| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.1 L
EMD Value
₹5,100
Closing Date
28 Jul 2025, 5:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle-Unnao
Quantum of work involved in Erection of Line/Installation equipments for Load Enhancement of connection of Unnao Railway Station, Unnao c/o Dy. CEE, Gati Shakti Unit, Northern Railway, Lucknow Division, 11 KV feeder Moti Nagar, emanating from 33/11
2025_MVVNL_1058305_1
50/E.D.C./Unnao/2025-26
Open Tender
Miscellaneous Works
Fixed-rate
180 days
Unnao
as per tender document
2 documents required · 2 mandatory
₹1,180
A/C-No.3355002101008374,IFSCCode- PUNB0335500
₹5,100
2 Aug 2025
18 Jul 2025
29 Jul 2025
18 Jul 2025
28 Jul 2025
18 Jul 2025
Amount
Safe Carriage of following materials from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking distance as per indent.
250 KVA 11/0.4 KV T/F
11 KV VCB Panel
LT PVC Cable of size 1x400 sq mm
I/D Cable Jointing Kit of size 3x70 sqmm
O/D Cable Jointing Kit of size 3x70 sqmm
11 KV XLPE Cable of Size 3x70 sq mm
11 KV Pillfer Proof Metering Cubical 10/5 A
11 KV CT/PT Metering D/Pole Mounted Unit 10/5 A
Fixing of 11 KV D.O. Fuse Set at Double Pole with D.O. Fuse mounting Channel, clamps and nut & bolts including all associated work.
Supply & Fixing of following materials for above job-
11 KV D.O. Fuse Set
MS Channel for D.O. Fuse Set
Clamp for mounting Channel with N&B
Construction of masonry type T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.5 mtr x 1.5 mtr x 1.5 mtr (LxBxH) solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth as per RESPO norms. (All the material will be arranged by the contractor)
Placement of 11/0.4 KV T/F from dump site to newly constructed T/Fs Plinth & installation and commissioning of 250 KVA T/F and All the jumpering & connection with the system are included in the scope of work. (All the required materials for above job shall be provided by contractor except 250 KVA 11/0.4 KV T/F)
Supply & Fixing of following materials for above job-
Al. Lugs for 250 KVA T/F @ 04 nos. for each T/F
Copper L-piece @ 04 nos. for each T/F
Earthing of Neutral of Transformer & Transformer body by way of boring and lowering of ‘B’ class G.I. Pipe 1.5” dia from ground up to the water level (Minimum 40 ft. Deep) with a solid cone at the lower end of G.I. pipe. Connecting and bringing out contineous G.I. Strip size 32X5 mm. from the cone to the ground surface where it will be connected with G.I. pipe clamp from which Transformer neutral & Body connection being done by G.I. Strip as per RESPO norms . (All the material will be arranged by the contractor)
Earthing of 11 KV Pillfer Proof Metering Cubical by way of boring and lowering of ‘B’ class G.I. Pipe 1.5” dia from ground up to the water level (Minimum 40 ft. Deep) with a solid cone at the lower end of G.I. pipe. Connecting and bringing out contineous G.I. Strip size 32X5 mm. from the cone to the ground surface where it will be connected with G.I. pipe clamp from which Transformer neutral & Body connection being done by G.I. Strip as per RESPO norms . (All the material will be arranged by the contractor)
Earthing of 11 KV CT/PT Metering D/Pole Mounted Unit by way of boring and lowering of ‘B’ class G.I. Pipe 1.5” dia from ground up to the water level (Minimum 40 ft. Deep) with a solid cone at the lower end of G.I. pipe. Connecting and bringing out contineous G.I. Strip size 32X5 mm. from the cone to the ground surface where it will be connected with G.I. pipe clamp from which Transformer neutral & Body connection being done by G.I. Strip as per RESPO norms . (All the material will be arranged by the contractor)
Earthing of 11 KV VCB by way of boring and lowering of ‘B’ class G.I. Pipe 1.5” dia from ground up to the water level (Minimum 40 ft. Deep) with a solid cone at the lower end of G.I. pipe. Connecting and bringing out contineous G.I. Strip size 32X5 mm. from the cone to the ground surface where it will be connected with G.I. pipe clamp from which Transformer neutral & Body connection being done by G.I. Strip as per RESPO norms . (All the material will be arranged by the contractor)
Laying of LT PVC Cable of size 1x400 sq mm including all associated work. (All the material will be arranged by the contractor)
Fabrication and erection of Distribution Transformer fencing around Transformer and L.T. Distribution Pillar Box with 01 nos. gate & locking arrangement including cost of M.S. Angle size 40x40x5 and M.S. Flat size 25x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint in iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil & dust as per RESPO norms. (All the material will be arranged by the contractor)
Installation & commissioning of 11 KV VCB at connection site as per RESPO Norms with complete all work as required.
Installation & commissioning of new 11 KV Pillfer Proof Metering Cubical 10/5 A at connection site as per RESPO Norms with complete all work as required.
Installation & commissioning of new 11 KV CT/PT Metering D/Pole Mounted Unit 10/5 A at connection site as per RESPO Norms with complete all work as required.
Laying of 11 KV XLPE Cable of size 3X70 sq mm as per RESPO Norms with complete all work as required. (All the material will be arranged by the contractor)
Fixing of 11 KV I/D Jointing Kit for XLPE Cable size 3x70 sq mm with complete all work as required. (All the material will be arranged by the contractor)
Fixing of 11 KV O/D Jointing Kit for XLPE Cable size 3x70 sq mm with complete all work as required. (All the material will be arranged by the contractor)
11 KV Cable Hosting including jumpering etc. complete work with help of G.I. Pipe as per RESPO Norms (All the material will be arranged by the contractor)
Supply & Fixing of following materials for above job-
G.I. Pipe 6'' dia.
Dismantling & Safe Carriage of 100 KVA T/F from work dump site to Electricity store center Unnao with loading, unloading and proper stocking.
Pankaj Trading Company (BID ID -5385018)
M/s PRAMENDRA SINGH (BID ID -5383035)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .