Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.8 L
Closing Date
30 Nov 2026, 3:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer
CMU NIT Warangal
Proposed outdoor white marble stone water fountain installation in front of the ECE Department at NIT Warangal
2026_NITW_933690_1
17/NITW/CMU/EMP/CIVIL/26-27
Limited
Civil Works
Works
30 days
NIT WARANGAL
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
9 Nov 2026
9 Nov 2026
1 Dec 2026
9 Nov 2026
30 Nov 2026
9 Nov 2026
9 Nov 2026 - 23 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Installation of three storied outdoor white marble stone water fountain Including
1. White marble stone water fountain
2. Motor Charges (0.5 HP - 1 HP)
3. Electrical Power supply (Earthing & Insulation and weatherproof electrical connections)
4. Lighting system ( LED underwater lights (12V), Waterproof fittings)
5. Control system
6. Transport & Delivery
7. Installation & fitting charges (Including Civil base preparation, Electrical wiring & Pump installation, Testing and commissioning of fountain) | 1 | each | 3,79,960 | ₹3,79,960 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 4 | cum | 2,004.57 | ₹8,018.28 |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1 | cum | 2,368.53 | ₹2,368.53 |
| 4 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 7 | cum | 256.82 | ₹1,797.74 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. All kinds of soil | 5 | cum | 172.71 | ₹863.55 |
| 6 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer in-Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 | 2 | cum | 2,708.83 | ₹5,417.66 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | cum | 7,097.74 | ₹14,195.48 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts: (Columns) | 8 | sqm | 935.34 | ₹7,482.72 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) derived from natural sources. | 3 | cum | 10,559.92 | ₹31,679.76 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 81 | kgs | 104.94 | ₹8,500.14 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
Tendernotice_2.pdf
PDF • 0.07 MB
tenderdocecefountain.pdf
Tender Documents • 0.76 MB
nietf.pdf
Additional Documents • 0.05 MB
BOQ_981172.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .