Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.9 L+₹308.43 (0.04%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹8.3 L+₹39,295.63 (4.95%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹9.8 L+₹1.9 L (23.7%)Rejected-AOC | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | U.Abhishekwaran Contractor L2 | NETHAJI L4 | VICTORY CONSTRUCTIONS L3 | P PICHANDI L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work Excavation and Depositing on banks with in Intial Lead of 10 m and initial Lift | 28.8 | Cum | 100 ₹2,880 Lowest | 200 ₹5,760 | 110 ₹3,168 | 106.83 ₹3,076.7 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance and all labour charges etc | 65.44 | Cum | 4,000 ₹2,61,760 Lowest | 5,278.18 ₹3,45,404.1 | 4,550 ₹2,97,752 | 4,275.33 ₹2,79,777.6 |
| 3.00 | Supply and erecting for sides and soffis including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges | 216 | Sqm | 150 ₹32,400 | 182.5 ₹39,420 | 135 ₹29,160 Lowest | 147.83 ₹31,931.28 |
| 4.00 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 67.08 | Cum | 5,600 ₹3,75,648 | 6,582.17 ₹4,41,531.96 | 5,600 ₹3,75,648 | 5,331.56 ₹3,57,641.04 Lowest |
| 5.00 | GST 18% | 1 | No | 1,21,083.84 ₹1,21,083.84 | 1,49,780.89 ₹1,49,780.89 | 1,27,031.04 ₹1,27,031.04 | 1,21,036.79 ₹1,21,036.79 Lowest |
Tender Value
Refer Docs
EMD Value
₹9,920
Closing Date
10 Mar 2026, 3:00 pmClosed
The Block development officer, Arcot
The Block development office, Arcot
Providing Cement Concrete Pavement at Muthumaiyamman Kovil Street in Sambashivapuram H/O Sambashivapuram Panchayat
2026_RDTN_671260_1
A1/670/2026
Open Tender
Civil Works
Works
30 days
The Block development office, Arcot
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,920
14 Mar 2026
6 Mar 2026
10 Mar 2026
6 Mar 2026
10 Mar 2026
6 Mar 2026
Earth work Excavation and Depositing on banks with in Intial Lead of 10 m and initial Lift
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance and all labour charges etc
Supply and erecting for sides and soffis including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_806709.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_806709.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .