Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC VILLAGE VISHUNPURVA POST GANDHI NAGAR DISTRICT BASTI UP | BASTI | BASTI | UTTAR PRADESH | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 Cr+₹8.1 L (5.88%)Rejected-AOC | ₹1.5 Cr+₹8.1 L (5.88%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.6 Cr+₹22.8 L (16.6%)Rejected-Finance | ₹1.6 Cr+₹22.8 L (16.6%) | L3 | Rejected-Finance L3 |
| 4 | L4₹11.2 Cr+₹9.9 Cr (718.0%)Rejected-Finance GRAM TINANHARI POST NATHNAGAR THANA MAHULI DISTRICT SANT KABIR NAGAR | AMROHA | UTTAR PRADESH | 244102 | ₹11.2 Cr+₹9.9 Cr (718.0%) | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹3.9 L
Closing Date
19 Feb 2024, 11:00 amClosed
Superintending Engineer
Superintending Engineer Gandak Flood Circle, Basti.
Anti Erosion and Restoration of stud no. 01 between Km. 1.800 to 2.000 of Supa-Advance Bund on Right bank of Burhi Rapti River in Distt- Siddharthnagar.
2024_UPIDC_894744_24
08/SE/2023-24
Open Tender
Civil Works
Item Wise
90 days
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,614
₹3.9 L
Yes
Superintending Engineer Gandak Flood Circle, Basti
27 Mar 2024
13 Feb 2024
19 Feb 2024
13 Feb 2024
19 Feb 2024
13 Feb 2024
13 Feb 2024
Amount
Earth Work in digging pits for lancing apron and Transit Apron & cutting slope for bank picthing including all lead, Lift, & .etc.
Supplying & Laying OF N.C Size 1x1x1 m mesh size 20x20 cm filled with iocal Sandy Soil/earth in new E.C Bags including cost of N.C,BAGS,SOIL, tying, stiching with machine & dumping in position.
Supplying and Laying of MZP Stone boulder in GI wire crate of size 1.00x1.00x1.00 with mesh size 20x20 cm including all cost of material, labour T& P etc complete per M3
Supplying and Laying of MZP Stone boulder pitching including all cost of material, labour T& P etc complete per M3
Supplying and laying of Geo Sheet made of 200GSM woven multifilament polypropolene yarn and laying below Boulder Pitching with pegs including all cost labour,material,carriage,royalty and T&P etc complete.
Dismantaling and relaying Boulder including cost of labour T&P etc.
Making Temp. Hutment
M/S AJAY CONSTRUCTION COMPANY
M/S JAI MAA SIDDHIDATRI BUILDTECH
SHIVANAND SHUKLA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .