| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.9 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹41.6 L+₹1.7 L (4.18%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹41.6 L+₹1.7 L (4.32%)Rejected-Finance | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹43.1 L+₹3.2 L (7.93%)Rejected-Finance | L4 | Rejected-Finance Not Lowest | |
| 5 | L5₹45.7 L+₹5.8 L (14.6%)Rejected-Finance PLOT NO 28 SANTOSHIMA COLONY WEST MARREDPALLY SECUNDERABAD 500026 | HYDERABAD | TELANGANA | 500026 | L5 | Rejected-Finance Not Lowest |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
18 Jun 2021, 6:00 pmClosed
GE I R and D Kanchanbagh
GE I R and D Kanchanbagh Kanchanbagh Post Hyderabad 500058
OUTSOURCING OF SERVICES FOR CENTRAL /PACKAGE TYPE AC PLANTS AT ASL AND NGARM PROJECT AREA OF GE (I) RND KANCHANBAGH, HYDERABAD.
2021_MES_445018_1
GE I KBAGH TOKEN 12 OF 2021 2022
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
Hyderabad
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE I R and D Kanchanbagh
₹98,000
Yes
29 Jun 2021
22 May 2021
21 Jun 2021
22 May 2021
18 Jun 2021
5 Jun 2021
22 May 2021 - 29 May 2021
Amount
Outsourcing of services for Central /package type AC plants (AC operators - 01 No. Semi Skilled) of the following capacities comprising of compressors, condensers, cooling towers, chillers, AHU's and pipe lines complete from cooling tower to pumps, refrigerant piping of all gauges, controls, expansion valves, filters, suction and discharge valves, electric motors of compressors, blowers, mono block pump sets including all starters of all motors, electrical panel including bus bars, insulators, humidifiers, meters including charging of refrigerant gas R-22/134a/407c as and when required, `O' rings, gaskets, nuts, bolts, washers, routine checks like oil checking, `V' belts checking, gas (R-22/134a/407c) leakage checking, electrical control panel checking , greasing to motors & pump sets, but excluding repairs to the plants etc complete in one shift of 8 hours from 0900 to 1700 hours excluding Sundays/holidays complete all directed by Engr-in-charge, of the following plants :-
2 x 45 TR Central Air cooled plants at DOFS and 3 x 20 TR Central AC plant at Bldg No. 34-2 (Old Astra bldg)
2 x 30 TR Central Air cooled plants and 3 x 20 TR Central AC plant at Range system bldgs,
3 x 11 TR Package type plants at RCS Integration (LPD/SFDR) and 2X16.5 TR package type plants at EDF bldgs.
3 x 48 TR Central AC plant at Digital Video bldgs and 2 x 11 TR Package type plant at Bldg No-24.
3 x 50 TR Central AC plant at Data bldgs, 2 x 16.5 TR package type plant at bldg No. 31 (Control room).
3x8.75 TR package type plant at bldg No 84-2, 1 x 5 TR Package type plant and 1 x 7.5 TR package type plant at SPSC Bldg.
2 x 7.5 TR Package type plant at ZZ-Cat Mag, Bldg. 3 x 11 TR Central AC plant at Machine Facility.
1 x 7.5 TR Package type plant at SPRITE and 1x39 TR Central AC plants at ZZ-YY Plants.
3 x 40 TR Central AC plants at Magazine 1.3 and 3 x 11 TR Central AC plant at Magazine 1.1
3 x 75 TR Central AC plants at NGARM.
3 x 40 TR Central AC plants at Explosive Bldg.
All as per item No. 1 here-in-before, but in two shifts of 8 hours each from 0600 hrs to 1400 hrs and 1400 hrs to 2200 hours, (01 No. semi skilled operator per each shift) of the following plants :-
3 x 145 TR Central AC plant at New Astra.
Note for item No. 1 & 2 : (i) In case of requirement tradesmen provided per one area may be utilized in other areas at the discretion of the department without any extra cost to department as directed by Engineer-in-charge. (ii) Rate quoted is deemed to be included for leave reserved/off of the staff employed. (iii) The rate quoted shall be deemed to include the cost of uniform, shoes, helmet, belt and insulation gloves for tradesmen employed. (iv) The necessary tools & plants shall be provided by the contractor. (v) Minimum wages to the employees to be paid for as per the Govt of India norms (wages as declared in Sch `A' Notes) and the same to be deemed to be included in the quoted rate. (vi) Each employees should be faciliated with adhoc bonus privilage as applicable in accordance with Govt Of India and the same to be deemed to be included in the quoted rate. (vii) In case of absence of operator, double the rate quoted to be recovered.
(viii) During operation of installations / equipments necessary safety precautions / safety device to be adopted and the quoted rate is deemed to be included for same & in case any type of accidents happend on duty to tradesmen / operators the contractor is fully responsible. (ix) The contractor will adhere to pay monthly payment cycle to the employees irrespective of RAR/Funds availability with department. (x) The materials required for the area cleaning and AC plant cleaning (Cotton Waste, Brooms and Carbon Cleaner for Battery terminals) and water pipe for watering in earth pits will be provided by the Contractor and cost of cleaning materials and pipe, provision of Printed Log Books & Stationery required is deemed to be included in quoted rate (xi) After handing over duty to Reliever only the duty person should leave the installation in Shift duties. (xii) Contractor to comply all the respective notes of Particular Specifications attached. (xiii) Contractor is responsible to provide necessary face mask and sanitizer at each installation keeping inview of Covid-19 and the same is deemed to be include in the quoted rates.
Note: 1. Contractor shall quote cumulative of basic rate,VDA , employers contribution towards EPF liability, contribution towards ESIC, contribution towards bonus, over head and profit as applicable as per instruction in vogue including all Taxes, Cess, Levies as applicable including GST. 2. Monthly wages shall be paid by the contractor to the workers/labour only online. Proof of statutory deductions in favour of workers/labour shall be submitted by the contractor to the GE. The contractor will be required to submit copy of valid labour licence from the labour Commissioner within 15 days of commencement of the work. If the contractor fails to submit the same within this stipulated period the contact shall be liable to be cancelled and the performance Secuirty of the firm shall be forfeited accordingly. Reference is also invited to this HQ letter No.A/37696/Gen/Pol/E2W(PPC) dated 27 July 2017 as amended vide letter of even No. dated 09 May 2018.
Leak testing of the AC plant with nitrogen (N2) pressure after evacuating of the existing gas from the system into empty cylinder by separating the entire system, like compressors, evaporator, condensers, cooling coil and refrigerant lines and rectifying the leakage including cutting welding brazing etc and replacing of 'O' ring, washers, gaskets etc flushing out the Nitrogen and vaccumising, recharging the taken out refrigerant gas including testing complete all as directed to AC plants of 4 x 7.5 TR Package type AC plants.
All as per item No. 3.00 above but of cap 3 x 24 TR Central AC plant.
All as per item No. 3.00 above but of cap 2 x 16.5TR Package type AC plant.
All as per item No. 3.00 above but of cap 3 x 11 TR Package type AC plant.
All as per item No. 3.00 above but of cap 3 x 50 TR Central AC plant.
All as per item No. 3.00 above but of cap 1 x 39 TR Central AC plants.
All as per item No. 3.00 above but of cap 3 x 145 TR Central AC plant.
All as per item No. 3.00 above but of cap 3 x 40 TR Central AC plants.
Supply only refrigerant gas R-22 complete all as directed by Engr-in-charge.
Supply only refrigerant gas R-407c complete all as directed by Engr-in-charge.
Supply only refrigerant gas R-134a complete all as directed by Engr-in-charge.
Supply only for NANO paint NP 605 suitable for envirosafe corrosion coating of the AC plants all as specified and directed, of Make PERMAWELD Pvt, Ltd / PSMS (Perfect Salvage & Maintenance Services).
M/s K L M INFRATECH
EXELLENT POWER CORPORATION
S.S.ENGINEERING CORPORATION
Universal refrigeration and Engineering Company
CHAVA CONSTRUCTIONS AND ELECTRICAL PROJECTS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .