Tender Value
₹50 L
EMD Value
₹5 L
Closing Date
10 Apr 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
motijheel kanpur
Construction work of additional shed at the cremation ground located at Siddhanath Ghat.
2026_NNKAN_1132672_1
Tn/10/AA-2/Awasthapana/25-26
Open Tender
Civil Works
Fixed-rate
90 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹5 L
19 Sept 2026
2 Apr 2026
10 Apr 2026
2 Apr 2026
10 Apr 2026
2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation in trenches for foundations pipes cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in a distance of 50 mtr. | - | cum | - | - |
| 2 | Providing and Laying Cement concrete (1:6:12, 1cement: 6 fine sand: 12 Brick ballast nominal size 40 mm ) and curing complete, including cost of formwork in foundation and floors. | 1 | cum | - | - |
| 3 | RCC Work with cement concrete 1:1.5:3,1cement :1.5 coarse sand:3 stone Agregate excluding centring shutring reinforcment etc all completion of work.for /column | 0.8 | cum | - | - |
| 4 | Mild steel or Iron in Reinforcement including all completion of work. | 0.52 | qtls | - | - |
| 5 | Painting or Varnishing on iron Works in small areas or new wood work with one coat of ready mixed priming paint & and two coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&Petc.required for proper completion of the work. | 1 | sqm | - | - |
| 6 | Providing and Laying position Cement concrete (1:2:4, 1 cement: 2 Coarse sand: 4 Stone aggregate size 20 mm ) of specified grsdeb excluding and curing complete, including cost of formwork in foundation and floors. | - | cum | - | - |
| 7 | S/F of M.S tube for fixing of G.S sheet with bolts and welding etc all work with tubular pipe DSR- 10.15.2 | 0.09 | kg | - | - |
| 8 | P/F GS cogurated sheet roofing including vertical / curved surface with polymer coated J and L hooks and nuts 8 mm dia of 1 mm thick zink coating not less than 275 gm/mtr sqm etc all work | - | sqm | - | - |
| 9 | Class - 150 Brick Work in (1:4 ) cement mortar including supply of all Materials Labour and Tool & Plants etc,required for proper completion of the work.for super structure | - | cum | - | - |
| 10 | S/F of PVC pipe of 10cm dia down pipe including all labour work | - | rmt | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.97 MB
ulbt02042026awa.pdf
Tender Documents • 4.58 MB
BOQ_2114108.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .