Tender Value
₹7.6 L
EMD Value
₹75,584
Closing Date
9 Oct 2026, 3:00 pmClosed
Chief Engineer
Office Motijheel Nagar Nigam Kanpur
Work of putting security net and tin shed in the premises of Sarvakameshwar Dham Shiv Mandir Park in Mohalla Kalyanpur Kala under Zone 6 Ward 35 Kalyanpur North.
2026_NNKAN_1179561_2
308/AA-6/2026-27
Open Tender
Civil Works
Fixed-rate
Ward 35
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹75,584
16 Oct 2026
28 Sept 2026
9 Oct 2026
28 Sept 2026
9 Oct 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
excavated soil and disposal of surplus excavated soil directed, within a lead of 50 m including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil. | 4.22 | cum | 215 | ₹907.03 |
| 2 | Concrete/R.C.C. Work-4.1.8 Providing and laying In position cement concrete of specified grade excluding the cost of centering FS5005 and shuttering - All work up to plinth level 1:4:8 (1 Cement: 4 coarse sand (zone-III): 8 graded stone aggregate 40 mm (nominal size)-Rate-5740 per 1 Cum. | 0.76 | cum | 5,740 | ₹4,389.38 |
| 3 | NA-F31160-Non SOR-construction of shed with appropriate quantity and quality of MS tubelar pipe, trusses, purlin and covering the above area with moduler style G.I profileappropriate quantity and quality of MS tubelar pipe, trusses, purlin and covering the above area with moduler style G.I profile sheeting-Rate-4300.00 per 1 Sqm. | 98 | sqm | 4,300 | ₹4,21,400 |
| 4 | PAINTING AND DISTEMPERING-Painting on iron work with one coat of priming coat and two coat with superior synthetic enamel including supply of all material etc all comp. Painting on 43 iron work with one coat of priming coat and two coat with superior synthetic enamel including supply of all material etc all comp.-Rate-103.00 per 1 Sqm. | 43 | sqm | 103 | ₹4,429 |
| 5 | Cartage-Cartage of ballast, kankar, coal, grit of sand etc including loading and unloading but exccluding stacking on pucca roads(3 km). Cartage of ballast, kankar, coal, grit of sand etc,including loading and unloading but exccluding stacking on pucca roads.-Rate-116.96 per 1 Cum. | 3.38 | cum | 116.96 | ₹394.74 |
| 6 | Non-Sor-F31056-Non SOR-Supply and fixing of Sign board with pedastal including all labour work Supply and fixing of Sign board with pedastal including all labour work-Rate-3840.00 per 1 nos. | 1 | nos | 3,840 | ₹3,840 |
| 7 | MILD STEEL & IRON WORK-steel work welded in built up sections/framed work including cutting hoisting fixing in position and steel work welded in built up applying a priming coat etc all comp sections/framed work including cutting hoisting fixing in position and applying a priming coat etc all comp-Rate-120.00 per 1 kg | 1,709.88 | kg | 120 | ₹2,05,185.6 |
| 8 | TAX18% | 1 | TaX | 1,15,298.23 | ₹1,15,298.23 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.46 MB
BOQ_2243597.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .