Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-AOC | ₹17.0 L | L1 | Accepted-AOC Less rate |
| 2 | L2₹17.2 LRejected-AOC | ₹17.2 L | L2 | Rejected-AOC High Rate |
| Sl No | Description | Qty | Unit | M/s.R.N.P. Govindaraj Enterprises L2 | P.Deivanai Contractor L1 |
|---|---|---|---|---|---|
| 1.00Strenthening of Road from J.P Road to Vanaganapalli KM 0/0-1/550 H/O Settipalli (R-217) | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 660 | sqm | 6.43 ₹4,243.80 | 6.36 ₹4,197.60 |
| 3.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 272.25 | Cum | 133.26 ₹36,280.04 | 131.86 ₹35,898.89 |
| 4.00 | Picking 5 cm to 10 cm old metalled surface and sectioning -1 sq.m | 550 | Cum | 23.6 ₹12,980 | 23.36 ₹12,848 |
| 5.00 | Providing Gravel with a lead including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete | 99.15 | Cum | 344.65 ₹34,172.05 | 341.03 ₹33,813.12 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete | 247.5 | Cum | 2,410.46 ₹6.0 L | 2,385.17 ₹5.9 L |
| 7.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp | 1,650 | sqm | 89.23 ₹1.5 L | 88.29 ₹1.5 L |
| 8.00 | Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp | 1,650 | sqm | 20.91 ₹34,501.50 | 20.69 ₹34,138.50 |
| 9.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 41.25 | Cum | 11,524.74 ₹4.8 L | 11,403.84 ₹4.7 L |
| 10.00 | Providing HM stones | 2 | no | 580.63 ₹1,161.26 | 574.54 ₹1,149.08 |
Tender Value
₹17.1 L
EMD Value
₹18,000
Closing Date
29 Jan 2026, 3:00 pmClosed
Block Development officer,Thally
Block Development office,Thally
Krishnagiri District Thally Union UGF_2025_2026 Strenthening of Road from JP Road to Vanaganapalli H_O Settipalli TLY54
2026_RDTN_645240_1
777_2025_A5_30_12_2025
Open Tender
Civil Works - Roads
180 days
Block Development office, Thally
Refer tender doc
3 documents required · 3 mandatory
₹0
₹18,000
Block Development office,Thally
9 Apr 2026
21 Jan 2026
29 Jan 2026
21 Jan 2026
29 Jan 2026
21 Jan 2026
21 Jan 2026
Strenthening of Road from J.P Road to Vanaganapalli KM 0/0-1/550 H/O Settipalli (R-217)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking 5 cm to 10 cm old metalled surface and sectioning -1 sq.m
Providing Gravel with a lead including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing HM stones
Road Marking with hot applied thermoplastic compound with reflectorising glass beads in bituminous surface
Name Board
Provision for sign board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_773266.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.63 MB
PB54_compressed.pdf
Tender Documents • 0.19 MB
TB54_compressed.pdf
Tender Documents • 0.26 MB
BOQ_773266.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid