| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.3 LAdmitted-Finance MAHOMAJ SHIKOHABAD FIROZABAD UTTAR PRADESH | SHIKOHABAD | FIROZABAD | UTTAR PRADESH | -11.75% | ₹25.3 L | L1 | Admitted-Finance |
| 2 | L2₹28.6 L+₹3.3 L (13.0%)Admitted-Finance | -0.25% | ₹28.6 L+₹3.3 L (13.0%) | L2 | Admitted-Finance |
| 3 | L3₹28.6 L+₹3.4 L (13.3%)Admitted-Finance | -0.01% | ₹28.6 L+₹3.4 L (13.3%) | L3 | Admitted-Finance |
Tender Value
₹28.8 L
EMD Value
₹2.9 L
Closing Date
20 May 2026, 4:00 pmClosed
DDC Agra
Sikandra Agra
Construction of Link Road Naurangpur Suresh Rajput house to Firozpur wali Sadak
2026_RKUMP_1145884_4
Retender_216_dt_05.05.2026
Open Tender
Civil Works
Percentage
210 days
DDC Agra
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,100
DDC Mandi Parishad
₹2.9 L
11 Jun 2026
6 May 2026
21 May 2026
7 May 2026
20 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hume Pipe- E.W in Excavation in foundation trenches in ordinary soil( loam, clay or sand ) I/C ligt up to l.50m lead up to 30m & I/C filling, watering & ramming of excavated earth in to trenches or in to the space between trenches or in to the plinth and removal and disposal of Surplus earth as directed by the engineer in charge up to a distance of 30m from the foundation trenches.( Chapter_4_Item_1) | 3.84 | M3 | 135 | ₹518.4 |
| 2 | Providing and Laying cement concrete 1:6:12 (1 cement :6 coarse sand : 12 graded stone aggregate 40mm nominal size) and curing complete including cost of from work in found ation & floors. (Fine sand not less than in 1.25 FM) (Chapter_5_Item_1FZB) | 0.72 | M3 | 4,200 | ₹3,024 |
| 3 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in Foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (Chapter_6_Item_2) | 3.02 | M3 | 5,350 | ₹16,157 |
| 4 | 12mm thick Cement plaster in single coat on fair side of single or half brick wall interior plastering upto floor two level including internal rounded angle schamfers, and rounded angles not exceeding 80mm in grit hand finished even and smooth. 1 Cement : 4 coarse sand. (Chapter_13_item_1) | 12 | SQM | 185 | ₹2,220 |
| 5 | Providing and laying cement Concrete in 1:2:4 of not less than strength of M15 stone ballast (40mm. normal size) approved coarse sand and cement, curing complete, including cost of form work in foundation and floors. But with 2cm Nominal size stone gritin stead of 4cm stone ballast. (Chapter_5_item_6) | 0.07 | M3 | 6,500 | ₹455 |
| 6 | Laying and fixing of 350mm dia N.P.-3 Hume pipe (Socket Hume pipe) including cost of Material etc in proper position as directed by E/I including cartage of pipes/collars upto 100km distance including cost of pipes etc (AOR) | 7.5 | RM | 1,676 | ₹12,570 |
| 7 | Providing & fixing & Hosting of Reflective Signs with a corrosion resistant 4mm thick aluminium compsite panel face to be fully covered with sheeting type IV as per IRC-67:2010 retro reflective sheeting with MS angle frame of 35x35x5mm of MS pole 100mm dia meter with wall thickness of 7.1mm weighing 20kg/m as per drawing even as per the colouring scheme as show in the drawing. (Rate Sanction as per Estimate) | 1 | NO | 13,634 | ₹13,634 |
| 8 | Maintenance of bituminous surface road and gravel or WBM road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop standing tree at adjacent to road wherever cutting of branches of tree, shurb and trimming of grass and weeds etc mentioned in GO No. 55 12022 /187/23-9-2022-02 Nabard / 2021 Dt 28.04.20022 & Enc lettere no 14 BDD-1 (NH)/40 MT-11/ 2024dated 03.01.2024 subjected to approval from Govt. Maintainance of first Year (@ 0.00% of Total Work Amount of PC + Hume Pipe Area) | 48,578.4 | Job | - | - |
| 9 | Maintainance of Second Year (@ 0.75% of Total Work Amount of PC + Hume Pipe Area) | 48,578.4 | Job | 0.01 | ₹364.34 |
| 10 | Maintainance of Third Year(@1.50% of Total Work Amount of PC + Hume Pipe Area) | 48,578.4 | Job | 0.02 | ₹728.68 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.60 MB
BOQ_2142447.xls
BOQ • 0.37 MB
6_Naurangpur_2026.pdf
Tender Documents • 6.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .