| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-Finance | ₹3.3 L | L1 | Accepted-Finance Being 1st lowest |
| 2 | L2₹3.4 LRejected-Finance | ₹3.4 L | L2 | Rejected-Finance Being 2nd lowest |
| Sl No | Description | Qty | Unit | THINGUJAM KOLIN SINGH L2 | Maibam Chittaranjan Singh L1 |
|---|---|---|---|---|---|
| 1.00Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | |||||
| 1.01 | (a) 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.9 | Cum | 21,000 ₹18,900 | 20,000 ₹18,000 |
| 2.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.8 | Cum | 21,500 ₹60,200 | 21,500 ₹60,200 |
| 3.00Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 3.01 | (a) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 12 | Sqm | 1,000 ₹12,000 | 950 ₹11,400 |
| 3.02 | (b) Columns, Pillars, Piers, Abutments, Posts and Struts | 6 | Sqm | 1,250 ₹7,500 | 1,250 ₹7,500 |
| 4.00Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | |||||
| 4.01 | (a) Thermo-Mechanically Treated bars of grade Fe-500D or more. | 400 | Kg | 160 ₹64,000 | 150 ₹60,000 |
| 5.00 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). | 11 | Sqm | 500 ₹5,500 | 450 ₹4,950 |
| 6.00Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. | |||||
Tender Value
Refer Docs
EMD Value
₹6,389
Closing Date
22 May 2026, 3:00 pmClosed
Executive Engineer(C)
2nd floor BSNL Bhawan Imphal
Fabrication and erection of 10 M welded and braces pole structure on RCC base at roof at New BTS Site at Kakching Khunou Manipur
2026_BSNL_277529_1
08/EE/BSNL/CD-IMP/2026-27
Open Tender
Civil Works
45 days
Kakching Khunou
Please refer Tender documents.
6 documents required · 6 mandatory
₹590
AO (Claims), O/o Sr GMTD, BSNL Imphal
₹6,389
23 Jun 2026
14 May 2026
25 May 2026
14 May 2026
22 May 2026
14 May 2026
14 May 2026 - 22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | |||||
| 1.01 | (a) 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.9 | Cum | 10,852.95 | ₹9,767.66 |
| 2 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.8 | Cum | 11,505.5 | ₹32,215.4 |
| 3Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 3.01 | (a) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 12 | Sqm | 736.4 | ₹8,836.8 |
| 3.02 | (b) Columns, Pillars, Piers, Abutments, Posts and Struts | 6 | Sqm | 961.3 | ₹5,767.8 |
| 4Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | |||||
| 4.01 | (a) Thermo-Mechanically Treated bars of grade Fe-500D or more. | 400 | Kg | 107.85 | ₹43,140 |
| 5 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). | 11 | Sqm | 300.45 | ₹3,304.95 |
| 6Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tendernotice_2.pdf
PDF • 0.97 MB
BOQ_324104.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid