| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81,330Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹84,180+₹2,850 (3.50%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.2 L+₹37,070 (45.6%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹1.3 L+₹46,660 (57.4%)Rejected-AOC 3 605 G F 105 SECTOR 3 VASUNDHARA GHAZIABAD UTTAR PRADESH 201012 | GHAZIABAD | UTTAR PRADESH | 201012 | L4 | Rejected-AOC L4 |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
27 Mar 2020, 3:00 pmClosed
SUPERINTENDING ENGINEER EUDC-II GHAZIABAD
33/11 KV S/S KALA PATHAR, INDIRAPURAM, GHAZIABAD
Replacement of LT AB Cable and installation of 3 Phase Distribution box under EUDD XI Khoda.
2020_PVVNL_445466_1
39/W/2019-20/D-XI/EUDC-II/GZB
Open Tender
Electrical Works
Item Rate
90 days
Under EUDD XI Khoda.
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SUPERINTENDING ENGINEER EUDC-II GHAZIABAD
₹2,000
Yes
8 Oct 2020
7 Mar 2020
28 Mar 2020
7 Mar 2020
27 Mar 2020
7 Mar 2020
Amount
fo|qr uxjh; forj.k e.My&f}rh;] xkft;kckn ds vUrxZr fo|qr uxjh; forj.k [k.M&X;kjg] xkft;kckn ds dk;Z{ks= lfpu fogkj o dyk ,Udyso esa {kfrxzLr ,y0Vh0 ,0ch0 dsfcy mrkjdj ubZ ,y0Vh0 ,0ch0 dsfcy Mkyuk o fofHkUu LFkkuksa ij Fkzh Qsl forj.k ckWDl LFkkfir djus dk dk;Z vkj0 ,.M vkj0 en esa ckg~; ,tsUlh ds ek/;e ls djk;k tkukA
Carriage of 02 No. PCC Pole, 02 No. Distribution Box and other material from store centre Ghaziabad/ Sahibabad/JE Store to site of work including loading and unloading at both ends.
Carrige of ABC 3x120+1x195+1x16 mm2 Cable from store Center Ghaziabad /Sahibabad /JE store to site of work including loading and unloading at both end.
Single Pole Erection, Grouting & Foundation of Pole Structure 8.5 meter long PCC pole including the work of complete H.T. fittings as per RESPO manual and required for proper completion of work.
Laying sagging stringing etc of ABC 3x120+1x195+1x16 mm2 Cable on the existing/newly erected pole as per RESPO manual and required for proper completion of work.
Providing and fixing of suspension/ holding Clamp made of MS Flat size 50X6mm suitable for pole as per RESSPO specification.
Fixing LT distribution box 1/3 phase as per RESPO Specification.
Providing and fixing of MS bolt & Nuts of size (16X150mm ,4”X1/2” Ench,1.5”X1/2” Ench,1”X1/2” Ench )with 2No Bolts & Nuts size 16X100mm & off size half threaded of good quality.
Installation and fixing of distribution box on pole with the connections of consumers and main connections as required.
Providing and fixing of Pircing Clamp as per RESSPO specification
Removal and reconnection of old damaged/existing ABC and service cable from junction box.
Carriage of old damaged ABC and other line material from site to store center including loading and unloading at both ends.
R. P. T. Electrical
MITTAL BROTHERS
Singh Heavy Electricals
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .