Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.1 LAccepted-AOC MATHARDEV WARD PATHAKHEDHA SARNI BETUL MP 460001 | BETUL | MADHYA PRADESH | 460001 | ₹25.1 L | L1 | Accepted-AOC l1 |
| 2 | L2₹25.1 LRejected-AOC | ₹25.1 L | L2 | Rejected-AOC l2 |
| 3 | Rejected-Technical Q NO NII 24 MPEB COLONY BIRSINGHPUR DISTT UMARIA MP | - | - | Rejected-Technical DISQUALIFIED |
| Sl No | Description | Qty | Unit | G S CONSTRUCTION L1 | NIGAM CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00SGTPS Birsinghpur | |||||
| 1.01 | “Routine maintenance Fan circuit group (ID/FD/PA/SA Fans) along with complete LOP system and fuel pressuring & unloading system (HFO & LDO pumps) for Unit No. 1 to 4 of PH-I and PH-II” at SGTPS, MPPGCL, Birsinghpur | 20,24,516.45 | 1 year | 1,01,225.82 ₹25.1 L | 1,01,225.82 ₹25.1 L |
Tender Value
₹25.1 L
EMD Value
₹50,300
Closing Date
7 Mar 2024, 3:00 pmClosed
SE(PNW) SGTPS
SE(PNW) SGTPS
Work contract for Routine maintenance Fan circuit group (ID/FD/PA/SA Fans) along with complete LOP system and fuel pressuring and unloading system (HFO and LDO pumps) for Unit No. 1 to 4 of PHI and PHII at SGTPS, MPPGCL, Birsinghpur
2024_MPPGC_323954_1
323954
Open Tender
Electrical and Maintenance Works
365 days
SGTPS
AS PER PQR CLAUSE 5
14 documents required · 14 mandatory
₹1,000
Yes
₹50,300
Yes
14 Feb 2026
27 Jan 2024
11 Mar 2024
27 Jan 2024
7 Mar 2024
27 Jan 2024
SGTPS Birsinghpur
“Routine maintenance Fan circuit group (ID/FD/PA/SA Fans) along with complete LOP system and fuel pressuring & unloading system (HFO & LDO pumps) for Unit No. 1 to 4 of PH-I and PH-II” at SGTPS, MPPGCL, Birsinghpur
NIGAM CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid