Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC | ₹10.7 L | L1 | Accepted-AOC Low Level Quoted |
| 2 | Rejected-Technical | - | - | Rejected-Technical High Level Quoted |
| Sl No | Description | Qty | Unit | K.V.MANOHARAN L2 | K.PARAMESWARI L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth sides of foundation.As per Ss 20A | 18.46 | cum | 235 ₹4,338.10 | 224 ₹4,135.04 |
| 2.00 | C.C. 1:4:8. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete. | 70.41 | cum | 5,010 ₹3.5 L | 4,981 ₹3.5 L |
| 3.00 | Supply and erecting centering for sides and soffits including cost and conveyance and all other labour chargesetc.complete. | 217.2 | Sqm | 488 ₹1.1 L | 476 ₹1.0 L |
| 4.00 | C.C. 1:2:4. Mix using 20MM HBG metal including cost and conveyance and all other labour charges & centering for the side surfaces etc.complete. | 69.64 | Cum | 6,389 ₹4.4 L | 6,353 ₹4.4 L |
| 5.00 | Supplying and fixing of Bitumen pad for expansion joints | 13.58 | Sqm | 286 ₹3,883.88 | 236 ₹3,204.88 |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 1,64,141.94 ₹1.6 L | 1,62,695.21 ₹1.6 L |
Tender Value
Refer Docs
EMD Value
₹10,760
Closing Date
11 Mar 2024, 4:00 pmClosed
Block Development Officer,Uthiramerur
Block Development Office,Uthiramerur
Providing for Cement Road in Pillaiyar Koil Street Guruvadi Village at Agaramduli Panchayat,Uthiramerur Panchayat Union
2024_RDTN_437635_1
2242/2023/A2 Dt. .03.2024
Open Tender
Civil Works
Uthiramerur
Providing for Cement Road in Pillaiyar Koil Street Guruvadi Village at Agaramduli Panchayat,Uthiramerur Panchayat Union
2 documents required · 2 mandatory
₹0
₹10,760
22 Dec 2025
4 Mar 2024
11 Mar 2024
4 Mar 2024
11 Mar 2024
4 Mar 2024
Amount
Earth work Excavation for Foundation in all soils and Sub Soil to full depth sides of foundation.As per Ss 20A
C.C. 1:4:8. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete.
Supply and erecting centering for sides and soffits including cost and conveyance and all other labour chargesetc.complete.
C.C. 1:2:4. Mix using 20MM HBG metal including cost and conveyance and all other labour charges & centering for the side surfaces etc.complete.
Supplying and fixing of Bitumen pad for expansion joints
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.V.MANOHARAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_520410.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid