Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 LAccepted-AOC BHAGWATI NAGAR JAMMU | 1 | Accepted-AOC L1 | |
| 2 | 2₹1.4 L+₹6,270 (4.75%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹1.4 L+₹12,000 (9.10%)Rejected-AOC 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | 3 | Rejected-AOC L3 |
Tender Value
Refer Docs
Closing Date
26 Jul 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowsh
Repairs to 63 KVA voltage stabilizer at LIS Lower Manda, Repairs to 4cusec discharge HC pump no. 01 at LIS Patyari ,Replacement of overheated/burnt out 400 sq. mm single core unarmoured aluminium cable with allied works at LIS Manda Ist.
2022_IFC_179632_1
36/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
7 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
Exempted
Office of the Executive Engineer MID Akhnoor/Nowsh
21 Sept 2022
18 Jul 2022
27 Jul 2022
18 Jul 2022
26 Jul 2022
21 Jul 2022
19 Jul 2022
Repairs to 63 KVA voltage stabilizer at LIS Lower Manda. The job involves disconnecting of the Voltage stabilizer from the main power supply (Incoming and Outgoing cables) . Loading the voltage stabilizer in the vehicle by using crane and suitable tools and tackle and shifting the voltage stabilizer to workshop. Opening and removing of the panel, loosening /dismantling of the top cover, nut and bolts. Lifting of inside transformer assembly with the chain pulley block for extraction of the complete unit. Dismantling/Extraction of the coils . Thereafter dismantling of the core assembly and extraction of the burnt copper wire with the help of manual labour and suitable tools/tackles. Rewinding of 2 coils using new copper wire of the superior quality and then complete insulating and varnishing of coils . Assembling of the coils to make it a complete unit. Replacement of the rotor assembly (1 no.) by way of p/f of new components, replacing all the damaged /burnt components. Boiling of the T.oil in stabilizer by draining it out of the tank. Heating with heater coils to make it completely moisture free, filling it back after complete cleaning and drying of tank. Reinstallation of the stabilizer frame with transformer assembly. Lowering of complete unit in tank after p/f of shock proof gasket and body with nuts/bolts . Shifting the voltage stabilizer to LIS and unloading of the voltage stabilizer at site by using crane Connecting power cables by p/f of new thimbles of the requisite capacity and testing on load . Complete job includes the cost of material, labour charges, transportation charges, hiring charges of tools / tackles required at site. Complete Job
Repairs to 4 cusec discharge HC Pump no. 01 installed at LIS Patyari . The Job involves decoupling & dismantling of pump for the purpose of its repair . Taking out impeller shaft assembly and Shifting of the pump shaft assembly by manual / mechanical means to workshop. Separating shaft, impeller and bushes. Repair to key ways . Rebuilding of impeller by using good quality electrodes. Repairs to pump shaft at damaged spots by using good quality electrodes. Turning/machining of impeller and pump shaft for proper size . Providing/fabrication of one no. sleeve as per sample. Making necessary repairs to bearing housing. P/F of new set of bearings ( 3308 and 3309) as per sample. Assembling of the pump parts. Carriage / transportation of the impeller shaft assembly back from workshop to the site of installation at LIS. Fitment of pump along with replacement of rusted / damaged studs, gaskets, alignment setting at its position, p/f of gland packing, greasing work etc. Aligning & coupling the pump & motor. Complete testing of the pumping unit on full load. Job includes cost of all material, transportation charges, head load and labour charges for skilled/semiskilled labour, hire charges for tools & tackles. Complete Job
Replacement of overheated/burnt out 400 sqmm single core unarmoured aluminium cable at LIS Manda Ist. The job involves disconnecting the power supply and thereafter disconnecting of damaged aluminum cable 400mm2 single core from the pole no. 02 to main switch by using skilled labour and suitable tool/tackles. The job includes replacement of 400mm2 single core from aluminium cable from from the pole no. 02 to main switch ( 22 mtrs.) by providing/laying of new 400 mm2 single core aluminium cable ( 22 mtr. approx. ) of any reputed make conforming to relevant ISO/ISI standards. The job also involves replacement of damaged/ burnt thimbles and providing and fitting of new thimbles of suitable size properly crimped and taped . Complete job includes the cost of cable and allied material, transportation charges, fitting and skilled labour charges at the site of LIS complete Complete Job
Replacement by way of of damaged 70 mm2 copper cable ( 7 mtrs.) from voltage stabilizer to protection panel at LIS Manda Ist . The job involves disconnecting the power supply and thereafter disconnecting of overheated copper cable single core from voltage stabilizer to protection panel by using skilled technicians & suitable tools & tackles . The job includes providing/fitting of new 70 mm2 copper cable ( 7 mtrs.) of any reputed make conforming to relevant ISO/ISI standards. The job also involves replacement of damaged/ burnt thimbles and providing and fitting of new thimbles of suitable size properly crimped and taped . Complete job includes the cost of cable and allied material, transportation charges, fitting and skilled labour charges at the site of LIS Complete Job.
a) Providing/fitting of tyre ( 19 no.) for coupling in lieu of damaged tyre along with new nuts & bolts at LIS Manda Ist. b) The job also includes providing /fitting of 2 nos. 20 W LED bulbs and 9 W LED – 6 nos. including the holders along with 1.5 sq mm copper cable for wiring 20 mtrs ,PVC batten ( 15 mtrs approx.) ,batten holders, modular boxes ( 4 nos.). .
M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS
NATIONAL ELECTRO-MECH COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .