| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.6 LAccepted-AOC | L-1 | Accepted-AOC BEING L-1 | |
| 2 | L-2₹5.8 L+₹1.2 L (26.4%)Rejected-AOC | L-2 | Rejected-AOC BEING L-2 | |
| 3 | Rejected-Technical CONTRACTOR SC 133 A B TYPE COLONY SARNI DISTT BETUL M P 460 447 | BETUL | MADHYA PRADESH | 460447 | - | Rejected-Technical FIRM NOT SUBMITTED DOCUMENTS AS PER PQR CRITERIA | |
| 4 | Rejected-Technical | - | Rejected-Technical ORDER COPY SUBMITTED BY FIRM IS NOT AS PER PQR CRITERIA |
Tender Value
₹4.6 L
EMD Value
₹11,500
Closing Date
29 Apr 2021, 3:00 pmClosed
SE (WORKS)
STPS, MPPGCL SARNI
Pre Monsoon and During Monsoon Maintenance Works Of Dam Site Hoist Assembly and Gantry Crane At Satpura Dam, STPS, Sarni.
2021_MPPGC_135114_1
WT-3430
Open Tender
Miscellaneous Works
Item Rate
120 days
STPS, MPPGCL SARNI
AS PER NIT
4 documents required · 4 mandatory
₹500
Yes
₹11,500
Yes
10 Jun 2021
7 Apr 2021
3 May 2021
7 Apr 2021
29 Apr 2021
7 Apr 2021
Pre monsoon & During monsoon maintenance works of Dam site hoist assemble and gantry crane at Satpura Dam, Sarni
Overhauling of the rope drums, lubricating of wire rope Appling cardium compound servo coal C-120/320 Thorough inspection of bearings, greasing, of the bearing, checking and tightening if fixing clamps and their replacement if required, replacement of damage nut bolts. Alignment of wire rope. Complete Job as per Engineer-in-charge. 28 Jobs for 14 Gates (2 jobs per gate)
Inspection, greasing, oil top up & alignment Works of Central drive assembly three stage gear Box One Job includes: (i) Decoupling of motor & worm shaft. (ii) Dismantling of Inspection cover. (iii) Dismantling of all the bearing covers. (iv) Draining of contaminated oil form the Oil chamber. (v) Dismantling & Removal of top cover Gear box of central drive Assembly (vi) Cleaning & Inspection of all the Gears, Gearings and Oil seals. (vii) Greasing of all bearing and refitting of Bearing covers. (viii) Refitting of top cover of Gear box and Filling the fresh oil up to the required level. (ix) Alignment of Motor & Worm shaft Re-Coupling and greasing. (x) Refitting of Inspection cover after Replacement of Rubber gasket. 14 Jobs (One Job Per Gates)
Inspection and oil top up work of End gear boxes of rope Drum. (i) Dismantling of Inspection cover. (ii) Draining of contaminated oil from the Oil Chamber. (iii) Inspection of the Gear. (iv) Filling the fresh oil up to the required level. (v) Refitting of Inspection cover after replacement of Rubber Gasket. 28 Jobs (Two Jobs Per Gates)
Brake Adjustment of the Central drive Unit One Job involves: (i) Removal of cover of Brake Assembly. (ii) Cleaning of the Brake Drum using Fine & medium emery paper. (iii) Cleaning of the Brake shoes using Petrol only. (iv) Tightening of the foundation bolts of brake assembly (v) Adjustment of the Brakes & Trial Retightening of check nut for any slip. (vi) If required Replacement of Brake shoe liner By removal of old liner, drilling holes in new liner and riveting. Readjustment of brakes. (Liner and copper rivets shall be arranged be firm) (vii) Refitting of cover. 14 nos. (One Job Per Gate)
Assistance in attending various defects during running Maintenance of gear boxes, crane, centre drive assembly, Limit Switches, wire ropes etc. during monsoon. Under this scope you will have to depute three Nos. semiskilled and two Nos. skilled fitter for any job of maintenance as and when the requirement arises during period between June to Sept.’2021.
Draining of contaminated oil and filling of fresh oil in the gear box of main hoist of Gantry crane. The Job includes: (i) Making platform for safe working. (ii) Draining of contaminated oil. (iii) Dismantling of Inspection cover of central gear box, 01 no. and End assembly gear boxes, 02 Nos. (iv) Decoupling of motor worm shaft. (v) Inspection of gears, bearings, greasing, filing of the fresh oil and box up of the inspection covers after replacements of their gaskets. (vi) Alignment of the motor-worm shaft and Re coupling and Greasing. (vii) Dismantling of Platform.
Draining of contaminated oil and filling of fresh oil in the gear box of Auxiliary hoist of Gantry crane. The job includes: (i) Making platform for safe working. (ii) Dismantling & lifting of top cover. (iii) Draining of contaminated oil. (iv) Dismantling of Inspection cover of Gear box (v) Decoupling of motor drive shaft. (vi) Inspection of gears, bearings, greasing, filling of the fresh oil and box up of the inspection covers after replacement of their gaskets. (vii) Alignment of the motor-drive shaft and Re-coupling and Greasing. Dismantling of Platform.
Checking of the tightness of clamps of wire ropes of Main Auxiliary hoist and application of Servo coat C 120/140/320 Cardium compound on the entire Wire & Aux. hoist Rope of main and auxiliary hoist after making platform for safe working and removal of platform after completion of work. 01 job for main and Aux. hoist.
MB CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .