Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.7 LAccepted-AOC | ₹31.7 L | L1 | Accepted-AOC Being Lowest quoted bidder |
| 2 | L2₹32.9 L+₹1.2 L (3.65%)Rejected-Finance BEHIND POWER HOUSE WARD NO 6 UDASAR BIKANER RAJASTHAN 334022 | BIKANER | RAJASTHAN | 334022 | ₹32.9 L+₹1.2 L (3.65%) | L2 | Rejected-Finance other than lowest bidder |
| 3 | L3₹33.9 L+₹2.2 L (6.83%)Rejected-Finance | ₹33.9 L+₹2.2 L (6.83%) | L3 | Rejected-Finance other than lowest bidder |
| 4 | L4₹34.5 L+₹2.7 L (8.56%)Rejected-Finance | ₹34.5 L+₹2.7 L (8.56%) | L4 | Rejected-Finance other than lowest bidder |
| 5 | L5₹35.2 L+₹3.4 L (10.8%)Rejected-Finance | ₹35.2 L+₹3.4 L (10.8%) | L5 | Rejected-Finance other than lowest bidder |
| Sl No | Description | Qty | Unit | m/s gaurav enterprises L3 | Beenu Co. Company L7 | SHREE JASWANT CONSTRUCTION COMPANY L6 | RAJENDER ENTERPRISES L1 | M/s ASHAPURA CONSTRUCTION COMPANY L5 | BIDAWAT ENTERPRISES L2 | MANOJ ENTERPRISES L4 | J.D INFRA ENGINEERING L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking up / down 100mm bore CI /DI water mains and connections incl fittings any type from trenches / walls / floors (of any location) for replacement / re use in old / new location / diversion by burning out /including removing of lead joint / tyton joint/ rubber gasket joint complete all as specified and directed.
Note : (i) Necessary earthwork, if any, will be measured and paid separately under respective items of this schedule.
(ii) No separate payment for dismantling of fittings /joints as applicable shall be allowed. | 400 | RM | 17 ₹6,800 | 14 ₹5,600 | 18 ₹7,200 | 9 ₹3,600 Lowest | 12 ₹4,800 | 10 ₹4,000 | 20 ₹8,000 | 12 ₹4,800 |
| 2.00 | Taking up / down 150mm bore CI /DI water mains and connections incl fittings any type from trenches / walls / floors (of any location) for replacement / re use in old / new location / diversion by burning out /including removing of lead joint / tyton joint/ rubber gasket joint complete all as specified and directed.
Note : (i) Necessary earthwork, if any, will be measured and paid separately under respective items of this schedule.
(ii) No separate payment for dismantling of fittings /joints as applicable shall be allowed. | 600 | RM | 17 ₹10,200 | 16 ₹9,600 | 18 ₹10,800 | 9 ₹5,400 Lowest | 20 ₹12,000 | 15 ₹9,000 | 20 ₹12,000 | 17 ₹10,200 |
| 3.00 | Laying only 100 mm bore CI / DI water mains after thoroughly cleaning, with new fittings fixed to wall/ ceiling/ floor or laid in trenches including new tyton rubber gasket complete all as specified and directed.
Note: (i) Old serviceable pipe retrieved by taking up / dismantling shall be re-used.
(ii) Unit rate of this item includes the cost of Fittings such as bend, tee, socket and joints etc. | 50 | RM | 35 ₹1,750 | 28 ₹1,400 | 40 ₹2,000 | 18 ₹900 Lowest | 30 ₹1,500 | 25 ₹1,250 | 36 ₹1,800 | 45 ₹2,250 |
| 4.00 | Laying only 150 mm bore CI / DI water mains after thoroughly cleaning, with new fittings fixed to wall/ ceiling/ floor or laid in trenches including new tyton rubber gasket complete all as specified and directed.
Note: (i) Old serviceable pipe retrieved by taking up / dismantling shall be re-used.
(ii) Unit rate of this item includes the cost of Fittings such as bend, tee, socket and joints etc . | 100 | RM | 45 ₹4,500 | 60 ₹6,000 | 50 ₹5,000 | 18 ₹1,800 Lowest | 40 ₹4,000 | 38 ₹3,800 | 42 ₹4,200 | 52 ₹5,200 |
| 5.00 | Supply, laying and testing 100 mm bore Ductile Iron water mains with spigot and socket ends, K7 in any length, laid in trenches / walls / floor / ceilings with new fittings complete all as specified and directed.
Note:- (i) Excavation and earth work shall be measured and paid for separately under respective item of this schedule.
(ii) Joints and DI fittings shall be inclusive of quotated rate under respective item of this Schedule. | 350 | RM | 1,610 ₹5,63,500 | 1,710 ₹5,98,500 | 1,625 ₹5,68,750 | 1,530 ₹5,35,500 Lowest | 1,640 ₹5,74,000 | 1,594 ₹5,57,900 | 1,595 ₹5,58,250 | 1,700 ₹5,95,000 |
| 6.00 | Supply, laying and testing 150 mm bore Ductile Iron water mains with spigot and socket ends, K7 in any length, laid in trenches / walls / floor / ceilings with new fittings complete all as specified and directed.
Note:- (i) Excavation and earth work shall be measured and paid for separately under respective item of this schedule.
(ii) Joints and DI fittings shall be inclusive of quotated rate under respective item of this Schedule. | 500 | RM | 2,020 ₹10,10,000 | 2,060 ₹10,30,000 | 2,100 ₹10,50,000 | 1,908 ₹9,54,000 Lowest | 2,070 ₹10,35,000 | 1,995 ₹9,97,500 | 1,990 ₹9,95,000 | 2,200 ₹11,00,000 |
| 7.00 | Excavation in trenches in soft / loose soil n.exc 1.5 m wide for foundation etc or for shafts, wells cesspits, manholes etc not exceeding 10 Sqm on plan and n.exc 1.5 m in depth and getting out complete all as specified and directed. | 886.09 | Cum | 120 ₹1,06,330.8 | 135 ₹1,19,622.15 | 130 ₹1,15,191.7 | 108 ₹95,697.72 Lowest | 125 ₹1,10,761.25 | 119 ₹1,05,444.71 | 125 ₹1,10,761.25 | 140 ₹1,24,052.6 |
| 8.00 | Returning, filling in, including spreading levelling, watering and well ramming in layers n.exc 25 cm complete all as specified and directed. | 769.98 | Cum | 22 ₹16,939.56 | 30 ₹23,099.4 | 23 ₹17,709.54 | 9 ₹6,929.82 Lowest | 20 ₹15,399.6 | 21 ₹16,169.58 | 21 ₹16,169.58 | 25 ₹19,249.5 |
| 9.00 | Removing excavated material n.exc 50 m and deposited where directed at a level not exceeding 50 metre above the starting point in soil complete all as specified and directed. | 116.11 | Cum | 25 ₹2,902.75 | 30 ₹3,483.3 | 35 ₹4,063.85 | 9 ₹1,044.99 Lowest | 25 ₹2,902.75 | 21 ₹2,438.31 | 32 ₹3,715.52 | 28 ₹3,251.08 |
| 10.00 | Attending complaints like no water supply, leakages/broken in GI/CI/DI pipe line upto 150mm dia and rectify the leekage incl all fittings like elbow, socket, tee, bends, union etc and making new thread as required at sie incl excavation of earth, returning filling, removal of soil & cleaning of site complete all as specified and directed.
Notes 1. Excavation and earthwork upto 1 mtr is deemed to be included in quoted rate. 2. Cutting of existing PCC/RCC surfaces and making good as earlier Rate shall deemed to be included in qouted rates.
3. Complaints of urgent nature will be attended round the clock to restore the water supply
4. Contractor /authorised reps shall collect the complaints recorded/entered in complaint register from Sub Div duly signed by JE everday. All complaints assigned shall be attended and resolved within same day otherwise Penal recovery @ Rs 500/- per day per complaint shall be recovered from contractor's payment
5. Contractor shall also provide list of labour appointed for daily complaints and also list of personnel to attend complaints in case of absence of regular labour.
6. It will be the sole responsibility of the contractor/ authtorized reps to obtain the signature of users on complaint slip after completing the work. No payment shall be claimable on unsigned slips. | 200 | Each Job | 310 ₹62,000 | 400 ₹80,000 | 325 ₹65,000 | 270 ₹54,000 | 300 ₹60,000 | 260 ₹52,000 Lowest | 290 ₹58,000 | 360 ₹72,000 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
1 Jul 2026, 6:00 pmClosed
GE AF NAL
GE AF NAL
As mentioned and described in BOQ
2026_MES_771555_1
GE (AF) NAL /T-34/2026-27
Open Tender
Civil Works
Item Rate
270 days
GE AF NAL
As per NIT and Tender documents class D and above and category a(ii)
9 documents required · 9 mandatory
₹500
GE AF NAL
₹60,000
Yes
7 Sept 2026
11 Jun 2026
3 Jul 2026
11 Jun 2026
1 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking up / down 100mm bore CI /DI water mains and connections incl fittings any type from trenches / walls / floors (of any location) for replacement / re use in old / new location / diversion by burning out /including removing of lead joint / tyton joint/ rubber gasket joint complete all as specified and directed.
Note : (i) Necessary earthwork, if any, will be measured and paid separately under respective items of this schedule.
(ii) No separate payment for dismantling of fittings /joints as applicable shall be allowed. | 400 | RM | 10 | ₹4,000 |
| 2 | Taking up / down 150mm bore CI /DI water mains and connections incl fittings any type from trenches / walls / floors (of any location) for replacement / re use in old / new location / diversion by burning out /including removing of lead joint / tyton joint/ rubber gasket joint complete all as specified and directed.
Note : (i) Necessary earthwork, if any, will be measured and paid separately under respective items of this schedule.
(ii) No separate payment for dismantling of fittings /joints as applicable shall be allowed. | 600 | RM | 1.25 | ₹750 |
| 3 | Laying only 100 mm bore CI / DI water mains after thoroughly cleaning, with new fittings fixed to wall/ ceiling/ floor or laid in trenches including new tyton rubber gasket complete all as specified and directed.
Note: (i) Old serviceable pipe retrieved by taking up / dismantling shall be re-used.
(ii) Unit rate of this item includes the cost of Fittings such as bend, tee, socket and joints etc. | 50 | RM | - | - |
| 4 | Laying only 150 mm bore CI / DI water mains after thoroughly cleaning, with new fittings fixed to wall/ ceiling/ floor or laid in trenches including new tyton rubber gasket complete all as specified and directed.
Note: (i) Old serviceable pipe retrieved by taking up / dismantling shall be re-used.
(ii) Unit rate of this item includes the cost of Fittings such as bend, tee, socket and joints etc . | 100 | RM | 22 | ₹2,200 |
| 5 | Supply, laying and testing 100 mm bore Ductile Iron water mains with spigot and socket ends, K7 in any length, laid in trenches / walls / floor / ceilings with new fittings complete all as specified and directed.
Note:- (i) Excavation and earth work shall be measured and paid for separately under respective item of this schedule.
(ii) Joints and DI fittings shall be inclusive of quotated rate under respective item of this Schedule. | 350 | RM | 22 | ₹7,700 |
| 6 | Supply, laying and testing 150 mm bore Ductile Iron water mains with spigot and socket ends, K7 in any length, laid in trenches / walls / floor / ceilings with new fittings complete all as specified and directed.
Note:- (i) Excavation and earth work shall be measured and paid for separately under respective item of this schedule.
(ii) Joints and DI fittings shall be inclusive of quotated rate under respective item of this Schedule. | 500 | RM | - | - |
| 7 | Excavation in trenches in soft / loose soil n.exc 1.5 m wide for foundation etc or for shafts, wells cesspits, manholes etc not exceeding 10 Sqm on plan and n.exc 1.5 m in depth and getting out complete all as specified and directed. | 886.09 | Cum | 22 | ₹19,493.98 |
| 8 | Returning, filling in, including spreading levelling, watering and well ramming in layers n.exc 25 cm complete all as specified and directed. | 769.98 | Cum | 22 | ₹16,939.56 |
| 9 | Removing excavated material n.exc 50 m and deposited where directed at a level not exceeding 50 metre above the starting point in soil complete all as specified and directed. | 116.11 | Cum | 10 | ₹1,161.1 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_863992.xls
BOQ • 0.33 MB
Tender34.pdf
Tender Documents • 2.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .