Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC 302 1 | PRAYAGRAJ | UTTAR PRADESH | 211001 | L1 | Accepted-AOC Award Of Contract | |
| 2 | L2₹7.9 L+₹50,875 (6.88%)Rejected-Finance AYODHYA | UTTAR PRADESH | 224001 | L2 | Rejected-Finance Higher Rate in Tender | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
21 Sept 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE MCD
Office of The EE MCD Irrigation Coloney Fatahan Mirzapur
Estimate for Construction of V.R.B. at Km. 1.600 of Sarauli Mr Under Project for madhupur Dy and GMC km 32.00 to 41.600 LOT-04
2022_UPIDC_728443_4
Tender Notice No-03/EEMCD/2022-23
Open Tender
Civil Works
Item Rate
90 days
Sonebhadra
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹20,000
13 Dec 2022
16 Sept 2022
21 Sept 2022
16 Sept 2022
21 Sept 2022
16 Sept 2022
90 days
Amount
E/W Excavation of Foundation in ordinary soil/sandy loam, clay or sand, soil mixed with boulder/ set slush in canal section including lift upto 1.5 m. & lead upto 30 m with disposal of excavation earth as directed by Engg-in-charge.
Preparation of subgrade for lining work excuding cost of earth work including cost of all material, labour, T&P, Taxes etc. required for proper completion of work.
P/L 100 mm thick Local sand in filter in bed and slope with cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying C.C. (1:3:6) in foundation with cement, course sand and hard stone ballast including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
P/L 100 mm thick Kattal in filter in bed and slope with cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying R.R. stone masonery with (1:3) cement & course sand mortar including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying C.R. stone masonery with (1:3) cement & course sand mortar including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Cement sand (1:2) pointing on stone masonery including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Providing shuttering and centering work for different parts of structure including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying RCC (1:1.5:3) for slab and wearing coat work with cement, course sand FM not less than 2.0 and hard stone grit 4.75 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Carriage, cutting, bending, binding & placing of steel reinforcement and binding wire including all cost of material, labour, T&P, Taxes etc. but excluding cost of binding wire, required for proper completion of work.
Laying and fixing of joint filler board 18 mm thick including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
E/w for canal section and in back filling of walls with a total lead upto 1.0 km. by truck or tractor trolley including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
M/S RAJENDRA PRASAD
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .