOC HOSHIARPUR | ₹2.4 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹2.5 CrRejected-AOC VPO SHERON TEHSIL SUNAM DISTT SANGRUR PUNJAB 148106 | BARNALA | PUNJAB | 148106 | ₹2.5 Cr | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Ramesh Kumar L2 | KEWAL KRISHAN GOVT CONTRACTOR L1 | JAGPAL SINGH CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation By Mechanical Means( Jcb Or Hydraulic Excavator) In Trenches For Pipelines With Straight Or Open Cutting In Streets Or Open Area Including And Dressing Sides Levelling Of Beds Of Trenches To Correct Grade, Cutting Joint Holes, Refilling Consolidation Including Cost Of Diversion For Traffic, Crossing Over Trenches For Access To The Houses, Watching Fencing Etc. And Removal Of Surplus Soil Outside/Inside The Town Invovling Lead Upto 15 Mtr Complete In All Respect. | 16,693.93 | cum | 16,69,393 ₹16.7 L | 17,52,862.65 ₹17.5 L | 18,19,638.37 ₹18.2 L |
| 2.00 | Earth Work In Excavation In Foundations Trenches Etc. In All Kinds Of Soil Where Pick-Jumper Work Is Not Involved And Not Exceeding 2.0 Metres Depth Including Dressing Of Bottom And Sides Of Trenches, Stacking The Excavated Soil Clear From The Edge Of Excavation And Subsequent Filling Around Masonry In 15 Cm, Layers With Compaction Including Disposal Of All Surplus Soil As Directed Within Lead Of 30 Metres. | 374.93 | cum | 71,236.7 ₹71,236.70 | 71,611.63 ₹71,611.63 | 78,360.37 ₹78,360.37 |
| 3.00 | First Class Brick Masonary 229 Mm Thick Laid In Cement Sand Mortar 1.6 In Foundation And Plinth Including Supply Recarriage Of Bricks Cement . | 145.8 | cum | 8,01,900 ₹8.0 L | 9,43,471.8 ₹9.4 L | 9,93,627 ₹9.9 L |
| 4.00 | 10Mm Thick Cement Plaster
1.4 On Sides Walls | 338.31 | sqm | 57,512.7 ₹57,512.70 | 61,234.11 ₹61,234.11 | 58,189.32 ₹58,189.32 |
| 5.00 | 10Mm Thick Cement Plaster 1:4 On Bed And Top. | 59.71 | sqm | 7,762.3 ₹7,762.30 | 8,299.69 ₹8,299.69 | 7,881.72 ₹7,881.72 |
| 6.00 | Reinforced Cement Concrete 1:2:4 Hand Mixed But Including Steel Reinforcement | 3.29 | cum | 3,290 ₹3,290 | 29,962.03 ₹29,962.03 | 31,462.27 ₹31,462.27 |
| 7.00 | Cement Conc.1:2:4 Including Supply, Carriage & With Stone Ballast Or Shingle | 15.56 | cum | 79,356 ₹79,356 | 95,056.04 ₹95,056.04 | 92,379.72 ₹92,379.72 |
| 8.00 | Cement Concrete 1:4:8 With Brick Ballast 40Mm Gauge | 22.95 | cum | 98,685 ₹98,685 | 99,648.9 ₹99,648.90 | 95,885.1 ₹95,885.10 |
| 9.00 | Providing Lowering, Jointing And Cutting Of Rcc Np-2 Plain End Pipes 700 Mm Dia With Rcc Collars & Laying Same To Correct Gradient And Alignment And Jointing Ends And Fixing Collars With Cement Mortar 1:2 As Per Is 458:2003 In All Depths Complete In All Respect. | 7,836.5 | metre | 2,11,58,550 ₹2.1 Cr | 2,07,04,033 ₹2.1 Cr | 2,15,58,211.5 ₹2.2 Cr |
| 10.00 | Providing Lowering, Jointing And Cutting Of Rcc Np-2 Plain End Pipes 150 Mm Dia For Vent Pipe Into Trenches And Laying Same To Correct Alignment As Per Is 458:2003 ( @2.50 Metre / No) | 65 | metre | 29,250 ₹29,250 | 31,070 ₹31,070 | 34,385 ₹34,385 |
Updated dates
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
10 Nov 2025, 1:00 pmClosed
Executive Engineer, Abohar Canal Ground Water Divi
Executive Engineer, Abohar Canal Ground Water Divi
CONSTRUCTION OF UG PIPELINE FOR VILLAGE SHERGARH GIAN SINGH OUTLET AT RD 537400 OF ABOHAR BRANCH
2025_WR_151332_1
E-Tendering Notice No.13/Abohar Canal Ground Water Division /2025-26 Dated 01/10/2025
Open Tender
Civil Works - Others
FAZILKA
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
Yes
₹4.0 L
Yes
Executive Engineer, Abohar Canal Ground Water Divi
22 Dec 2025
2 Oct 2025
10 Nov 2025
2 Oct 2025
10 Nov 2025
2 Oct 2025
6 Oct 2025
Excavation By Mechanical Means( Jcb Or Hydraulic Excavator) In Trenches For Pipelines With Straight Or Open Cutting In Streets Or Open Area Including And Dressing Sides Levelling Of Beds Of Trenches To Correct Grade, Cutting Joint Holes, Refilling Consolidation Including Cost Of Diversion For Traffic, Crossing Over Trenches For Access To The Houses, Watching Fencing Etc. And Removal Of Surplus Soil Outside/Inside The Town Invovling Lead Upto 15 Mtr Complete In All Respect.
Earth Work In Excavation In Foundations Trenches Etc. In All Kinds Of Soil Where Pick-Jumper Work Is Not Involved And Not Exceeding 2.0 Metres Depth Including Dressing Of Bottom And Sides Of Trenches, Stacking The Excavated Soil Clear From The Edge Of Excavation And Subsequent Filling Around Masonry In 15 Cm, Layers With Compaction Including Disposal Of All Surplus Soil As Directed Within Lead Of 30 Metres.
First Class Brick Masonary 229 Mm Thick Laid In Cement Sand Mortar 1.6 In Foundation And Plinth Including Supply Recarriage Of Bricks Cement .
10Mm Thick Cement Plaster 1.4 On Sides Walls
10Mm Thick Cement Plaster 1:4 On Bed And Top.
Reinforced Cement Concrete 1:2:4 Hand Mixed But Including Steel Reinforcement
Cement Conc.1:2:4 Including Supply, Carriage & With Stone Ballast Or Shingle
Cement Concrete 1:4:8 With Brick Ballast 40Mm Gauge
Providing Lowering, Jointing And Cutting Of Rcc Np-2 Plain End Pipes 700 Mm Dia With Rcc Collars & Laying Same To Correct Gradient And Alignment And Jointing Ends And Fixing Collars With Cement Mortar 1:2 As Per Is 458:2003 In All Depths Complete In All Respect.
Providing Lowering, Jointing And Cutting Of Rcc Np-2 Plain End Pipes 150 Mm Dia For Vent Pipe Into Trenches And Laying Same To Correct Alignment As Per Is 458:2003 ( @2.50 Metre / No)
Wrought Iron And Mild Steel Ladders, Framed Grills, Grating Etc. Complete Fixed In Position In D-Tank
Providing Orange Colour Safety Footrest Of Minimum 6Mm Thick Plastic Encapsulated As Per Is:10910 On 12Mm Dia Steel Bar Confirming To Is: 1786 Having Minimun Cross Section As 23Mm X 25Mm And Over All Minimum Length 263Mm And Width As 165Mm With Minimum 112Mm Space Between Protruted Legs Having 2Mm Tread On Top Surface By Ribbing Or Chequering Besides Necessary And Adequate Anchoring Projections On Tail Length On 138 Mm As Per Standard Drawing And Suitable To With Stand The Bend Test And Chemical Resistance Test As Per Specification And Having Manufacturer'S Permanent Identification Mark To Be Visible Even After Fixing, Including Fixing In Manholes With 230X150X75Cm Cement Concrete Block 1:2:4 (1 Cement: 2 Sand: 4 Stone Aggragate) Complete As Per Design.
Centreing & Shuttering For Concerte Faces
Dismantling Of Brick Work In Cement
Any other item
Ramesh Kumar (BID ID -692117)
JAGPAL SINGH CONTRACTOR (BID ID -696051)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tendernotice_2.pdf
PDF • 0.12 MB
Tendernotice_3.pdf
PDF • 0.67 MB
TB01.xls
Tender Documents • 0.04 MB
SBDPIPELINE.pdf
Additional Documents • 1.56 MB
BOQ_306453.xls
BOQ • 0.28 MB