Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹37.0 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹37.3 L+₹31,384 (0.85%)Rejected-Finance | 2 | Rejected-Finance Not L1 | |
| 3 | 3₹39.3 L+₹2.3 L (6.27%)Rejected-Finance | 3 | Rejected-Finance Not L1 | |
| 4 | 4₹39.5 L+₹2.5 L (6.72%)Rejected-Finance | 4 | Rejected-Finance Not L1 | |
| 5 | 5₹42.9 L+₹5.9 L (16.0%)Rejected-Finance 72 USMAN ENCAVE SECTOR O ALIGANJ LUCKNOW 226004 UP | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226004 | 5 | Rejected-Finance Not L1 |
Tender Value
₹41.5 L
EMD Value
₹82,900
Closing Date
27 Jul 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE LUCKNOW
HQ CWE Lucknow, 229 MG Road, Lucknow Cantt, Lucknow-226002
PROVN OF PREPAID METERS AND ALLIED WKS FOR CENTRAL AMENITIES UNDER GE (EAST) LUCKNOW
2022_MES_529720_2
CWE/LKO/EM/T-44 OF 2022-23
Open Tender
Civil Works - Others
Item Rate
1095 days
Lucknow
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE East lucknow
₹82,900
Yes
17 Sept 2022
8 Jul 2022
29 Jul 2022
8 Jul 2022
27 Jul 2022
15 Jul 2022
8 Jul 2022 - 15 Jul 2022
Amount
Phase I (From Item 1.00 to 8.00 including sub items)
Taking down carefully by disconnecting and unscrewing from boards/outlet boxes, electric meters of any locations and deposited to MES store yard as per bldg inventry by sub div complete all as specified and directed.
Supply, installation, testing and commissioning of single phase, 02 wire, single source tamper proof electronic ,direct connected Digital Smart Energy meter, rating 10-60 Amps, 240 Volts,50 HZ accuracy class-1.0, BIS marked IS-16444:2015 (reaffimed 2020) & relevant ICE standered with cellular network/4G /5G module for connectivity with HES & having LCD type display and parameter like voltage ,current,frequency power ,power factor ,kwH cumulative energy and max demand, calibration LED, Optical communication port, push button for scroll and having online energy monitoring and billing system , features for load disconnection /reconnection through remote software /data expert to ERP , anti-tamper features including sealing facility complete, communication protocol DLMS and all as specified and directed by Engr-in-charge. the quoted rate shall have deemed to be inclused of following the parameters:
(a) Meter reading record shall be submitted before and after replacement duly signed by the contractor rep and MES rep. (b) Any rejoining of wire /cables shall be done using suitable ferrule/cable connecters after removal of the meter. (c) the cost of making good disturbed surface &matching to the existing surface is deemed to be included in the unit quoted rates.Make: HPL/L&T/Secure/Panasonic
Supply, installation, testing and commissioning of three phase, 04 wire, single source tamper proof electronic ,direct connected Digital Smart Energy meter, rating 10-60 Amps, 240 Volts,50 HZ accuracy class-1.0, BIS marked IS-16444:2015 (reaffimed 2020) & relevant ICE standered with cellular netwok /4G /5G module for connectivity with HES & having LCD type display and parameter like voltage ,current,frequency power ,power factor ,kwH cumulative energy and max demand calibration LED, Optical communication port, push button for scroll and having online energy monitoring and billing system , features for load disconnection /reconnection through remote software /data expert to ERP , anti-tamper features including sealing facility complete, communication protocol DLMS and all as specified and directed by Engr-in-charge. the quoted rate shall have deemed to be inclused of following the parameters :-
(a) Meter reading record shall be submitted before and after replacement duly signed by the contractor rep and MES rep. (b) Any rejoining of wire /cables shall be done using suitable ferrule/cable connecters after removal of the meter. (c) the cost of making good disturbed surface & matching to the existing surface is deemed to be included in the unit quoted rates.Make: HPL/L&T/Secure/Panasonic
Supply and fixing of cloud based Smart Metering system including required software, date base defining, mapping of consumers and running the vending system for each meter for lifetime validity and training department for one year complete all as directed. MDAS should have facility to download meter data periodically, shall support on demand download of instantaneous, billing, tamper data, dashboard for viewing instantanous meter data, facility to connect / disconnect meter individually, the meter data automatically make the data available to the billing system. the billing system would support offline / online meter data entry. (a) Billing Module: the billing moudle would collect the data from the meter data manangement moudle , calculate billing determinates and make energy data /billing data available to admiin /user. (b) Occupation and vacation Module:the system would support the occupation / vacation based on the units catagories . the system would support the automatic data capture on occuupation and vacation events.
(c) Website:there would be dedicated website for AGE /GE/BSO team to veiw all the data imformation along with the customer portal for use of user. (d) Customer Module:the system would include a customer portal for the resident /occupants to log in and veiw their own energy /billing data recharge facility . there shall be consumer APP (Android and iOS based )also to log in and veiw their own energy / billing data and recharge facility. (e) Comunication Module: the system would provide communication of energy data and bill via print, email and sums methods. (f) Meter master data: the system would support meter data repository. The system would support meter replacement process. (g) The software should be designed to integrate more numbers of meters (minimum 3000 Nos)of any make with the above specification of meters. (h) Prepayment/recharging facility: the system should allow online /digital recharging through consumers APP (Android and iOS basesd ) and the Web portal . The configration and neccessary arrangement for payment gateway with the bank account shall be deemed included in the quoted rate. the system should send connect/ disconnect command on the basis of available credit.
(i) Low credit alarm: the system will give an alarm over the cosumer app and SMS to the register mobile No in case the credit in the meter goes down below a pre defined limit. (j) Emergency Credit : the meter will work even whe credit fall down to zero to prevent disconnection .this limit shall be configurable. (k) The software shall be audited by CERT -India empanelled firm submission of certificate and cost of audit shall be borne by the contractor (l) The cloud Server should be as per OEM recommendations for hosting of data from the software / App. OEM should have the necessary certificates / permissions from NIC/ Meity / NICSI or any competent authority of govt dept. The software should be compatible for integration, transfer, storage and hosting of data on NIC cloud /server (m) The necessary up gradation of software and charge for hosting on NIC Cloud shall deemed be included in the quoted rate. The above software configuration shall also. (n) The app & web based software shall have provision of sending SMS for receipt of payment, payment reminder, low balance alerts, disconnection / connection alerts & monthly consumption & billing details.
Supply and fixing all in one destop I7 OS PC with dual core processor 4 GB RAM 500 GB HDD Window 10 PC 21.5" MONITOR 1-cd/dvd COMBO DRIVE R/W TYPE 4 usb port including vedio card cordless key board &mouse with licenced operating system (Window 10 ) complete all as specified. Make: Dell/Lenovo/HP including UPS with the following specification (a) capacioty 600 VA with output voltage 230 V AC +10% Oof 50HZ+1% (b) battery of 12 volt 7 AH-1 No with 30 min backup with full battery condition. (c) out put wave form of pseudo sine. (d). Off battery mode charging with high voltage protection(d) battery warranty of at least 5 year. Make: v-gaurd /luminious/microteck (e) Supply of laserjet printer with single function black and white with printing speed of min 18 page per minutes wiyh resulution 600x600x2DPI complete all as specified and directed by Engineer in charge Make: HP Model P1108 or equvalent in EPSON/CANON
M/L for Sub Main wiring with under mentioned runs of S/C PVC insulated but unsheathed FRLS cable of specified size with multi stranded copper conductor 1100 volt grade IS-694 marked drawn through and including non metallic PVC conduit pipe medium grade ISI marked along with fittings and accessories all fixed on surface of wall in conduit and also including the specified runs of specified size earth continuity conductor of similar type of cable complete all as specified and directed (the under mentioned specified runs of single core cables and specified runs of earth continuity conductors and the relevant conduit with accessories shall be measured as one length).
(a) 2 run of 10.0 Sqmm cable and 1 run of 6.0 sqmm cable connected to common earth dolly
(b) 2 run of 6.0 Sqmm cable and 1 run of 4.0 sqmm cable connected to common earth dolly
Supply & fixing concealed sheet metal enclosure for Electric meter space one meter with transparent fiber glass door with seal & water and fire proof as per sample. Note:- Including rate for cutting wall, plaster, matching color wall, and good finishing.
Supply and fix VPN IPV6 Static SIM card including necessary recharge for proper connectivety & functionality of smart meter and software complete all as specified and directed.
Phase II Comprehensive maintnance & Operation (Item 9 and 9.01)
After successful installation and commissioning of all the smart meter & integration of all meter datas on software and app. Contractor shall carry out comprehensive maintnance & operation of whole system for the duration of 36 months & shall include all operating charges, transaction charges, Cloud based Vending Portal management charges, Leased line charges for cloud server connectivity & database maintainence. These charges shall be paid monthly for all meters (Total 208 Nos meters) for three Years and comprehensive maintanance of smart meters include the following: (a) the contractor would ensure the availablity of proper network in all Sims at all specified location for proper connectivity of meter & software. In case of the network issue contractor would liaise with telecom service provider as required for neccessary resolution. If network issue not resolved then contractor shall replace the sim & change serivce provider of sim as required & directed by Engr-in-Charge. (b) SMS would be sent for the payment alerts, low balance alerts, and disconnection /connection alerts, neccessarey payment of the internet charge is also included in quoted rate.
(c) software AMC: it includes the neccessary up gradation in the software such as support to the chrome browser changes android version change iOS version. These changes happen on the frequent basis and the software should support all the changes. (d) Remote server admin support : Ensuring adequate data base back up ,up gradation in the operation system anti virus update database upgradation etc. (e) Software installation on any alternate backup server if required. (f) Maintanance of meters for smooth functioning and operation. (g) The quoted rate is deemed inclusive of the cost for all consumables like cartridges, papers etc for printing of bills and generation of reports. (h) All Sims installed in all 208 Nos meters shall be recharged with adequate plan from the service provider for the complete duration of 36 Months for comprehensive maintenance. This provision is deemed included in the quoted rates. If any single day report is not generated or connection between meter & vending station due to non-recharging of sim breaks then a penalty of Rs. 20/- per Sim/ meter per Day shall be levied. (j) Any disconnection / hindrance occurring due to any means shall be mitigated the same day by contractor. Note :-The quoted rate shall be deemed to include for all labour, materials and software support etc complete
Skyline Encon
KPELECTRICAL AND AUTOMATION
DUBEY TRADERS & eNGINEERS
Unnati Engineers
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .