Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | -49.99% | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 Cr+₹26.4 L (16.3%)Admitted-Finance | -41.83% | ₹1.9 Cr+₹26.4 L (16.3%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹28.3 L (17.5%)Admitted-Finance | -41.23% | ₹1.9 Cr+₹28.3 L (17.5%) | L3 | Admitted-Finance |
| 4 | L4₹1.9 Cr+₹31.9 L (19.8%)Admitted-Finance | -40.11% | ₹1.9 Cr+₹31.9 L (19.8%) | L4 | Admitted-Finance |
| 5 | L5₹2.3 Cr+₹70.7 L (43.7%)Admitted-Finance | -28.12% | ₹2.3 Cr+₹70.7 L (43.7%) | L5 | Admitted-Finance |
Tender Value
₹3.2 Cr
EMD Value
₹6.5 L
Closing Date
14 Aug 2025, 4:00 pmClosed
ADGP Hqrs PHQ
Srinagar
Construction
2025_DGPJK_283502_1
e-NIT/EE-PCD/PHQ/60/2025-26
Open Tender
Civil Works
Percentage
550 days
Goripora Awantipora
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
Exen PCD PHQ
₹6.5 L
20 Aug 2025
7 Aug 2025
16 Aug 2025
7 Aug 2025
14 Aug 2025
8 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | |||||
| 1.01 | Beyond 30 cm girth upto and including 60 cm girth. | 130 | No | 379.05 | ₹49,276.5 |
| 1.02 | Beyond 60 cm girth upto and including 120 cm girth. | 60 | No | 1,683 | ₹1,00,980 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 50 meter beyond 1 m from cutting edge All kinds of soil | 1,127.7 | Cum | 673.3 | ₹7,59,280.41 |
| - | Providing and laying of stone soling hand packed dry including all carriage and cost of material involved complete. | 160.52 | Cum | 1,000 | ₹1,60,520 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 107.01 | Cum | 5,202.9 | ₹5,56,762.33 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 275.76 | Cum | 7,788.4 | ₹21,47,729.18 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 244.51 | Cum | 5,733.6 | ₹14,01,922.54 |
| - | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 149.87 | Cum | 9,395.7 | ₹14,08,133.56 |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 226.4 | Cum | 9,821.85 | ₹22,23,666.84 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_872384.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .