Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.0 LAccepted-AOC GARUI PASCHIM PARA KOLKATA 700065 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700065 | L1 | Accepted-AOC L1 | |
| 2 | L2₹43.1 L+₹12,474.77 (0.29%)Rejected-Finance 82 1 BECHU CHATTERJEE STREET KOLKATA 700009 | KOLKATA | KOLKATA | WEST BENGAL | 700009 | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹43.2 L+₹17,844.17 (0.42%)Rejected-Finance ALAMPUR NODAKHALI | L3 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹87,500
Closing Date
29 Nov 2024, 6:00 pmClosed
Executive Engineer SMD PHE Dte
CHETLA
Providing bamboo structure with decorative LED lighting arrangement and temporary Illumination arrangement at different places including emergency illumination of Road No 2 and Sea Beach area in connection with Ganga Sagar Mela 2025
2024_PHED_766983_5
WBPHE/EE/SMD/NIeT-49 of 2024-25
Open Tender
Electrical Work/ Equipment
Item Rate
45 days
Road No 2
Please refer Tender documents.
7 documents required · 7 mandatory
₹87,500
Yes
2 Apr 2025
14 Nov 2024
2 Dec 2024
14 Nov 2024
29 Nov 2024
14 Nov 2024
Amount
N.B:-All Quoted Rates are inclusive of GST @ 18% + CESS @ 1%
Making gate structure on hire basis of size 9mtr x 18 mtr with salbollah/bamboo post including cutting in suitable size, shape, jointing cross support, vertical support and covering with cloths and making decorative design LED lighting on hire basis with different colour LED and design as per direction of the EIC. The board should have in built power circuit board connected with LED lamp suitable for operating in 230 volt 50Hz AC supply with controller etc and dismantling after completion of Mela.
Fitting fixing of the departmentally supplied LED board of animal picture and road numbering on Salbollah / Bamboo post on hire basis at Road no- 1, 2, 3, 4 and 5 (Sea side & Canal side) including power connection complete with supply of SMPS on hire basis on or before 05.01.2025 and dismantling the same and storage to departmental store as per direction after completion of Mela.B20
Making temporary decorative lighting arrangement by Supply, delivery and fitting fixing at site on hire basis decorative boards size (4ft x 12ft) with different colour LED lamp and design as per direction of the EIC. The board should have power circuit board connected with LED lamp suitable for operating in 230 volt 50Hz AC supply. with controller. The board should be fixed on salbollah/bamboo post structures (heavy) on hire basis at Road No. 2 (near temporary P.H.E Mela office) including construction of the foundation complete with all accessories as per direction and upto the entire satisfection of EIC for the period from 05.01.2025 to 17.01.2025
Supply of decorative LED chain light for pole decoration a on hire basis for 05-01-2025 to 16-01-2025
Supply of 2 x 2.5 sq. mm. and 1 x 1.5 sq. mm. PVC insulated single core copper wire for connection of chain light on hire basis
Supply of 2 x 4 sq. mm. and 1 x 2.5 sq. mm. PVC insulated single core copper wire for main circuit line on hire basis
Labour charges for installation of chain light arrangement for pole decoration as per direction
Supply & installation of hire basis at site of different color flexible type (10 ft x 10 ft) LED net for decoration of D.M Mela office. from 05.01.2025 to 16.01.2025 =6 Nos
Supply & installation of hire basis at site of different color LED spot light for decoration at D.M Bunglow from 05.01.2025 to 16.01.2025
Supply delivery & fitting fixing by necessary arrangement on hire basis different LED par light for decoration of D.M.Mela office from 05-01-2025 to 16-01-2025 as per direction (damaged materials will have to be replaced by the agency at their own cost
Supply delivery & fitting fixing on hire basis SMPS input 230V 50Hz output 12V DC for running the strip LED and LED chhar for 3 nos of Ganga Sagar at D.M.Mela office from 05-01-2025 to 16-01-2025 as per direction (damaged materials will have to be replaced by other.) 10 days
Fitting fixing the street light fixture on exising PCC pole by tower by different feeder line to different pole inside & outside mela ground as per direction of EIC. With supplying on hire basis 400 watt metal halide (Green) lamp with all accessories complete with 7/20 PVC wire for looping arrangement including other materials from 05.01.2025 to 16.01.2025=12 days x 14 nos=168 pts(damaged materials will have to be replaced by the agency at their own cost)400 wall metal halide
Making temporary decorative lighting arrangement by Supply, delivery and fitting fixing at site on hire basis decorative RGB glass size (8ft x dia2ft on base x dia2.5ft on top) with different colour RGB lamp and design as per direction of the EIC. The decorative light should have power circuit (SMPS) board connected with RGB lamp suitable for operating in 230 volt 50Hz AC supply. with controller. The decorative light should be fixed on iron skalleton (heavy) on hire basis at D.M Campus with all accessories as per direction and upto the entire satisfection of EIC for the period from 05.01.2025 to 16.01.2025. [6 sets x 12 days]
Drawing of power line from sub-station to panel by required size cable on hire basis
Installation of power distribution panel board, for power supply from WBSEDCL in different point including electrical inter connection from departmental panel Board to WBSEDCL panel board for LT Distribution line before 31.12.2024 including proper earthing arrangement complete as per direction of EIC
Supply on hire basis 4.88 mtr Long 100 mm dia (AV) bottom bamboo post and erecting the same different places
Drawig of L.T. distribution line on Salbollah / bamboo post by PVC insulated al. wire of suitable size [ 10 to 16 sq mm. from controlling station as per direction of EIC
Drawing of tube light point from nearest feeder line to different places on bamboo post as per direction of EIC with supply on hire basis 40 watt tube light complete set with interconneciton complete from 09.01.2025 to 16.01.2025 =8days x 15 pts
Supply and fitting fixing of 2 PIN 5 amps plug points [for mobile charger] on hire basis from 09.01.2025 to 16.01.2025
Supply and fixing of 18/21/36 watt CFL lamp including supply of necessary materials to complete the work from 09.01.2025 to 16.01.2025 = 8days x 15 pts
Drawing 250 watt HPSV light on salabollah/ existing post with supplying 250 watt Sodium vapour lamp, fixture, wire, lamp etc as required for the work complete on hire basis from 05.01.2025 to 16.01.2025 = 12 days x 15pts
Guarding of the whole installaiton round the clock from 05.01.2025 to 16.01.2025 [1 person/shift x 3 shift]
Sundarbone cottage Drawing of power line from sub-station to panel by required size cable on hire basis
Installation of power distribution panel board, for power supply from WBSEDCL in different point including electrical inter connection from departmental panel Board to WBSEDCL panel board for LT Distribution line before 31.12.2024 including proper earthing arrangement complete as per direction of EIC
Supply on hire basis 4.88 mtr Long 100 mm dia (AV) bottom bamboo post and erecting the same different places
Drawig of L.T. distribution line on Salbollah / bamboo post by PVC insulated al. wire of suitable size [ 10 to 16 sq mm. from controlling station as per direction of EIC
Drawing Halogen light on salabollah/ existing post with supplying 250 watt Sodium vapour lamp, fixture, wire, lamp etc as required for the work complete on hire basis from 05-01-2025 to 16-01-2025 =12 days x 30pts
Guarding of the whole installaiton round the clock from 05.01.2025 to 16.01.2025 [1 person/shift x 3 shift]
Mangrove Cottage Drawing of power line from sub-station to panel by required size cable on hire basis
Installation of power distribution panel board, for power supply from WBSEDCL in different point including electrical inter connection from departmental panel Board to WBSEDCL panel board for LT Distribution line before 31-12-2025 including proper earthing arrangement complete as per direction of EIC
Supply on hire basis 4.88 mtr Long 100 mm dia (AV) bottom bamboo post and erecting the same different places
Drawig of L.T. distribution line on Salbollah / bamboo post by PVC insulated al. wire of suitable size [ 10 to 16 sq mm. from controlling station as per direction of EIC
Drawing 250 watt HPSV light on salabollah/ existing post with supplying 250 watt Sodium vapour lamp, fixture, wire, lamp etc as required for the work complete on hire basis from 05-01-2025 to 16-01-2025 =12 days x 10pts
Guarding of the whole installaiton round the clock from 05.01.2025 to 16.01.2025 [1 person/shift x 3 shift]
K1 to Sreedam More Drawing ceiling light points from different feeder line to different shed at latrine area as directed by EIC with supply on hire 40 watt bulb holder and controlling switch etc on bamboo post where necy. (Damaged materials will have to be replaces by the agency at their own cost) from 05.01.2025 to 16.01.2025 =12 days x 700=8400pts
Fitting fixing of 150 watt LED street light fixture in existing PCC/MS poles at different place of road,on hire basis from 05.01.2025 to16.01.2025 (12 days x 200 fittings per day)
Drawing of L.T distribution line on salbollah/PCC post by PVC insulated aliminum wire of size 16 sq.mm to 50 sq.mm for medium pressure line as per IE rules and ISS by supplying skilled labour and line drawing apparatus etc and all other necessary materials required to complete the work as per direction of EIC.(WIRE FOR drawing distribution line will be upplied deptt)
Fitting fixing the street light fixture on exising PCC pole by tower by different feeder line to different pole inside & outside mela ground as per direction of EIC. With supplying on hire basis 150watt LED flood light including supply on necessary materials on hire basis to complete the work from 03.01.2025 to 16.01.2025 =14 days x 40=560 pts
Emergency Illumination Road No 2 Drawing of L.T distribution line on salbollah/PCC post by PVC insulated aliminum wire of size 16 sq.mm to 50 sq.mm for medium pressure line as per IE rules and ISS by supplying skilled labour and line drawing apparatus etc and all other necessary materials required to complete the work as per direction of EIC.(WIRE FOR drawing distribution line will be upplied deptt)
Fitting fixing the street light fixture on exising PCC pole/ tower from different feeder line to different pole in road No. 2 and sea beach area of mela ground as per direction of EIC. With supplying on hire basis 150 watt LED flood light including supply on necessary materials on hire basis to complete the work from 05.01.2025 to 16.01.2025 =12 days x 50=600 pts
Carrying charges of 2nos 5 KVA and 4 nos 3 KVA UPS from departmental stoe to work site by hired vehicle including loading unloading complete.
Fitting fixing of the UPS in suitable position as decided and connection complete with the existing system as per direction of EIC.
Carrying back of 2nos 5 KVA and 4 nos 3 KVA UPS from departmental work site to departmental store by hired vehicle including loading unloading complete.
Guaring arrangement of the entire system round the clock for the entire mela perion and dismantling the same after completion of mela with storage to departmental store as per direction. from 03.01.2025 to 16.01.2025 [1 person/shift x 3 shift x 4 location]
H. DEY ELECTRIC STORES (BID ID -5761301)
SARKAR ELECTRICAL (BID ID -5761267)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .