| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-Finance | ₹11.6 L | L1 | Accepted-Finance 1st Stood Lowest-Priced |
| 2 | L2₹13.1 LRejected-Finance AURABINDA PALLY RABINDRA SARANI SILIGURI 734006 | SILIGURI | DARJEELING | WEST BENGAL | 734006 | ₹13.1 L | L2 | Rejected-Finance 2nd Stood Lowest-Priced |
| 3 | L3₹13.2 LRejected-Finance JYOTIRMAY COLONY WARD NO 32 P O SILIGURI BAZAR P S BHAKTINAGAR SILIGURI JALPAIGURI 734005 | SILIGURI | JALPAIGURI | WEST BENGAL | 734005 | ₹13.2 L | L3 | Rejected-Finance 3rd Stood Lowest-Priced |
| 4 | Rejected-Technical SURYANAGAR COLONY NEAR MAHILA COLLEGE SILIGURI 06 | SILIGURI | DARJEELING | WEST BENGAL | 734006 | - | - | Rejected-Technical Not Satisfied |
Tender Value
₹12.0 L
EMD Value
₹22,000
Closing Date
2 Mar 2026, 6:00 pmClosed
Executive Engineer_Kalimpong Electrical DivisioN
Government of West Bengal Office of the Executive Engineer, PWD Kalimpong Electrical Division Upper Cart Road, Near DM Bungalow Kalimpong-734301
Temporary lighting arrangement at different DC/RC pandels, cell, compound illumination and Counting Hall in the premises of SUMI School, Kalimpong for ensuing General Election to WBLA-2026.
2026_WBPWD_1003932_1
WBPWD/EE/KED/e-NIT- 03 of 2025-26
Open Tender
Electrical Work/ Equipment
7 days
Kalimpong
Please refer Tender documents.
4 documents required · 4 mandatory
₹22,000
Yes
9 Mar 2026
11 Feb 2026
5 Mar 2026
11 Feb 2026
2 Mar 2026
11 Feb 2026
S/Providing on hire basis 500V,200A TPNIC switch on wooden plank incl. providing connection and earthing attachment and dismantling the same at the end of programme. a) Upto 3 days
b) For rest 34 days
S/Providing on hire basis 415 V, 6 Way, 63 amp TPN MCB DB on wooden plank board or suitable angle iron frame incl. providing interconnection, socketing, earthing attachment etc. & dismantling the same at the end of the program as per direction of E.I.C. (with PWD approved materials) a) Upto 3 days
b) For rest 34 days
S/Providing on hire basis 250 V, (2+12) Way, SPN MCB DB on wooden plank board or suitable angle iron frame incl. providing interconnection, socketing, earthing attachment etc. & dismantling the same at the end of the program as per direction of E.I.C. (with PWD approved materials) a) Upto 3 days
b) For rest 34 days
S/Providing on hire basis of different K/K Fuse and dismantling the same full fabricated set comprising with 500V-200A- 03nos 500V-63A-TPN-10 nos 500V-32A TPN-22 nos 500V-100A TPN-07 nos a) Upto 3 days
b) For rest 34 days
S/Providing on hire basis 240V,250 Watt HPSV/Metal/LED Flood light fittings complete with bracket clamp etc incl. dismantling the same fixing at different places at School Ground as per direction of EIC a) Upto 3 days
b) For rest 34 days
c) For the day of counting
S/Providing,Earthing with 50mm dia G.I. pipe 2.5 to 3 mtr long and 6/8 SWG GI wire galvanized nuts and bolts washer etc. Below ground level on hire basis and dismantling same. a) Upto 3 days
b) For rest 34 days
c) For the day of counting
Supplying & Drawing on Hire Basis Single Phase Dist Wiring With 2.5/ 4/6 Sqmm with Earth Wire (1x 2.5 / 1x4) Sqmm Or its equivalent PVC copper wiring in suitable alkhathene pipe on the hire basis incl. dismantling the same per meter a) Upto 3 days
b) For rest 34 days
Distribution wiring in 2 or 3 x 1.5 Sqmm single core PVC copper wire to light/fan points incl. fixing holder, switch and double board etc. complete on hire basis and dismantling the same (Av. Run 6 mtr.) a) Upto 3 days
b) For rest 34 days
Supplying & Drawing on Hire Basis Single Phase Dist WiringWith 3X1.5 Sqmm with Earth Wire Or its equivalent PVC copper wiring in suitable alkhathene pipe on the hire basis incl. dismantling the same . Avg Run 10 mtr. a) Upto 3 days
b) For rest 34 days
Supplying & providing single/twin LED fitting complete with tube, commercial type (4 ft) box type single/twin fitting on hire basis and dismantling the same (As per approved by E.I.C.) a) Upto 3 days
b) For rest 34 days
S/Providing on hire basis call bell and extension cord incl. dismantling the same. a) Upto 3 days
b) For rest 34 days
Supplying & providing 1 no Seperate 20 amp plug and Switch with 150X100X65mm MS/TW switch Board on Hire basis and dismantaling the same a) Upto 3 days
b) For rest 34 days
Supplying & providing 1 no Seperate 6 amp plug and Switch with 150X100X65mm MS/TW switch Board on Hire basis and dismantaling the same a) Upto 3 days
b) For rest 34 days
S/Providing on hire basis 1.1 KV Gr. 4x95sq.mm PVC/XLPE armoured cable at least 230 mm below ground incl. laying in trench incl. dismantling the same. a) Upto 3 days
b) For rest 34 days
S/Providing on hire basis 1.1KV Gr.4x16sq.mm PVC/XLPE cable incl. laying in trench incl. dismantling the same. a) Upto 3 days
b) For rest 34 days
S/Providing on hire basis 1.1KV Gr.4x35sq.mm PVC/XLPE cable incl. laying in trench incl. dismantling the same a) Upto 3 days
b) For rest 34 days
S/Providing on hire basis pendent light (9/12w) LED fitting incl. 9/12 Watt LED lamp complete with lamp shade etc. incl. dismantling the same. a) Upto 3 days
b) For rest 34 days
S/Providing on hire basis pendent light fitting 23 Watt CFL lamp complete with lamp shade etc. incl. dismantling the same. a) Upto 3 days
b) For rest 34 days
S/Providing on hire basis of 11 Mtr long steel pole incl. carrying charges fromCo's work shop to site and making provision for 4 nos metal fittings at the top as per direction of EIC and back to same incl. loading and unloading. a) Upto 3 days
Errection of above steel pole below Gr. Level as per direction of EIC incl. disconnect the same.
S/Providing on hire basis of 9 mtr long wooden pole incl. carrying charges from Co's work shop to site and back to same incl. loading and unloading. a) Upto 3 days
Erection of wooden pole below Gr. Level as per direction of EIC incl. disconnect the same.
S/F Bamboo pole on hire for supporting PVC cable and the same. a) Upto 3 days
S/Providing on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. Providing interconnection wiring with socketing, earthing attachment etc. and dismentaling at the of end function (with PWD / E.I.C. approved materials 415 V, 100A TPN Off Load Change Over switch switch incl inter connection and dismantling the same. a) Upto 3 days
Providing on hire basis 250 Volt, 850/ 925 VA single phase UPS incl. 150 AH, 12 Volt battery complete set incl dismantling the same as per direction of E.I.C. a) Upto 37 days
Supplying & providing & connecting with Existing electrical panel ( With appropriate cable supplied by Contractor )on hire basis different KVA Three phase DG set of Follwing Ratings and dismantling the same, excluding fuel charges A) 40 KVA DG set- 1 Set. i) Upto 3 days
ii) Upto 6 days
Supplying & providing & connecting with Existing electrical panel ( With appropriate cable supplied by Contractor )on hire basis different KVA Three phase DG set of Follwing Ratings and dismantling the same, excluding fuel charges B) 62.5 KVA DG set- 1 set. i) Upto 3 days
ii) Upto 37 days
Carrying charges of all DG sets to the venue from co's workshop and back incl. loading & unloading the same.
Deployment of One no. Electrician & One no. Helper per shift per day (i.e. Total 3 nos Electrician & 3 nos Helper per day for 24 Hrs) for carring out all kind of EI maintenance & DG operations etc. For 3 Days
For 34 Days
S/Filling of H.S Diesel for DG set.
S/Providing on hire basis of Spike buster having at least 5 x 5 pin 6Amp socket with control switch ; fuse indicator etc a) Upto 3 days
b) For rest 34 days
S/Providing on hire basis of 600mm AC Pedestral / Air circulator fan a) Upto 3 days
b) For rest 34 days
Labour Welfare Cess @ 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
Tendernotice_2.pdf
PDF • 1.87 MB
BOQ_2461334.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid