| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC MOHON BAGAN MORE SAINTHIA BIRBHUM | BIRBHUM | BIRBHUM | WEST BENGAL | ₹7.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.4 L+₹7,535.12 (1.03%)Rejected-Finance | ₹7.4 L+₹7,535.12 (1.03%) | L2 | Rejected-Finance OTHER THAN L1 |
| 3 | L3₹7.5 L+₹15,070.24 (2.06%)Rejected-Finance KUSUMGARIA LABPUR BIRBHUM | BIRBHUM | BIRBHUM | WEST BENGAL | ₹7.5 L+₹15,070.24 (2.06%) | L3 | Rejected-Finance OTHER THAN L1 |
| 4 | Rejected-Technical | - | - | Rejected-Technical technically not qualified |
Tender Value
₹7.5 L
EMD Value
₹15,070
Closing Date
9 Feb 2026, 12:00 pmClosed
Executive Engineer MHQD
Offce of the Executive Engineer,MHQD
Procurement of flood fighting materials for Kuia Ex-Zamindary left embankment from Pantha Nivas to Taltala (1.80 km) and right embankment from Lahodda to Khanpur Minibarrage (10.40 km) of Kuia River during monsoon period of the year 2026 in block-
2026_IWD_995190_6
WBIW/EE/MHQD/e-NIT-09/2025-26
Open Tender
CIVIL WORKS
Percentage
120 days
Suri
Please refer Tender documents.
7 documents required · 7 mandatory
₹15,070
Yes
18 May 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
Cutting and clearing jungles including shrubs, water weeds, bushes,trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge.
Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile.
Extra rate over Item Nos.2 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. One Additional Lead
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, Beyond 500 metre and upto 1.00 km
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
Extra rate for item no above for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
Supply of Fine Sand (Grading Zone-III as per IS-383-1970) Staked at site
Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete.
Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of Nylon crate is 1metre X 1metre X 1metre. (a) Where boats are not necessary.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.80 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2436101.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .