Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.5 LAccepted-Finance | ₹21.5 L | L1 | Accepted-Finance L1 LOWEST |
| 2 | L2₹21.8 L+₹25,872.13 (1.20%)Accepted-Finance | ₹21.8 L+₹25,872.13 (1.20%) | L2 | Accepted-Finance L2 LOWEST |
| 3 | L3₹21.9 L+₹36,652.19 (1.70%)Accepted-Finance | ₹21.9 L+₹36,652.19 (1.70%) | L3 | Accepted-Finance L3 LOWEST |
Tender Value
₹21.6 L
EMD Value
₹43,120
Closing Date
1 Jul 2026, 5:00 pmClosed
Executive Officer
NP Bisanda Bujurg
CONSTRUCTION OF RETAINING WALL IN SOUTH SIDE OF LOHRWA TALAB BISANDA
2026_DOLBU_1162802_1
516/Nirman/NPBisanda/2026-27 Date 22-06-2026
Open Tender
Civil Works
Percentage
NP Bisandabujurg
Please Refer Tender Dacument
2 documents required · 2 mandatory
₹2,544
Executive Officer
₹43,120
16 Jul 2026
23 Jun 2026
2 Jul 2026
23 Jun 2026
1 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in B/C Soil including lift up to 1.5 m and lead upto 30m t&p etc all complete | 720 | CUM | 120 | ₹86,400 |
| 2 | Earth work fillingby t/t cartage upto 5km. From site t&p etc. all complete . (s.i. no. 251 chapt. No. 4 page no 23 ) | 320.08 | CUM | 268.5 | ₹85,941.48 |
| 3 | 25% Disposal of malwa upto 5km. From site | 180.02 | QTL | 183.5 | ₹33,033.67 |
| 4 | BORING FOR PILES 30CM DIA & 3.50MTR DEPTH
(page no.24) | 58 | No | 820 | ₹47,560 |
| 5 | Sand filling in plinth and under floor including supply of necessary quantity of sand from a distance not exceeding 8 Kms. from the site of work and including watering, dressing etc. labour and T&P etc. | 15.48 | CUM | 1,546.09 | ₹23,933.47 |
| 6 | supply & laying of p.c.c. 1:6:12 | 11.35 | CUM | 4,959.13 | ₹56,286.13 |
| 7 | R.C.C Work cement approved cource sand and 2cm (3/4) gauge approved stone ballast in the proporation 1:1.5:3 in for edingwork t&p etc all | 130.01 | CUM | 7,900.94 | ₹10,27,201.21 |
| 8 | mild steel of iron work such as rainforcement concrete work (which not including all over rates) wrought to required shape as cnecessary including bending supply of steel its wastage and hooks and outhorized overlapping shall be measured | 10,205.94 | KG | 77.96 | ₹7,95,655.08 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
NIT8.pdf
Tender Documents • 0.80 MB
BOQ_2179620.xls
BOQ • 0.29 MB
RevisedDate.pdf
PDF • 0.23 MB
NIT8.pdf
PDF • 0.81 MB
NIT8.pdf
PDF • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .