Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAccepted-AOC | ₹19.0 L | L1 | Accepted-AOC Lowest tenderer |
| 2 | L2₹19.3 LRejected-AOC | ₹19.3 L | L2 | Rejected-AOC Highest tenderer |
| 3 | L2₹19.5 LRejected-AOC PLOT NO 1 510 NO 2 MADHA NAGAR KOVUR CHENNAI 600 128 | KANCHIPURAM | TAMIL NADU | 600128 | ₹19.5 L | L2 | Rejected-AOC Highest tenderer |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | S.S. ENTERPRISES L3 | S.SANTHAKUMAR L2 | M/s. Rajarajan Associates L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils (Including Refilling)
a. 0 to 2m depth | 11 | Cum | 250 ₹2,750 | 240 ₹2,640 Lowest | 250 ₹2,750 |
| 2.00 | Supply and filling in foundation and basement with Stone dust | 27 | Cum | 300 ₹8,100 | 290 ₹7,830 Lowest | 300 ₹8,100 |
| 3.00 | Supply and filling in foundation and basement with gravel | 122 | Cum | 600 ₹73,200 | 490 ₹59,780 Lowest | 500 ₹61,000 |
| 4.00 | Plain cement concrete 1:5:10 (One of cement, five of cs sand and ten of hard broken stone Jelly) for foundation using 40 mm | 26.4 | Cum | 4,500 ₹1,18,800 Lowest | 4,800 ₹1,26,720 | 4,800 ₹1,26,720 |
| 5.00 | Plain cement concrete 1:2:4 (One of cement two of sand and four of Hard Broken Stone jelly) using 20mm | 25.5 | Cum | 6,200 ₹1,58,100 Lowest | 6,500 ₹1,65,750 | 6,500 ₹1,65,750 |
| 6.00 | Supplying and fixing of pre-cast kerb stone of size 450x300x150mm | 48 | Rmt | 300 ₹14,400 | 270 ₹12,960 | 250 ₹12,000 Lowest |
| 7.00 | Providing Form work and centering for reinforced cement concrete works
a. For Column footings, plinth beam, Grade beam, Raft beam, Raft slab etc., | 11.5 | Sqm | 900 ₹10,350 | 800 ₹9,200 Lowest | 900 ₹10,350 |
| 8.00 | Brick work in CM 1:5 (One of cement and five of cs sand) using chamber burnt bricks | 13.3 | Cum | 7,000 ₹93,100 Lowest | 7,000 ₹93,100 Lowest | 7,000 ₹93,100 Lowest |
| 9.00 | Brick partition wall in Cement Mortar 1:4 (One of cement and four of cs sand) 114mm thick
In foundation and basement | 57.8 | Sqm | 900 ₹52,020 | 800 ₹46,240 Lowest | 850 ₹49,130 |
| 10.00 | Plastering the top of flooring in CM 1:4 (One of cement and four of sand) 20mm thick | 16 | Sqm | 500 ₹8,000 Lowest | 500 ₹8,000 Lowest | 600 ₹9,600 |
Tender Value
Refer Docs
EMD Value
₹21,500
Closing Date
1 Jul 2026, 6:00 pmClosed
Executive Engineer/Chennai division-I
No.132, E.V.R.Salai, Kilpauk, Chennai-10
Special Repair works to 14 Nos of SFO quarters at Nungambakkam in Chennai city
2026_TNPHC_682339_1
DB/Ch-I/2068/2026
Open Tender
Civil Works
Lump-sum
90 days
Nungambakkam
Please refer tender documents
7 documents required · 7 mandatory
₹0
₹21,500
9 Jul 2026
22 Jun 2026
3 Jul 2026
22 Jun 2026
1 Jul 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all soils and sub-soils (Including Refilling)
a. 0 to 2m depth | 11 | Cum | 306.97 | ₹3,376.67 |
| 2 | Supply and filling in foundation and basement with Stone dust | 27 | Cum | 372.66 | ₹10,061.82 |
| 3 | Supply and filling in foundation and basement with gravel | 122 | Cum | 613.8 | ₹74,883.6 |
| 4 | Plain cement concrete 1:5:10 (One of cement, five of cs sand and ten of hard broken stone Jelly) for foundation using 40 mm | 26.4 | Cum | 5,794.74 | ₹1,52,981.14 |
| 5 | Plain cement concrete 1:2:4 (One of cement two of sand and four of Hard Broken Stone jelly) using 20mm | 25.5 | Cum | 7,306.17 | ₹1,86,307.34 |
| 6 | Supplying and fixing of pre-cast kerb stone of size 450x300x150mm | 48 | Rmt | 308.43 | ₹14,804.64 |
| 7 | Providing Form work and centering for reinforced cement concrete works
a. For Column footings, plinth beam, Grade beam, Raft beam, Raft slab etc., | 11.5 | Sqm | 1,071.23 | ₹12,319.15 |
| 8 | Brick work in CM 1:5 (One of cement and five of cs sand) using chamber burnt bricks | 13.3 | Cum | 7,487.58 | ₹99,584.81 |
| 9 | Brick partition wall in Cement Mortar 1:4 (One of cement and four of cs sand) 114mm thick
In foundation and basement | 57.8 | Sqm | 960.44 | ₹55,513.43 |
| 10 | Plastering the top of flooring in CM 1:4 (One of cement and four of sand) 20mm thick | 16 | Sqm | 638.26 | ₹10,212.16 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_820132.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_820132.xls
BOQ • 0.27 MB
Nugambakkambooklet.pdf
Tender Documents • 4.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].