Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-Finance 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | L1 | Accepted-Finance BOQ Accepted | |
| 2 | L2₹1.3 L+₹10,000 (8.33%)Accepted-Finance | L2 | Accepted-Finance BOQ Accepted |
Tender Value
₹1.1 L
EMD Value
₹1,100
Closing Date
30 Sept 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer/Mechanical-I
O/o SE/MI/TTPS
SE/MI/TTPS/157/2020-2021
2020_EB_179496_1
157-Repalcement of boom conveyor tail end pulley
Open Tender
Miscellaneous Works
Lump-sum
175 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,100
17 Oct 2020
15 Sept 2020
1 Oct 2020
15 Sept 2020
30 Sept 2020
15 Sept 2020
90 days
Replacement of boom conveyor tail end pulley bearings with new bearings in Reclaimer-I & II machine
Charges for renewal of failed bearings in the boom conveyor tail end pulley of Reclaimer I & II machines involves the activities of loosening the boom conveyor belt by adjusting the tail pulley take up device at both sides, removing the arresting structure beam of bearing housing & take up device., removing the bearing housing from the guide way, withdrawal of the bearings, sleeves, labyrinth ring seals etc., after providing the fabricated derrick posts at both sides and removing the bearing using the withdrawal fixtures, assembling the new bearings ( 23028 CDKE4 C3 bearings with new adopter sleeve H 3028 ) after placing the bearing housing in the guide ways properly and centering the tail end pulley, fixing the arresting structure frames at both sides with new MS fasteners, tightening the conveyor belt by tightening the tail pulley adjustment, greasing both sides of the bearing, normalizing the system. Trial run operation and devolution of the released bearing to stores including the cost of all consumables, leads & lifts etc complete.
M/s. Rajesh and Company
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .