| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 CrAccepted-AOC | ₹22.9 Cr | L1 | Accepted-AOC A |
| 2 | L2₹25.5 CrRejected-Finance | ₹25.5 Cr | L2 | Rejected-Finance R |
| 3 | Rejected-Technical R O TILAKHURA TO JHALALBURUA LINK ROAD | - | - | Rejected-Technical Rejected by Member Committee |
| 4 | Rejected-Technical MOHSINPUR MANSURPUR AKBARPUR AMBEDKAR NAGAR | - | - | Rejected-Technical Rejected by Member Committee |
Tender Value
₹22 Cr
EMD Value
₹33 L
Closing Date
11 Mar 2024, 12:00 pmClosed
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
WIDENING AND STRENGTHENING OF BANKATIYA PACHPOKHARI ROAD (ODR) ROAD IN DISTRICT-SANTKABIR NAGAR
2024_CEUBZ_899408_1
583/4E-NIVIDA-BASTI CIRCLE/23-24 DATED-02-02-2024
Open Tender
Civil Works
450 days
BASTI
AS PER SBD
2 documents required · 2 mandatory
₹2,714
Yes
₹33 L
20 Mar 2024
17 Feb 2024
11 Mar 2024
17 Feb 2024
11 Mar 2024
17 Feb 2024
17 Feb 2024 - 24 Feb 2024
Amount
Earth work in embankment in ordinary soil ( loam clay or sand) of apporach road mechnically compacted to 97% standared proctor density at omc including breaking of clods pulverising dressing the earth to required level and slopes and in layer not more than 20cm and compacted with power road roller in each layers.Earth shall be excavated from out side of apporoch slopes and pit not exceeding 50cm in depth including all leads and lifts of earth and charges of watering and hire and fule charges of road roller, all labour T&P etc required for proper completion of work and also including one lift Carted upto 2km distance. Complete in all respects as Per direction of Ergineer-In-Charge..
Earth work in embankment in ordinary soil ( loam clay or sand) of apporach road mechnically compacted to 97% standared proctor density at omc including breaking of clods pulverising dressing the earth to required level and slopes and in layer not more than 20cm and compacted with power road roller in each layers.Earth shall be excavated from out side of apporoch slopes and pit not exceeding 50cm in depth including all leads and lifts of earth and charges of watering and hire and fule charges of road roller, all labour T&P etc required for proper completion of work Complete in all respects as Per direction of Ergineer-In-Charge
Excvation of fouandation in ordainary soil in making trenches to widening the existing road in 7.00 mtr width in proper alingments including lift up to 1.50 mtr and lead up to 30.00 mtr and including filling watering and ramming, excavated earth into trenches or in the side of embankment and removal & disposal of surplus earth as directed by incharge up to adistance of 30.00 mtr from the trenches in widening portion. Complete in all respects as Per direction of Ergineer-In-Charge
Providing & laying of Granular Sub-Base by providing welll graded material, from approved quarry spreading in uniform layer with motor grader on prepaired surface mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired complete as per T.S. specification clasuse 401 for grading1 material.(in widening portion) Complete in all respects as Per direction of Ergineer-In-Charge
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC with 1% cement opc & 3.5% emulsion in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Complete in all respects as Per direction of Ergineer-In-Charge
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.as Per direction of Ergineer-In-Charge
Providing and applying Tack coat with bitumen VG-10 @ 0.30 kg per sqm. on the prepared bituminous/ granular surface cleaned with hand broom. including all type of labour, T&P etc complete for proper completion of the work. For B.C. Complete in all respects as Per direction of Ergineer-In-Charge
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 Complete in all respects as Per direction of Ergineer-In-Charge
Providing, laying, spreading and compacting stone aggregate from approved quarry to Wet Mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site laying in uniform layer with paver in sub-basae/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORTH specification 406. FOR CC Portion Complete in all respects as Per direction of Ergineer-In-Charge
Construction of Un-reinforced dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork( steel channel, laying and fixing of 125 micron thick polthene film, wedges steel plates including levelling the formwork as per drawing), spreading the concrete with showel, rakes, compacted using needle,screed and plate vibrators and finished in continous operation including provision of contraction and expansion ,construcion joint.Applying debonding strip, primer, sealant, Dowel bars, near approaches to Bridges/ culvert and construction joints admixture as approved, curing of concrete slabs for 14 days . As per IS no. 1500(6.4) Complete in all respects as Per direction of Ergineer-In-Charge
Earth work in cutting or filling in pattri in ordinary soil (Loam, Clay or Sand) excavation to be in the form of pit not exceeding 50cm in depth and embankment to be 20cm layers including the spreading grading to required levels slopes and compacted to meet requirement of table 300.2 and also including 1.50 m lift and 30.0m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30.0 mtr distance as directed by the Engineer in charge and mechnicaly compaction.carted up to 2 km distance Complete in all respects as Per direction of Ergineer-In-Charge
Construction of 600 mm Dia & 1000 mm Dia RCC Hume pipe Culvert.Excavation of foundation in ordinary soil (Loam, Clay, or Sand) including 1.5 m lift and lead upto 30 m and including filling watering and ramming of excavated earth into the trench or into the space between the building and the sides of the foundation or as per direction of E/I. Complete in all respects as Per direction of Ergineer-In-Charge
C.C. with 40 mm gauge Stone ballast, sand of 1.25 FM & Cement in the proportion of 6:3:1 including supply of all materials labour T&P etc. complete required for proper completion of the work as per S.I. No. 280 Complete in all respects as Per direction of Ergineer-In-Charge
Supply of NP - 3 Class RCC Hume pipe. Including with 15% Cartage 1000 mm Dia Complete in all respects as Per direction of Ergineer-In-Charge
Supply of NP - 3 Class RCC Hume pipe. Including with 15% Cartage 600 mm Dia Complete in all respects as Per direction of Ergineer-In-Charge
Laying and jointing R.C.C hume pipe 1000 mm Dai ang giving proper slope & alignment as required for proper completion of work. Complete in all respects as Per direction of Ergineer-In-Charge
Laying and jointing R.C.C hume pipe 600 mm Dia ang giving proper slope & alignment as required for proper completion of work. Complete in all respects as Per direction of Ergineer-In-Charge
Class 150 A Bricks in 1:3 Cement & Course sand of 1.25 FM Mortar in foundation and plinth including all materials labour T&P etc. complete as per required for proper completion of the work as per S.I. No. 305. Complete in all respects as Per direction of Ergineer-In-Charge
Same as Above but Super Structure Complete in all respects as Per direction of Ergineer-In-Charge
Struck pointing with 1:2 cement & F/sand mortar on bricks work I/C raking the joints washing & cleaning and supply of all material labour T&P etc. complete as per required for proper completion of the work as per S.I. No. 574 Complete in all respects as Per direction of Ergineer-In-Charge
Construction of Retaining Wall Earth work in excavation in foundation as per S.I. No. 251 Complete in all respects as Per direction of Ergineer-In-Charge
Concrete with 40 mm gauge Stone ballast, fine sand of 1.25 F.M. and cement in the proportion of 6:3:1 as per S.I. No. 280 Complete in all respects as Per direction of Ergineer-In-Charge
( M-25) R.C.C. work for raft foundation with cement approved course sand & 2CM gauge approved dalla grit porportion of 1:1.5:3 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24BWGGI binding wire complete in all respect Complete in all respects as Per direction of Ergineer-In-Charge
Mild Steel or iron work in plain work such as R.C.C.or R.B. work complete in all respect. Complete in all respects as Per direction of Ergineer-In-Charge
Construction of Drain In Abadi Portion Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with Complete in all respects as Per direction of Ergineer-In-Charge
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Complete in all respects as Per direction of Ergineer-In-Charge
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade (M-20) Complete in all respects as Per direction of Ergineer-In-Charge
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications Complete in all respects as Per direction of Ergineer-In-Charge
Construction of 1x6 m Span R.C.C Culvert Dewatering of water trenches during excavation,concreting,masonary work upto sub soil/Water level including hire charges of 5 H.P Pump. Complete in all respects as Per direction of Ergineer-In-Charge
Excavation in foundation in ordinary soial, Loam or clay sand including lift up to 1.5 meter & elead up to 30.00 meter complete as reqired for proper completion of work. Complete in all respects as Per direction of Ergineer-In-Charge
Concrete foundation with 40mm gauge stone ballast with approve coarse sand and cement in proportion of 1:3:6 including all materials, Labour T & P etc cComplete in all respects as Per direction of Ergineer-In-Charge
Brick masonary work in 1:3 sub-structure complete excluding pointing and plastering as per drawing and technical specification. Complete in all respects as Per direction of Ergineer-In-Charge
Same as above but in super structure Complete in all respects as Per direction of Ergineer-In-Charge
RCC work with cement & approve coarse sand, 20mm gauge stone ballast in the proportion of 1:1:2 (M-25) in bed block excluding S/O reinforcement but including its fixing in position and binding the same with 24 mm gauge binding wire and also including porviding and fixing necessary centring and shuttering and ets removal after completion of work and supply of all other matterial, labour T & P etc complete Complete in all respects as Per direction of Ergineer-In-Charge
Mild steel or iron work in plain work such as rainforcement concrete on or rainforcement B/W (when not including in overall rates) wrought to reqd. shape as nacessary in bending for the proper completion of work and including supply of steel and its wastage etc and all labour T & P etc required for proper completion of work. Complete in all respects as Per direction of Ergineer-In-Charge
Struck cement pointing on brick work with cement & approved fine sand in proportion 1:3 I/C raking the joints washing and cleaning and S/O all material, labour and T &P etc. Complete in all respects as Per direction of Ergineer-In-Charge
M/s Progressive Construction Company
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf