Tender Value
₹43.9 L
EMD Value
₹45,000
Closing Date
21 Jul 2020, 3:00 pmClosed
The Project Director
The Project Director DRDA vellore
Renovation of 7 no of Ponds/Ooranies,Kulam/Kuttai in K.V.kuppam Block of Vellore District under Renovation of Rural Water Bodies SFC Grant 2019-20 Package No 73.
2020_RDTN_171253_1
A9/3844/2020
Open Tender
Civil Works - Others
Item Rate
180 days
DRDA vellore
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹45,000
3 Aug 2020
14 Jul 2020
21 Jul 2020
14 Jul 2020
21 Jul 2020
14 Jul 2020
Amount
1. Improvements to nallathaneer kulam at pasumathur village in pasumathur panchayat (survey no 205/2)
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Sub estimate for bathing ghats
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Brick work in cement mortar 1:5 mix using country bricks including curing in all labor charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance etc complete
2.Improvement to Nethaji Kulam in Latheri panchayat (survey no 211)
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earth work depolying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
Sub estimate for bathing ghats
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Brick work in cement mortar 1:5 mix using country bricks including curing in all labor charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance etc complete
3. Improvements to AD colony kuttai in thondanthulasi panchayat (survey no 136)
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Sub estimate for bathing ghats
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Brick work in cement mortar 1:5 mix using country bricks including curing in all labor charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance etc complete
Sub estimate for Baby Pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Sub estimate for Silt Trap
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
4. Improvement to raja thopu kulam in senji panchayat (survey no 233)
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earthwork deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
Sub estimate for bathing ghats
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Brick work in cement mortar 1:5 mix using country bricks including curing in all labor charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance etc complete
Sub estimate for Baby Pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Sub estimate for Silt Trap
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
5. Improvement to raja thopu kulam in senji panchayat (survey no 573)
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earthwork deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
Sub estimate for bathing ghats
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Brick work in cement mortar 1:5 mix using country bricks including curing in all labor charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance etc complete
Sub estimate for Baby Pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Sub estimate for Silt Trap
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
6.Improvement to ramar kulam in arumbakkam panchayat (survey no 189)
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earthwork deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
Sub estimate for bathing ghats
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Brick work in cement mortar 1:5 mix using country bricks including curing in all labor charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance etc complete
Sub estimate for Baby Pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Sub estimate for Silt Trap
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
7. Improvement to mailar thippai kulam in senji panchayat (survey no 52)
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earthwork deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
Sub estimate for bathing ghats
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Brick work in cement mortar 1:5 mix using country bricks including curing in all labor charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance etc complete
Sub estimate for Revetment
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Random Rubble masonry in CM 1:5 mix with simultaneous pointing including cost and conveyance etc complete
Rough stone dry packing for aprons and revetments including cost and conveyance etc complete
Pointing with cement mortar 1:3 flush pointing for brick work including cost and conveyance etc complete
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
D VASANTHY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .