| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance VILLAGE VISHUNPURVA POST GANDHI NAGAR DISTRICT BASTI UP | BASTI | BASTI | UTTAR PRADESH | L1 | Admitted-Finance | |
| 2 | L2₹1.3 Cr+₹4.8 L (3.81%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.4 Cr+₹16.7 L (13.3%)Admitted-Finance 00 0 FATEHPUR NEAR SAHARA FARM BAKKAS LUCKNOW LUCKNOW UTTAR PRADESH 226002 | LUCKNOW | UTTAR PRADESH | 226002 | L3 | Admitted-Finance | |
| 4 | L4₹1.4 Cr+₹17.4 L (13.9%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹1.4 Cr+₹17.8 L (14.2%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S ARYA ENTERPRISES L3 | M/S AMRENDRA KUMAR CONTRACTOR L2 | RAM NARAYAN YADAV L4 | KUSUM ENTERPRISES L5 | M/s Akhilesh Kumar Shukla Contractor L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Establishment Cost E/W in excavation in foundation and filling on required places including proper levelling, dressing, manul compaction and T&P etc. | 277.66 | M³ | 196 ₹54,421.36 | 179.62 ₹49,874.51 Lowest | 197 ₹54,699.02 | 197.25 ₹54,768.44 | 190 ₹52,755.4 |
| 2.00 | Supplying & Laying P.C.C. 1:4:8 with 20 mm to 40 mm size Dalla grit and morang sand not less than 2.0 F.M. including cost of all material labour and T&P etc. | 26.76 | M³ | 9,510 ₹2,54,487.6 | 8,611 ₹2,30,430.43 Lowest | 9,512 ₹2,54,541.12 | 9,512.75 ₹2,54,561.19 | 9,500 ₹2,54,220 |
| 3.00 | Supplying and Laying of R.C.C (1:1.5:3) with stone grit and coarse sand including cost of all materials, labour, T&P etc. | 144.65 | M³ | 11,650 ₹16,85,172.5 | 10,563.43 ₹15,28,000.37 Lowest | 11,660 ₹16,86,619 | 11,658 ₹16,86,329.7 | 12,000 ₹17,35,800 |
| 4.00 | Supplying and laying of Steel reinforcement including cutting ,bending, binding&placing in position at site. including cost of all materials, labours, T&P etc. | 4.21 | MT | 74,050 ₹3,11,750.5 | 67,037.88 ₹2,82,229.45 Lowest | 74,061 ₹3,11,796.81 | 74,060 ₹3,11,792.6 | 74,000 ₹3,11,540 |
| 5.00 | Centering and shuttering for P.C.C.in foundation and porcupine including cost of all materials , Labours T& P | 506.07 | M² | 208 ₹1,05,262.56 | 190.05 ₹96,178.6 Lowest | 209 ₹1,05,768.63 | 209.5 ₹1,06,021.66 | 210 ₹1,06,274.7 |
| 6.00 | Making / construction of coffer bund and earthen approach road by cartage earth of 2.00 mtr dia including cost of all materials , Labours , T&P etc. | 12,252.88 | M³ | 210 ₹25,73,104.8 | 199.1 ₹24,39,548.41 | 215 ₹26,34,369.2 | 217 ₹26,58,874.96 | 110 ₹13,47,816.8 Lowest |
| 7.00 | Hiring of diesel pump 5 H.P including running by operator with fuel and all acessories like suction pipe and delivery pipe.for surface water lifting. | 340 | Hrs | 188 ₹63,920 | 171.95 ₹58,463 Lowest | 189 ₹64,260 | 189.5 ₹64,430 | 190 ₹64,600 |
| 8.00 | Supplying and Laying graded filter with Dala stone grit 12.50 mm - 20 mm.including cost of all materials, labours, T&P etc. | 15.12 | M³ | 5,825 ₹88,074 | 5,279.53 ₹79,826.43 Lowest | 5,827 ₹88,104.24 | 5,829 ₹88,134.48 | 5,500 ₹83,160 |
| 9.00 | Supplying and Laying graded filter with coarse sand FM not less than 2 .including cost of all materials, labours, T&P etc. | 15.27 | M³ | 5,415 ₹82,687.05 | 4,902.96 ₹74,868.13 Lowest | 5,416 ₹82,702.32 | 5,417 ₹82,717.59 | 5,400 ₹82,458 |
| 10.00 | Construction of 5 Nos store E/W in excavation in foundation and filling on required places including proper levelling, dressing, mannul compaction and T&P etc. | 318.85 | M³ | 195 ₹62,175.75 | 179.62 ₹57,273.24 Lowest | 196 ₹62,494.6 | 197 ₹62,813.45 | 190 ₹60,581.5 |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
10 Jul 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
SE I and P WR Circle, Govindpur, Prayagraj
As per Tender Notice LOT-2
2026_UPIDC_1160785_6
01 / S.E./2026-27
Open Tender
Civil Works
Item Rate
prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.9 L
19 Aug 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Establishment Cost E/W in excavation in foundation and filling on required places including proper levelling, dressing, manul compaction and T&P etc. | 277.66 | M³ | - | - |
| 2 | Supplying & Laying P.C.C. 1:4:8 with 20 mm to 40 mm size Dalla grit and morang sand not less than 2.0 F.M. including cost of all material labour and T&P etc. | 26.76 | M³ | - | - |
| 3 | Supplying and Laying of R.C.C (1:1.5:3) with stone grit and coarse sand including cost of all materials, labour, T&P etc. | 144.65 | M³ | - | - |
| 4 | Supplying and laying of Steel reinforcement including cutting ,bending, binding&placing in position at site. including cost of all materials, labours, T&P etc. | 4.21 | MT | - | - |
| 5 | Centering and shuttering for P.C.C.in foundation and porcupine including cost of all materials , Labours T& P | 506.07 | M² | - | - |
| 6 | Making / construction of coffer bund and earthen approach road by cartage earth of 2.00 mtr dia including cost of all materials , Labours , T&P etc. | 12,252.88 | M³ | - | - |
| 7 | Hiring of diesel pump 5 H.P including running by operator with fuel and all acessories like suction pipe and delivery pipe.for surface water lifting. | 340 | Hrs | - | - |
| 8 | Supplying and Laying graded filter with Dala stone grit 12.50 mm - 20 mm.including cost of all materials, labours, T&P etc. | 15.12 | M³ | - | - |
| 9 | Supplying and Laying graded filter with coarse sand FM not less than 2 .including cost of all materials, labours, T&P etc. | 15.27 | M³ | - | - |
| 10 | Construction of 5 Nos store E/W in excavation in foundation and filling on required places including proper levelling, dressing, mannul compaction and T&P etc. | - | M³ | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.42 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
Document2.pdf
Tender Documents • 2.94 MB
BOQ_2186409.xls
BOQ • 0.33 MB
Suddhipatra372026.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .